REVIEW-WMS CSP - Koreksi
REVIEW-WMS CSP - Koreksi
- A
REVISIONS
IT: ISSUE A - PRELIMINARY C - FOR INFORMATION E - FOR CONSTRUCTION G - AS BUILT
ATTACHMENT A_PR-E-019E_Rev_6 i
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
TABLE OF CONTENTS
ATTACHMENTS / LAMPIRAN 38
ATTACHMENT A_PR-E-019E_Rev_6 ii
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
- A
Figure 3.3 Piling Sequence for Grid 1 & Grid 12 as A (point 1 & 2) 5
Figure 3.4 Piling Sequence for Grid 24 to Grid 21 (blue mark) 6
Figure 3.5 Illustration of Piling Sequence for Grid 20 to Grid 2 As A (red mark) 7
Figure 3.6 Illustration of Piling Sequence for Grid 20 to Grid 1 As B & C 7
(purple mark)
Figure 3.7 Onshore Piling Flow Chart 8
Figure 1.1 Organization Chart 9
Figure 5.1 Illustration of Material Stock Yard Area Plan 17
Figure 5.2 Illustration of Loading Steel Pile Material to Boggie Trailer 18
Figure 5.3 Illustration of Unloading Material Equipment Arrangement 19
Figure 5.4 Flowchart of SPP Mobilization to Site 19
Figure 5.5 Illustration of Pile Handling 20
Figure 5.6 Illustration of Pile Positioning 22
Figure 5.7 Illustration of Pile Driving 23
Figure 5.8 Illustration of Pile Welding Join 24
Figure 5.9 Illustration of Calendering Process 25
Figure 5.10 Cutting Steel Pipe Pile Process 27
Figure 5.11 Illustration of pulling the pile pieces 27
ATTACHMENT A_PR-E-019E_Rev_6 iv
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
TABLE OF TABLE
ATTACHMENT A_PR-E-019E_Rev_6 v
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
This work method statement document was created to provide technical explanation regarding
the Tank & Overpass Area Piling Work that include pile handling, piling rig positioning, pile
driving, pile welding join, and PDA Test at the IGP Project – Mine of Bahodopi Block 2&3 (MBB
2&3). This document includes instructions for quality, safety, health, and environmental control.
The purpose of this document is that each work conforms to approved drawings, specifications
and standards. /
Dokumen metode kerja ini dibuat untuk memberikan penjelasan teknis mengenai pekerjaan
pemancangan area Tangki & Overpass yang meliputi pekerjaan handling pipa, pemosisan alat
pancang, pemancangan, pengelasan pipa pancang dan PDA Test pada Proyek IGP – Mine of
Bahodopi Block 2&3 (MBB 2&3). Dokumen ini mencakup instruksi untuk control kualitas,
keselamatan, kesehatan, dan lingkungan. Tujuan dokumen ini adalah bahwa setiap pekerjaan
sesuai dengan gambar, spesifikasi, dan standar yang disetujui.
Documents listed below have been used in developing this document or include instructions
and procedures applicable to it. They shall be used in their latest revision.
Dokumen yang tercantum di bawah ini telah digunakan dalam mengembangkan dokumen ini
atau termasuk instruksi dan prosedur yang berlaku untuk itu. Dokumen yang akan digunakan
adalah revisi terbaru.
ATTACHMENT A_PR-E-019E_Rev_6 1
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
Scope of works for the Tank & Overpass Area Piling Work as follows:
ATTACHMENT A_PR-E-019E_Rev_6 2
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
Tank & Overpass Area Piling Work area layout can bee seen at bellow figure :
Layout pemancangan untuk pekerjaan pemancangan area Tangki & Overpass dapat dilihat
pada gambar berikut:
AREA 2
AREA 1
ATTACHMENT A_PR-E-019E_Rev_6 3
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
Quantity of Tank & Overpass Area Pile Driving can be seen at below table:
Jumlah titik pemancangan area Tangki & Overpass dapat dilihat pada table di bawah ini:
ATTACHMENT A_PR-E-019E_Rev_6 4
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
The landfilling process will be done before piling in the Tank Area 1 & 2 to make a ramp for
access to the HSPD, because the elevation of Tank Area 1 & 2 is 70 cm higher than the road
access elevation. And after arriving at the piling site, the service crane will start to help move
the counterweight near the HSPD so that it can be stacked onto it
Proses penimbunan tanah akan dilakukan sebelum pemancangan tangki area 1 & 2 untuk
membuat ramp sebagai akses jalan untuk HSPD, karena elevasi tangki lebih tinggi 70 cm dari
elevasi akses jalan. Dan setelah sampai di lokasi pemancangan, servis crane akan mulai
membantu untuk memindahkan counterweight ke dekat HSPD agar dapat disusun ke atasnya.
The tank piling will be carried out in 2 different areas, so the following sequence of piling work
will be divided into 5 sequences
Pemancangan tangki akan dilakukan di 2 area berbeda, maka berikut urutan pekerjaan
pemancangan akan dibagi menjadi 5 urutan.
1. TQ-2221BA-02 (Area 1)
Piling will begin at this location to immediately use the material above the location of
TQ-2562BA-01, so that the landfilling process at that location can be carried out
immediately.
Pemancangan akan dilakukan pada lokasi ini agar dapat segera menggunakan material
yang berada di atas lokasi TQ-2562BA-01, sehingga proses penimbunan tanah pada
lokasi tersebut dapat segera dilakukan.
2. TQ-2221BA-01 (Area 1)
ATTACHMENT A_PR-E-019E_Rev_6 5
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
The next piling will be at this location, so that the landfilling at the location of TQ-2562BA-
01 can be carried out simultaneously.
Pemancangan selanjutnya akan dilakukan pada lokasi ini, agar penimbunan tanah di
lokasi TQ-2562BA-01 dapat bersamaan dilakukan.
3. TQ-2562BA-01 (Area 1)
Piling sequence will be focused on this area. Illustration of piling sequence can be seen
at bellow figure:
Urutan pemancangan akan berfokus pada area ini. Ilustrasi proses pemancangan pada
area ini dapat dilihat pada gambar di bawah ini:
4. TQ-2541BA-01 (Area 2)
ATTACHMENT A_PR-E-019E_Rev_6 6
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
Piling will start at this location, so material transportation can still be carried out
simultaneously with the piling work. The piling line will be performed as in Area 1.
Pemancangan akan dimulai di lokasi ini, jadi transportasi material tetap dapat
dilakukan secara simultan dengan pekerjaan pemancangan. Jalur pemancangan
akan dilakukan seperti pada Area 1.
5. TQ-2541BA-02 (Area 2)
Illustration of piling work sequence for this area can be seen at figure below :
Ilustrasi urutan pemancangan di area ini dapat dilhat pada gambar di bawah ini:
ATTACHMENT A_PR-E-019E_Rev_6 7
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
The Overpass Area piling work will be carried out in 2 different areas, so the following
sequence of piling work will be divided into 2 sequences.
Pemancangan area Overpass akan dilakukan di 2 area berbeda, maka berikut urutan
pekerjaan pemancangan akan dibagi menjadi 2 urutan.
1. Abutment 2
To facilitate mobilization from the tank area, piling will commence at this location.
Material transfer from the stockyard near abutment 1 will be supported by service
crane & trailer. The piling line will be performed as shown below :
Agar memudahkan mobilisasi dari area tangki, maka pemancangan akan dimulai
di lokasi ini. Pemindahan material dari stockyar di abutment 1 akan didukung
dengan servis crane & trailer. Jalur pemancangan akan dilakukan seperti pada
dibawah ini :
ATTACHMENT A_PR-E-019E_Rev_6 8
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
2. Abutment 1
The HSPD moved to abutment 1 and continued with the piling sequence as shown
in the figure below:
ATTACHMENT A_PR-E-019E_Rev_6 9
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
START
FINISH
ABUTMENT 1
ATTACHMENT A_PR-E-019E_Rev_6 10
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
Flowchart of Tank & Overpass Area Piling Work can be seen at below figure:
Alur pekerjaan pemancangan di area Tangki & Overpass dapat dilihat pada gambar dibawah
ini:
ATTACHMENT A_PR-E-019E_Rev_6 11
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
Here is the organizational structure from PT. Pratama Widya for Tank & Overpass Area Piling
Work :
Berikut adalah struktur organisasi dari PT. Pratama Widya untuk pekerjaan pemancangan
area Tangki & Overpass :
a. Site Manager :
ATTACHMENT A_PR-E-019E_Rev_6 12
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
b. Site Engineer:
• Preparing work methods to be use as a reference in the field regarding tools &
materials
• Planning & monitoring the work stages in the field
• Preparing the shopdrawing
• Cooperating with Supervisor for monitoring the work progress
• Technical coordinating with the contractor
• Making a work progress report
ATTACHMENT A_PR-E-019E_Rev_6 13
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
c. Piling Supervisor
Piling supervisor will explain to piling team the the type of work and sequence of work
especially from the aspect of work safety and security. Piling Supervisor should
ensure that the installation plan includes:
• Understand construction design and technical aspects.
• Rearrrange construction implementation methods in accordance with field
conditions.
• Identify the type of work to be performed.
• Identify work reated to hazard.
• Carry out risk assessment.
• Develop the method to be used.
• Communicate the plan to every one onvolved.
• Review the plan before starting implementation and inform field data or changes
that occur.
• Ensure direct workers to know the job risk.
• Report any deviations and obstacle that occur int the field during implementation.
• Provide work implementation solutions if there are deviations and obstacles that
occur.
• Conduct tool box meeting before carrying out work.
Piling Supervisor akan menjelaskan kepada timnya jenis pekerjaan dan urutan
pekerjaan terutama dari aspek keselamatan dan keamanan kerja. Supervisor harus
memastikan bahwa rencana pemasangan meliputi:
• Memahami desain konstruksi dan teknisnya
• Menyusun kembali metode pelaksanaan konstruksi yang sesuai dengan kondisi
lapangan
• Mengidentifikasi jenis pekerjaan yang akan dilakukan
• Mengidentifikasi bahaya yang berhubungan dengan pekerjaan
• Melaksanakan penilaian resiko (risk assessment)
ATTACHMENT A_PR-E-019E_Rev_6 14
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
- A
e. Quality Control
• Develop Project Quality Plan (PQP) & ITP according to project requirement.
• Initiate corrective and preventive action to eliminate non-conformities according
to company procedure.
• Assess training requirements of personnel and recommend appropriate training
for personnel and workers for quality aspect.
• Ensure the works are carried out according to approved MS and Specification.
• Conduct internal quality inspection at site to ensure that site personnel, workers
and subcontractors implement good quality assurance practices at their
workplace.
• Ensure that technical and design matters are implemented.
• Compile daily records and submit to main contractor.
• Submission of Inspection Request/Notice to Client.
• Controling, maintaining traceable documents and records as per project
requirement.
• Coordinate with client relating to quality matters.
- A
f. Crane Operator
• Operate the equipment based on the correct procedure.
• Carried out P2H daily before use and risk identification or functional failure.
g. Rigger
• Select lifting gear according to safe working load capacity.
• Check the condition, secure fastening and lifting gear used.
• Carry out maintenance on lifting aids.
• Comply with regulations and carry out established safety lifting.
• Melakukan pemilihan alat bantu angkat sesuai dengan kapasitas beban kerja
yang aman.
• Melakukan pengecekan terhadap kondisi, pengikatan aman dan alat bantu
angkat yang digunakan
• Melakukan perawatan alat bantu angkat.
• Mematuhi peraturan dan melakukan tindakan pengamanan yang telah
ditetapkan.
ATTACHMENT A_PR-E-019E_Rev_6 17
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
Persiapan sebelum memulai pekerjaan pemancangan area Tangki & Overpass adalah sebagai
berikut:
ATTACHMENT A_PR-E-019E_Rev_6 18
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
• Alat bantu angkat seperti shackle slings, plat sambung, balok angkat dll, harus
teridentifikasi dan diberi tagging kemampuan maksimal angkat aman setelah
inspeksi oleh tim HSE.
• Surveyor melakukan stake out di area sekitar titik tiang pancang dan memberikan
tanda titik pemancangan pada setiap titik sebelum pemancangan dilakukan.
• Pastikan kondisi permukaan tanah rata.
• SPP Material harus di cek dan disetujui sesuai dengan spek material yang ada.
• Koordinasikan sequence pemancangan kepada owner dan stake holder.
• Pastikan semua dokumen yang berketerkaitan dengan persyaratan owner telah
dipenuhi sebelum memulai pekerjaan (Go No Go).
Spun Pile material will be stocked at stock yard near the piling area, position of stock yard area
can be seen at bellow figure:
Material Spun Pile akan dsimpan di stock yard yang berada di dekat area pemancangan, posisi
area stock yard dapat dilihat pada gambar di bawah ini:
Stockyard Area
AREA 2
AREA 1
ATTACHMENT A_PR-E-019E_Rev_6 19
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
Stockyard Area
AREA 2
AREA 1
ATTACHMENT A_PR-E-019E_Rev_6 20
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
Spun Pile material that has been placed in the lift area by the crane service & lifted using HSPD
crane and positioned in the hydraulic clamp. The lifting method to be performed is chocker tie
method, the piling equipment used is HSPD 240 T. Illustration of spun pile lifting on HSPD:
Material Spun Pile yang telah diletakkan oleh servis crane di area angkat & diangkat
menggunakan crane HSPD dan diposisikan di klam hidrolik. Metode pengangkatan yang akan
dilakukan adalah metode ikat chocker, alat pancang yang digunakan adalah HSPD 240 T.
Ilustrasi pengangkatan spun pile pada HSPD:
ATTACHMENT A_PR-E-019E_Rev_6 21
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
1 2
3 4
The piling point that has been marked by the surveyor team according to the coordinate design
on the drawing and the HSPD is positioned and in accordance with that point.
There are at least 2 surveyors who assist the pile positioning process to ensure that the pile
position is in accordance with the coordinate design and verticality is still within the existing
provisions and tolerances. For vertical checking, it can be done by using a sticky waterpass in
the X direction and Y direction. An illustration of the positioning process can be seen in the
figure below:
ATTACHMENT A_PR-E-019E_Rev_6 22
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
Titik pemancangan yang telah ditandai oleh tim surveyor sesuai dengan desain koordinat pada
gambar dan alat HSPD diposisikan dan sesuai dengan titik tersebut.
Setidaknya terdapat 2 surveyor yang membantu proses pemosisian tiang pancang untuk
memastikan posisi tiang pancang sesuai dengan desain koordinat maupun verticality masih
dalam ketentuan dan toleransi yang ada. Untuk pengecekan vertical dapat dilakukan dengan
menggunakan waterpass tempel pada arah X dan arah Y. Ilustrasi proses pemosisian dapat
dilihat pada gambar di bawah ini:
After ensuring that the pile is in the correct position, the piling process is carried out by clamping
the pile with a Clamping Box and pressing it into the ground using a hydraulic system and a
counterweight.
Setelah dipastikan tiang pancang pada posisi yang benar, proses pemancangan dilakukan
dengan cara menjepit tiang pancang dengan Clamping Box dan menekan ke dalam tanah
menggunakan sistem hidrolik dan beban berupa counterweight.
ATTACHMENT A_PR-E-019E_Rev_6 23
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
Piling records should be kept during the piling process and the position of the piles should be
monitored by the survey team to ensure that the piles are installed in accordance with the
design position and verticality.
Illustration of Pile Driving process can be seen at the figure below:
Pencatatan pancang harus dilakukan selama proses pemancangan dan posisi tiang pancang
harus dimonitoring oleh tim survey untuk memastikan tiang yang terpancang sesuai dengan
desain posisi dan verticality yang ada.
Ilustrasi proses pemancangan dapat dilihat pada gambar dibawah ini:
ATTACHMENT A_PR-E-019E_Rev_6 24
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
After the bottom piles are completed, the top pipe piling material is lifted using an HSPD crane
and positioned on top of the bottom piles that have been driven. Ensure the verticality and
position of the piles match the position of the bottom piles.
Setelah tiang pancang bagian bawah selesai di pancang, material pipa pancang bagian atas
diangkat dengan menggunakan crane HSPD dan diposisikan di atas tiang pancang bagian
bawah yang telah dipancang. Pastikan verticality dan posisi tiang pancang sesuai dengan
posisi tiang pancang bagian bawah.
Place welding habitat on boundary of the welding area. Welding process carried out according
to the approved WPS. During welding process hang the pile using crane to ensure pile not fall,
hang the pile until filler 1 or until welding join can hold the pile stably.
Illustration of piling process can be seen at the figure below:
Letakkan welding habitat pada sekeliling lokasi pemancangan. Proses pengelasan dilakukan
sesuai dengan WPS yang telah di setujui. Selama proses pengelasan tiang pancang digantung
dengan menggunakan crane HSPD untuk memastikan tiang pancang tidak terjatuh, gantung
tiang pancang sampai proses filler pertama atau sampai hasil dari pengelasan mampu
menahan beban dari pipa pancang bagian atas secara stabil.
Illustrasi proses pengelasan dapat dilihat pada gambar di bawah ini:
ATTACHMENT A_PR-E-019E_Rev_6 25
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
ATTACHMENT A_PR-E-019E_Rev_6 26
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
After welding process finished, Non-Destructive Test carried out using penetrant method, if
already accepted driving process can be continued until final set, calendering must be taken
on the manometer is 240 mPA.
Setelah proses pengelasan, dilakukan pengecekan NDT dengan metode penetran, apabila
telah memenuhi persyaratan pekerjaan pemancangan dilanjutkan sampai dengan final set dan
diambil data Kalendering pada manometer yaitu 240 mPA.
a. Attach strain transducer and accelerometer to the side section of pile with 1.5 x
Diameter (D) distance from pile head and minimum 0.5 x Diameter from ground.
b. Prepare hammer and other safety equipment.
c. On driven pile with diesel or hydraulic hammer, conduct the test with same drop
height at final set until reach the ultimate design level or maximum actual pile
capacity (maximum 10 blows).
d. For analyzing and reporting purpose, contractor shall give pile layout and piling
record of the test pile.
e. Afterward, test data will be analyzed using CAPWAP program.
a. Pasang strain transducer and accelerometer pada sisi tiang dengan jarak 1.5 x
diameter (D) dari kepala tiang dan minimum 0.5 x Diamater dari dasar tanah.
b. Persiapkan hammer dan peralatan pengaman pendukung
c. Pada tiang pancang yang menggunakan hammer diesel atau hidrolik lakukan
pengujian dengan tinggi jatuh hammer yang sama saat final set sampai mencapai
nilai utimit design yang diharapkan atau sampai actual kapasitas daya dukung tiang
(maximum 10 blows)
d. Kontraktor fondasi wajib memberikan denah serta catatan pemancangan tiang
(piling record) guna keperluan laporan dan Analisa.
e. Selanjutnya data hasil pengujian akan dianalisa menggunakan program CAPWAP
ATTACHMENT A_PR-E-019E_Rev_6 27
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
ATTACHMENT A_PR-E-019E_Rev_6 28
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
c. Cut the pile according the mark with using a cutting torch
Lakukan pemotongan pada tiang sesuai dengan tanda dengan menggunakan Pile
Cutter
d. Pull the upper pile piece with crane, make sure the lifting sling is still in good
condition and worthy to use
Angkat potongan bagian atas tiang dengan crane, pastikan sling angkat yang
digunakan dalam kondisi baik dan layak pakai
ATTACHMENT A_PR-E-019E_Rev_6 29
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
As the following Equipment which will be used in this activity has specifications according to
its function and inspection should be done prior the equipment is entering the site. This process
is intended to ensure that all the equipment will be met the requirements and be fit when they
are used:
Peralatan yang digunakan dalam pekerjaan ini memiliki spesifikasi sesuai dengan pekerjaan
yang akan dilakukan. Sebelum peralatan digunakan dalam melakukan pekerjaan,
ATTACHMENT A_PR-E-019E_Rev_6 30
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
pemeriksaan dilakukan terlebih dahulu. Proses ini untuk memastikan peralatan memenuhi
persyaratan untuk digunakan. Peralatan ini meliputi:
3 Service Crane 75 T 1
5 Trailer 1
7 Welding Machine 3
9 Pile Cutter 1
10 Hand Tools 1
ATTACHMENT A_PR-E-019E_Rev_6 31
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
2 Site Engineer 1
3 QC 1
5 HSE officer 1
8 Trailer Operator 1
9 Welder 1
10 Rigger 1
11 Crew 3
[text in english]
[text in indonesia]
ATTACHMENT A_PR-E-019E_Rev_6 32
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
Safety and health is a very important thing for PT. PP (Persero) Tbk. To avoid work
accidents in carrying out safe work on this project. PT. PP (Persero) Tbk emphasizes the
following points.:
1. All work complies with all relevant Health, Safety, and Environment (HSE)
requirements.
2. All work must be stopped during bad weather and (extreme) storms.
3. All equipment, heavy equipment must be operated by competent (certified) operators.
4. All work activities must wear Personal Protective Equipment (PPE).
5. Every waste should be separated and placed in a garbage collection and then
managed based on applicable waste management.
Personal Protective Equipment (PPE) list:
1. Safety Helmet
2. Hand Gloves
3. Safety Shoes
4. Protective Glasses
5. Life Jacket
6. Welding Apron
7. Welding Helmet
To ensure work and personnel safety during work, detailed Risk Assessment must be
submitted to the Client or stake holder for review to ensure that all safety provisions and
objectives are in alignment with Client Requirement to ensure a safe and smooth
operation on site. Permit to work shall be applied based on approved method statement
dan Risk Asessment/
ATTACHMENT A_PR-E-019E_Rev_6 33
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
Keselamatan dan kesehatan merupakan hal yang sangat penting bagi PT. PP (Persero)
Tbk. Untuk menghindari kecelakaan kerja dalam melaksanakan pekerjaan yang aman
pada proyek ini. PP (Persero) Tbk menekankan hal-hal sebagai berikut:
1. Semua pekerjaan mematuhi semua persyaratan Kesehatan, Keselamatan, dan
Lingkungan (HSE) yang relevan
2. Semua pekerjaan harus dihentikan selama cuaca buruk dan badai (ekstrem).
3. Semua peralatan, alat berat harus dioperasikan oleh operator yang kompeten
(bersertifikat)
4. Semua aktivitas kerja wajib mengenakan Alat Pelindung Diri (APD)
5. Setiap sampah harus dipisahkan dan ditempatkan dalam pengumpulan sampah
untuk kemudian dikelola berdasarkan pengelolaan sampah yang berlaku.
Untuk memastikan keselamatan kerja dan personel selama bekerja, Penilaian Resiko
terperinci harus diserahkan kepada Klien atau pemangku kepentingan untuk ditinjau guna
memastikan bahwa semua ketentuan dan tujuan keselamatan selaras dengan
Persyaratan Klien untuk memastikan operasi yang aman dan lancar di lokasi. Izin bekerja
diajukan berdasarkan pernyataan metode yang disetujui dan Penilaian Risiko.
ATTACHMENT A_PR-E-019E_Rev_6 34
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
Before construction process for each area carried out, Risk Planning must be made and
submitted to CLIENT according to methods statement, and area condition. Hazzard must
be identified and classified according to level of severity and probability and controlled to
lower the risk (mitigation and prevent the risk). Supervisor make Job Safety Analysis
document according to Risk Assessment and Steps of work, worker also must understand
each Risk caused by each work steps.
Risk Assessment and JSA can be seen in attachment.
Sebelum proses konstruksi untuk setiap area dilakukan, perencanaan resiko harus dibuat
dan disubmit ke KLIEN sesuai dengan metode kerja, dan kondisi lingkungan yang ada.
Bahaya harus diidentifikasi dan diklasifikasi sesuai dengan level dari dampak dan
kemungkinan terjadinya dan hal ini harus dikontrol untuk menurunkan resiko yang ada
(Mitigasi dan pencegahan resiko). Supervisor akan membuat JSA sesuai dengan
dokumen RA dan langkah langkah pekerjaan yang akan dilakukan, pekerja harus
mengetahui bahaya yang dapat ditimbulkan pada setiap langkah pekerjaan.
Risk Assessment dan JSa dapat dilihat pada lampiran.
ATTACHMENT A_PR-E-019E_Rev_6 35
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
The environmental risks that may occur in Tank & Overpass Area Piling Work are listed
below:
1. Excess waste
2. Dust
3. Oil Spillage (B3 Waste)
4. Emission/smoke control
5. Domestic Waste water from toilet and kitchen
1. Waste generated during the activity shall be brought to waste segregation area and be
segregated in accordance to the Project Waste Management Plan. For B3 waste
management will follow government regulations (PP No 22.2021), BAPPEDAL
requirements and other legal and relevant regulations.
2. Dust shall be controlled by spraying water.
3. Oil spillage from equipment shall be prevented by placing adequate spill tray
underneath.
4. Equipment must be inspected before mobilization to ensure the equipment machine is
in proper condition and machine emission are not excessive from regulation.
5. For Domestic waste, portable toilet will be made, portable toilet using biotank as
septictank so the waste water from the toilet can be directly discharged to the sewer.
For other domestic waste from food packaging etc. will be collected near shelter area,
will be disposed periodically at the final disposal location.
ATTACHMENT A_PR-E-019E_Rev_6 36
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
1. Limbah berlebih
2. Debu
3. Tumpahan Oli
4. Emisi Alat Berat
5. Limbah Domestik
ATTACHMENT A_PR-E-019E_Rev_6 37
INDONESIA GROWTH
CLASSIFICATION PROGRAM (IGP) – MINES OF
BAHODOPI BLOCK 2 & 3
Confidental VALE No. PÁGE
- A
ATTACHMENTS / LAMPIRAN
ATTACHMENT A_PR-E-019E_Rev_6 38