Quality Control Checklist

The document contains various checklists for construction activities including excavation, anti-termite treatment, reinforcement, concreting, post-concreting, backfilling, masonry, plastering, granite/marble works, formwork, and painting. Each checklist outlines specific items to verify with options for 'Yes', 'No', or 'Not Applicable' responses. The checklists ensure compliance with safety and quality standards throughout the construction process.

Uploaded by

greatestemeka1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views11 pages

Quality Control Checklist

The document contains various checklists for construction activities including excavation, anti-termite treatment, reinforcement, concreting, post-concreting, backfilling, masonry, plastering, granite/marble works, formwork, and painting. Each checklist outlines specific items to verify with options for 'Yes', 'No', or 'Not Applicable' responses. The checklists ensure compliance with safety and quality standards throughout the construction process.

Uploaded by

greatestemeka1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 11

Checklist for Excavation

Project : Doc. No. : QA/CL-EXC/


Client : Project Location :

SITE LOCATION DATE

YES NO NA

1 Are there any underground utilities like sewers, water pipelines, cables?
(if YES then bring to the notice of the Project Manager & adequate precautions to be
taken while excavation)

2 Check whether the excavated pits are adequately shored/ timbered?

3 Are the excavated areas provided with fences/ barricades?

4 Are the excavated material kept from the edge of the pit/ trench by atleast
1m?

5 Are the heavy equipment such as cranes, shovels, backtoe loaders etc.
kept away atleast 6m from the edge of excavated pit?

6 Are danger signs provided near the excavated area?

7 Means of access and exit from the work area provided?

8 Check Set out

9 Check Excavation Size with Tolerance (offset)

10 Check for Loose materials / Loose soil

11 Check bottom of excavation (indicate proposed GL/Basement level with respect to


existing road level)

Further comments, if required:

Signature Date Remarks/ Comments


Checked By:
Approved By:
Checklist for Anti Termite Treatment

Project : Doc. No. : QA/CL-EXC/


Client : Project Location :

SITE LOCATION DATE

YES NO NA

1 Check Surface Preparation

2 Check Chemicals

Check Application as per Manufacturer's Instructions (MSDS) & Architects


3 Specs

4 Check Finished treatment of work

5 Check for Mix Proportion (As per Manufacturer's Instruction)Water/Kerosene

6 Check for Stages like Foundation/flooring / Joinery / External

Further comments, if required:

Signature Date Remarks/ Comments


Checked By:
Approved By:
Checklist for Reinforcement

Project : Doc. No. : QA/CL-REN/


Client : Project Location :

SITE LOCATION DATE

YES NO NA

A The grade and sizes of reinforcement bars (rebars) conforms with structural specifications

B Samples of the reinforcement were tested as directed by the structural Engineer

C The result of reinforcement tests conforms with structural specifications

D Rebar diameters, numbers and length conform with the structural specifications

E Rebars have been cleaned of materials that affect bond

F Positioning of rebars in basement are as shown on structural drawing

G Rebar spacing are in accordance with structural drawing

H Lap length and positioning are as shown on structural drawing

I Rebars are adequate tied and supported to avoid displacement

J Bends are within radii and tolerance are uniformly made

K Concrete spacer and cover are approved by the structural engineer

L Coating of rebars are adequate

M No conduit or pipe placed below rebar material except where approved

N No contact of rebar is made with dissimilar metals

O Rebar are not placed near surface that may cause rusting

P Adequate clearance provided for concrete placing

Q Verify that contractor has coordinated for anchors, piping, sleeves etc

R No bent bars and tension materials installed except where approved


Further comments, if required:

Signature Date Remarks/ Comments


Checked By:
Approved By:
Checklist for Concreting

Project : Doc. No. : QA/CL-CON/


Client : contractor :

SITE: LOCATION: DATE:

Structure: Max Aggre Size: Slump:

Cement Test Cert No: Steel Test Cert No:


YES NO NA
PRE CONCRETING
1 Check surface preparation

2 Check for Form work and stagging

3 Conduits/ Ducts opening/ Insert Plates provided?

4 Check for provision of vibrators?

5 Working condition of mixer/ vibrators checked and gaps between plates


in mixer drum to be checked?

6 Access platform and walkways (if required) provided?

7 Check reinforcement as per drawings

8 Check Embedded parts

9 Check cover to Reinforcement

10 Check Plumb

11 Check Reduced levels

12 Check for Concrete Grade

Further comments, if required:

Signature Date Remarks/ Comments


Checked By:
Approved By:
Checklist for Post Concreting

Project : Doc. No. : QA/CL-CON/


Client : contractor :

SITE: LOCATION: DATE:

Structure: Max Aggre Size: Slump:

Cement Test Cert No: Steel Test Cert No:


YES NO NA
PRE CONCRETING
1 Striking of formwork

2 Visibility of cracks

3 Honeycomb

4 Bulging

5 Accuracy of structural members dimension

6 Alignment, vertically, level of structural mermbers

7 Deviation of structural members

8 Steel bar exposed

Further comments, if required:

Signature Date Remarks/ Comments


Checked By:
Approved By:
Checklist for Backfilling Works

Project : Doc. No. : QA/CL-EXC/


Client : Project Location :

SITE LOCATION DATE

YES NO NA

Check the associated cocrete, waterproofing and protection works are completed
1
and approved

2 Verify the excavated area to be backfilling is clear from debris and formwork materials

Ensure the backfilling shall not commence earlier than 7days after concrete
3 placement or untill concrete has achieved 60% of design strength or more

Conform that all materials is approved and test results are complies with the
4 specifications

5 Check the thickness of layer shall not exceed 200mm

Check degree of compaction (FDT) for backing area (95% according to modified
6 proctor test)

7 Check the required test for each layer of 200mm compacted fill

8 Check required level and elevation

Enssure that the bedding material to be required depth compacted in trenches


9 for services installed and inspected

10 Ensure avoiding damage to waterproofing membrane

11 Ensure the backfilling is complete and the area is cleaned & tidy

Further comments, if required:

Signature Date Remarks/ Comments


Checked By:
Approved By:
Checklist for Masonry

Project : Doc. No. : QA/CL-MSN/


Client : Project Location:

SITE LOCATION DATE

YES NO NA

1 Availability of material as per daily requirement & Test reports

2 Cleaning work area off loose material/ concrete

3 Proper stacking of bricks/ blocks

4 Quality of Bricks/ sand, Tests performed and OK?

5 Wetting of bricks

6 Door frames, if any, erected in position?

7 Line out rechecked? (Room dimension, diagonals, alignment with one

8 Check Mortar Preparation & provision of platform

9 Check Mortar Thickness

10 Check Plumb

11 Check finished level / Rt. Angle/ Proportion of mix

12 Check hacking/ conduit/ silt content in sand

13 Check cleaning of dead mortar

14 Check curing / raking

15 Check provision of patti

16 Check for any addition & alterations

17 Check for proper pointing, packing & finsihing

Further comments, if required:

Signature Date Remarks/ Comments


Checked By:
Approved By:
Checklist for Plastering

Project : Doc. No. : QA/CL-MSN/


Client : Project Location :

SITE LOCATION DATE

YES NO NA
BEFORE PLASTERING

Check Drg./ Number/ Date & Revision for all other service like electrical,
1 plumbing etc.,

2 Safety access platform

3 Check for hacking/ Button marking / Mortar thickness

4 Provision of chicken mesh for conduits, column brick work joints & other

5 Preparation of Surface - Remove moss/ efflorescence & Dampen Surface

6 Material stacked - Cement, sand at various locations

7 Prewetting of surface

8 Quality of Sand - screening silt

9 Check the Beam, B/W joints packing with Nito Bond AR

10 check for Door Frame Projections


DURING PLASTERING
1 Platform for mortar mixing on tray

2 Check for thickness/ level & line & right angle

3 Proportion of mix

4 Addition of water proofing compound

5 Proper roughing of first coat

6 Check for collection of mortar spills

7 Cleaning of dead mortar

8 Check for waviness

9 Check for grooves/ drip moulds


Application of cement slurry on concrete surface/Space for tile area,
10 cutting for skirting area

11 Check for loft thickness and top surface in dead level W/Robe size

AFTER PLASTERING
1 Curing water distribution for various locations

2 Check for hollowness

3 Check for cracks

4 Check of plastering date for curing

Further comments, if required:

Signature Date Remarks/ Comments


Checked By:
Approved By:
Checklist for Granite/Marble works

Project : Doc. No. : QA/CL-CON/


Client : Project Location:

SITE LOCATION DATE

YES NO NA

BEFORE LAYING

1 Cleaning slab off loose mortar/ material, Button marking

2 Availability of Material - Sand, Tiles

3 Proper Stacking of Granite/Marble

4 Quality of Granite/Marble/ Sand

DURING LAYING

1 Drg. No./ Date as per which pattern given /Start point

2 Line/ Level fixed, checked & Slopes are as per requirement

3 Proportion of bedding mortar Mixing in A/2 tray

4 Check for grinding & polishing process

Clearing for joints/ workmanship / Any nosing particularly for washbasin


5 & Kitchen counter

AFTER LAYING

1 No material stacked after fixing?

2 Finished surface cleaned properly before polishing

3 Check for any hollow sound

4 Are there any Cracked, should be replaced

5 Curing for four days after Laying

Further comments, if required:

Signature Date Remarks/ Comments


Checked By:
Approved By:
Checklist for Formwork

Project : Doc. No. : QA/CL-MSN/


Client : Project Location:

SITE LOCATION DATE

YES NO NA

Formwork

1 Formwork has been approved by consultants

2 Formworks delivered to site were free from defects

3 Erected formworks were tight to avoid spillage

4 Dimension and depth of formworks were per as design

5 Formwork was free of debrics

6 Erected formworks were aligned, vertical and leveled before casting was done

Striking of formworks were in accordance with specification section of cast in


7 place concrete.

8 Shuttering to the sides of formworks where required were rigid

9 Sleeves and openings for all MEP services were provided as per structural
Further comments, if required:

Signature Date Remarks/ Comments


Checked By:
Approved By:
Checklist for Painting works

Project : Doc. No. : QA/CL-MSN/


Client : Project Location:

SITE LOCATION DATE

YES NO NA

Painting for Walls

1 Check for any wall cracks, Curing period completed or not

1 Check the material/paints as approved make

2 Check color shade approved

3 Cleaning of walls to be checked (Scrapping), Surface finishing

4 Cracks, Dampness, any leakages to be identified and repaired.

5 Apply primary coat

6 Application of coat as per specs to be checked

7 Check others materials covered neatly with masking tape (protection of


other materials from damage like Electrical switches plate, door/window
joints, glass partitions, wardrobes)

8 Check for no of coat applied & final touch up work are completed

9 Check for overall coverage andy brush marks

10 Check for cleaning in flooring, window/door glasses & joinery


fitting after painting

11 Check for any incomplete and addition and alteration

12 Check for floor polishing before final coat ( in case of Marble flooring)
Further comments, if required:

Signature Date Remarks/ Comments


Checked By:
Approved By: