0% found this document useful (0 votes)
162 views1 page

Activation Flow Chart

The document outlines the CP Activation Flow Chart for earthquake response, detailing the steps taken following a 7.8 magnitude earthquake. It describes the activation of the Incident Command System (ICS) based on the situation's status and the mobilization of committees and Incident Management Teams (IMT). The flow chart concludes with the demobilization process once the situation is normalized.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
162 views1 page

Activation Flow Chart

The document outlines the CP Activation Flow Chart for earthquake response, detailing the steps taken following a 7.8 magnitude earthquake. It describes the activation of the Incident Command System (ICS) based on the situation's status and the mobilization of committees and Incident Management Teams (IMT). The flow chart concludes with the demobilization process once the situation is normalized.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

CP Activation Flow Chart for EARTHQUAKE

START

Earthquake strikes 7.8


magnitude. SDRRMC
conducts RDANA
1
2

Yes Activate No
ICS on red alert ICS on blue alert
status contingency
status
plan?

SH convenes Committees
the committees conduct normal
at the ICP 3
operations using
ICS

SH mobilizes and
deploys IMT Committees provide
continuous support to
responders
Committees and IMT
operate based on
contingency plan No
Situation
3
normalize
No d?
Situation Yes
improved? 1

IC recommends
Yes demobilization

IC recommends
deactivation of SH approves recommendation
contingency plan for demobilization

SH directs deactivation Responders and committees demobilize.


of contingency plan Clusters for early recovery operate.

2 ICS returns to white


status