0% found this document useful (0 votes)
59 views5 pages

Test L4 1

The document is a written assessment for the Electrical Installation Level 4 course, focusing on the testing of electrical installations. It consists of two sections, with multiple-choice questions in Section A and open-ended questions in Section B, covering topics such as test planning, safety culture, and compliance with IEEE standards. Candidates are instructed to answer all questions within a 2-hour timeframe and ensure all pages are present.

Uploaded by

bikosteve1998
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views5 pages

Test L4 1

The document is a written assessment for the Electrical Installation Level 4 course, focusing on the testing of electrical installations. It consists of two sections, with multiple-choice questions in Section A and open-ended questions in Section B, covering topics such as test planning, safety culture, and compliance with IEEE standards. Candidates are instructed to answer all questions within a 2-hour timeframe and ensure all pages are present.

Uploaded by

bikosteve1998
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

©2024 TVET CDACC

071305T4EIN
ELECTRICAL INSTALLATION LEVEL 4
ENG/OS/EI/CR/02/4A
Perform Testing of Electrical Installation
July/August 2024
Time: 2 Hours

TVET CURRICULUM DEVELOPMENT, ASSESSMENT AND


CERTIFICATION COUNCIL (TVET CDACC)

WRITTEN ASSESSMENT

2 HOURS

INSTRUCTIONS TO CANDIDATE
1. This paper consists of TWO sections: A and B.
2. Answer ALL questions in sections A and B in the answer booklet provided.
3. Marks for each question are indicated in brackets.
4. Do not write on this question paper.
5. Answer the questions in English.

This paper consists of FIVE (5) printed pages.


Candidate should check the question paper to ascertain that all the pages are
printed as indicated and that no questions are missing.

1 of 5
©2024 TVET CDACC

SECTION A (10 Marks)


Answer ALL questions in this section. Each correct answer is 1 mark
1. A loose connection of a wire at a fitting point results in ____________
A. Very high electrical resistance at the connection.
B. Low potential difference between the wire and the termination point.
C. Very high capacitance at the connection.
D. Low resistance to the flow of charges.
2. involves identifying the test to be carried out and the necessary test
equipment.
A. Test planning
B. Test execution
C. Test design
D. Test analysis
3. ____________ is the entity that typically establishes the standards for testing
procedures.
A. Individual companies
B. Regulatory authorities
C. Testing tool vendors
D. Academic institutions
4. involves issuing certificates to confirm the completion of testing or
compliance with standards.
A. Test planning
B. Test execution
C. Test reporting
D. Test analysis
5. In a regulated industry, role played by IEEE standards in testing is_____
A. They provide guidelines for efficient test execution.
B. They ensure that testing aligns with legal requirements and industry best
practices.
C. They dictate specific testing methodologies.
D. They focus solely on documentation requirements.

2 of 5
©2024 TVET CDACC

6. The primary focus in applying procedures of testing according to standards is___


A. Test execution efficiency
B. Adherence to industry regulations
C. Test case complexity
D. Test environment setup
7. It is important to identify the types of tests to be carried out early in the testing
process in order _______
A. To minimize project risks
B. To streamline the testing effort
C. To maximize test coverage
D. To expedite defect resolution
8. is a step in the testing process that involves categorizing tests based on their objectives
and requirements.
A. Test planning
B. Test execution
C. Test design
D. Test analysis
9. is responsible for ensuring that IEEE regulations are observed during
testing
A. Project managers
B. Testers
C. Quality assurance team player
D. Regulatory authorities
10. The following factors are not considered when identifying test equipment except____
A. Project schedule
B. Budget constraints
C. Test objectives and requirements
D. Team preferences

3 of 5
©2024 TVET CDACC

SECTION B (40 MARKS)


Answer ALL questions in this section
11. Interpreting test results effectively depends on the specific type of test you're dealing
with. Highlight three actions that should be taken when interpreting test results that
consistently show failures (3marks)
12. By prioritizing safety and working together, organizations can create a safer and more
productive work environment for everyone. Explain four ways on promoting a culture
of safety within a testing team. (4 marks)
13. Testing procedures are a structured set of instructions that define exactly how a test
should be conducted. Outline four ways of ensuring that testing procedures are
effectively implemented and maintained in accordance with standards. (4marks)
14. Before undertaking an installation project, tests need to be done to determine the
suitability of the installation. State five common types of tests that may be identified
during the planning phase. (5marks)
15. There are certain factors that should be considered before procuring test equipment
that meet specific needs and deliver accurate results for a project. Outline four
considerations that should be taken into account when procuring or acquiring test
equipment. (4marks)
16. IEEE publishes numerous standards that provide recommended practices and
guidelines for various aspects of electrical and electronic testing. Give four
consequences of non-compliance with IEEE standards during testing. (4 mark)
17. Inaccurate or misleading certificates during testing can be a serious issue that
undermines the integrity and reliability of the testing process. State four consequences
of issuing inaccurate or misleading certificates during testing. (4marks)
18. A testing certificate is a formal document issued by a qualified electrician that confirms a
system has undergone specific tests and met the specified requirements of a relevant standard
Highlight any four information that should be included in a testing certificate.
(5marks)
19. After carrying out a visual inspection you notice that some equipment and appliance
requires re-connection. Outline three methods of connection that you are likely to use.
(3marks)

4 of 5
©2024 TVET CDACC

20. Issuing certificates during testing is a crucial step that signifies the completion of a
testing process and verifies that a product, system, or material meets the specified
requirements. Explain two purpose of issuing certificates during testing.
(4marks)