A heat stroke mock drill was conducted on May 13, 2019, at the TSSEZ Gopalpur Project to test emergency response and evacuation procedures. The drill involved a simulated incident where a worker was exposed to direct sunlight, leading to a timely response from first aid and security teams. Positive feedback highlighted good worker cooperation, while recommendations for improvement included providing ORS and glucose packets, ensuring cold drinking water availability, and enhancing site housekeeping practices.

Uploaded by

AKBAR ALI
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
1K views6 pages

Mock Drill - Heat Stroke

A heat stroke mock drill was conducted on May 13, 2019, at the TSSEZ Gopalpur Project to test emergency response and evacuation procedures. The drill involved a simulated incident where a worker was exposed to direct sunlight, leading to a timely response from first aid and security teams. Positive feedback highlighted good worker cooperation, while recommendations for improvement included providing ORS and glucose packets, ensuring cold drinking water availability, and enhancing site housekeeping practices.

Uploaded by

AKBAR ALI
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

Heat Stroke Mock Drill : TSSEZ Gopalpur Project

Date : 13.05.2019 Time of commencement : 10:48 Hrs.


Location: SEZ main gate complex All clear : 11:30hrs
Nature of Mock Drill: Heat Stroke

Brief scenario of Mock Drill: A Mock drill exercise was carried out on 13.05.2019 in General shift at 10:48 Hrs. The exercise was
carried out to ascertain the response time of emergency services and evacuation process. Mr. BIPIN PRADHAN, Gate pass No :
TSSEZL/00134/0419, Age 48, during working at ERECTION SITE at SEZ main gate complex got exposed to direct sun light , immediately
Mr. Ashok Das (Project Manager – M/s ippl) and Mr. Sambit (Safety officer ippl) informed to First-aid centre and subsequently to the Security
control room. Mr. Dipak Ghosh(GM Infra) Mr. Rajendra Gouda Mr. Kalinga Mohanty ( Sr Manager Electrical ) were present at site. All worker
were called and gathered at Assembly Point. As the I.P was shifted to first-aid centre by M/S IPPL company vehicle. Ambulance reached at spot
well in time and started emergency activity taken. At first aid centre Doctor checked the I.P .

Mr. Dipak Ghosh, given the all clear signal after brief discussion on mock drill purpose and return of I.P & safety person from first Aid Center.
No of participants: First Aid team, Mr. Dipak Ghosh.,Mr. Kalinga Mohanty, Mr. Rajendra Gouda Mr. Ashok Das, Mr. Sambit sh bhuyan
with 20 worker of M/s IPPL.

Sl.No. Drill Description Start time End time Total time taken Target
1 Alarm Raised 10:48 Hrs. 10:49 Hrs 01 Minutes
2 Arrival of Ambulance 10: 50 hrs 10:55hrs 05 Minutes 05 Minute
3 Arrival of security Team 10.53 Hrs 10.59 Hrs 06 Mintues 05 Minute

4 All clear 10:48Hrs. 11:30 hrs 40 Minutes


5 Debriefing 11:05 Hrs. 11:30 Hrs. 25 mins
Observers : Mr Dipak Ghosh(GM – Infra) & Kalinga Mohanty
Heat Stroke Mock Drill : TSSEZ Gopalpur Project

Positive Points :
1. Workers reaction to- words incident is good and co-operative
2. Response of site engineer and site in-charge was good & co-operative
3. 100% of site workers gathered at one place within 15 minutes of post alarm.

Areas for Improvements / Recommendations :

1. ORS & Glucose packets to keep at site with informed to all workers .
2. House keeping to be imparted to site.
3. 2S(Sorting & systemizing of materials) to be implemented at site.
4. Workers to be provided cold drinking water during summer time.
Heat Stroke Mock Drill : TSSEZ Gopalpur Project
Heat Stroke Mock Drill : TSSEZ Gopalpur Project
Heat Stroke Mock Drill : TSSEZ Gopalpur Project
1.Drinking water checked by Mr. Depak Ghosh .
2.Given training to the all workers.