Relato Ref Systems

The document outlines the proposed design for an ice cream cold storage facility at Camarines Sur Polytechnic Colleges, intended to accommodate 372,000 cases per year. It includes detailed layouts of various areas such as production, storage, and machine areas, along with specifications for air conditioning and ventilation systems. The project is overseen by Marvin L. Relato Jr. and checked by Engr. Saul J. Ebonite.

Uploaded by

marelato
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views5 pages

Relato Ref Systems

The document outlines the proposed design for an ice cream cold storage facility at Camarines Sur Polytechnic Colleges, intended to accommodate 372,000 cases per year. It includes detailed layouts of various areas such as production, storage, and machine areas, along with specifications for air conditioning and ventilation systems. The project is overseen by Marvin L. Relato Jr. and checked by Engr. Saul J. Ebonite.

Uploaded by

marelato
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

1 2 3 4 5 6 7 8 9 10

A A

P
MAIN

CHILLER
OFFICE

PRODUCTION AREA

A
CHILLER
MACHINE
AREA

B B

R
ENGINEERING
CONTROL

C
ROOM
C
ROOM

K
D D

I
LABORATORY

HALLWAY AREA HALLWAY AREA


ROOM

N
E E

G
ENTRANCE
DOCKING AREA
DOCKING AREA

MAIN
STORAGE AREA

F F

M2 M2 ROOF AND COOLING TOWER SYSTEM


GROUND FLOOR
SCALE: NTS
1 1
SCALE: NTS 1 1

LOGO SCHOOL/DEPARTMENT PROJECT TITLE: PROJECT LOCATION: NAME: CHECKED: SHT.


CAMARINES SUR
M2
.\a9f81452-df3c-4abb-b41c-e4df969e77ca.jpg
CSPC POLYTECHNIC
COLLEGES
PROPOSED ICE CREAM COLD STORAGE
FOR 372,000 CASES PER YEAR
Zone 6, Topas Proper
Nabua, Camarines Sur
MARVIN L. RELATO JR.
BSME 3D
ENGR. SAUL J. EBONITE, PME
INSTRUCTOR
MECHANICAL ENGINEERING M5
PRO
VIN
CIA
L ROA
D
SITE
LOCATION

PR
OV
IN
CI
AL
RO
AD

SOLAR
DRYER
PR
O
VI
N
W E C
IA
L
R
O
A
D

M3
SITE LOCATION LAYOUT
1 1 SCALE NTS TOPAS
S IMPACT SCHOOL

LOGO SCHOOL/DEPARTMENT PROJECT TITLE: PROJECT LOCATION: NAME: CHECKED: SHT.


CAMARINES SUR
M3
CSPC POLYTECHNIC
COLLEGES
PROPOSED ICE CREAM COLD STORAGE
FOR 372,000 CASES PER YEAR
Zone 6, Topas Proper
Nabua, Camarines Sur
MARVIN L. RELATO JR.
BSME 3D
ENGR. SAUL J. EBONITE, PME
INSTRUCTOR
MECHANICAL ENGINEERING M5
MACHINE
AREA
MAIN ENGINEERING

PRODUCTION AREA
OFFICE ROOM

CONTROL
ROOM
LABORATORY
HALLWAY AREA HALLWAY AREA

ROOM

ENTRANCE
DOCKING AREA
DOCKING AREA

MAIN
STORAGE
AREA

M4 SPRINKLER SYSTEM LAYOUT


1 1 SCALE NTS

LOGO SCHOOL/DEPARTMENT PROJECT TITLE: PROJECT LOCATION: NAME: CHECKED: SHT.


CAMARINES SUR
M4
.\a9f81452-df3c-4abb-b41c-e4df969e77ca.jpg
CSPC POLYTECHNIC
COLLEGES
PROPOSED ICE CREAM COLD STORAGE
FOR 372,000 CASES PER YEAR
Zone 6, Topas Proper
Nabua, Camarines Sur
MARVIN L. RELATO JR.
BSME 3D
ENGR. SAUL J. EBONITE, PME
INSTRUCTOR
MECHANICAL ENGINEERING M5
AIR - CONDITIONING UNIT EQUIPMENT SCHEDULE
UNIT TYPE/ COOLING PHASE/Hz
AREA SERVED LOCATION HP/TOR UNIT/MODEL VOLTS ROOM
SCHEDULE MODEL CAPACITY 1.0 ALL THE MECHANICAL WORKS INSTALLATION DONE BY THE THE MECHANICAL
CONTRACTOR SHALL COORDINATE WITH OTHER TRADE CONTRACTOR FOR THE
FOLLOWING IMPLEMENTATION OF WORK:
ACU -1 16 SQUARE METERS GROUND FLOOR SPLIT TYPE ACU 17,640 kJ/Hr 2 HP CARRIER 220 - 230 V 1 / 60 PRODUCTION AREA A. ACTUAL KW OR AMPERE RATINGS OF ALL AIRCONDITIOING AND VENTILATION
EQUIPMENT FOR PROPER PROVISION OF ELECTRICAL POWER WIRING, CIRUIT
BREAKER, ETC.
ACU -2 16 SQUARE METERS GROUND FLOOR SPLIT TYPE ACU 17,640 kJ/Hr 2 HP CARRIER 220 - 230 V 1 / 60 PACKAGING AREA B. DUCT PENETRATION THRU WALLS OR FLOOR SLABS

P
C. PIPE PENETRATION THRU WALLS OR FLOOR SLAB.
D. CONDENSATE PIPING OF FAN COIL UNITS FOR PROPER DISPOSAL.
MAIN

CHILLER
E. CONCRETE PAD REQUIREMENTS FOR VARIOUS AIR-CONDITIONING AND
OFFICE VENTILATION EQUIPMENT.
F. ACTUAL LOCATIONS OF AIR-CONDITIONING AND VENTILATION EQUIPMENT.

PRODUCTION AREA

A
2.0 THE MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL ALL
AIR-CONDITIONING AND VENTILATION DUCTWORK AS INDICATED ON THE PLANS AND
DRAWINGS INCLUDING ALL NECESSARY REQUIREMENT CONNECTIONS.

CHILLER
3.0 THE MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL THE COMPLETE
MACHINE
REFRIGERANT PIPING INCLUDING INSULATION, HANGERS, SUPPORTS AND
AREA
NECESSARY EQUIPMENT CONNECTIONS.

R
100 mm or MORE INSULATION PIPE 4.0 THE MECHANICAL CONTRACTOR SHALL COORDINATE WITH THE SUPPLIER OF
MULTI-SPLIT TYPE AIR-CONDITIONING UNIT FOR PROPER SIZING OF REFRIGERANT
ESCUTCHEON PLATE GALVANIZED STEEL PIPE SLEEVE
ENGINEERING WITH 1/2" MINIMUM ANNULAR SUCTION AND LIQUID AS WELL AS BRANCH SIZE JOINTS FROM ONE FAN COIL UNIT

CONTROL
STAINLESS STEEL
SPACE WITH INSULATION (FCU) TO ANOTHER.
ROOM REMOVE THE COVER PLATE SCREW TO

ROOM
HAVE ACCESS TO THE TERMINAL BOARD

K
PIPE 5.0 ALL DIMENSIONS ARE EXPRESSED IN MILLIMETRS UNLESS OTHERWISE
INDICATED.
600 mm or MORE
600 mm or MORE 6.0 LOCATION OF CONTROL THERMOSTAT, LOCAL CONTROL PANEL (BUILDING)
AND OTHER SENSORS SHALL BE A CONTRACTOR RESPONSIBILITY TO ENSURE AN
20mm CONDENSATE PIPE THRU WALL VAPOR BARRIER SEALING EFFICIENT OPERATIONS OF THE SYSTEM.
PIPE INSULATION COMPOUND 1/2" THICK BOTH ENDS

I
(WHERE REQUIRED)
7.0 ALL NECESSARY GOVERNMENT PERMITS SHALL BE SECURED AND PAID AT
OAKUM PACKING FOR BARE PIPE
AUTO LOUVER (VERTICAL) WALL AND INSULATION FOR INSULATED
THE EXPENSE OF THE MECHANICAL CONTRACTOR.
LABORATORY

MANUAL LOUVER (HORIZONTAL) 2300 FRONT FFL PIPE


HALLWAY AREA HALLWAY AREA 8.0 THE PROSPECTIVE CONTRACTOR SHALL VISIT AND SURVEY THE PLACE OF
INSTALLATION SO THAT HIS WORK WILL NOT BE AFFECTED DURING THE
ROOM

INSTALLATION OF THE ALL THE EQUIPMENT.


POWER TO INDOOR UNIT

N
9.0 MANUFACTURER AND MODEL NUMBER SPECIFIED IS NOT MANDATORY
EQUIPMENT FOR INSTALLATION, IT IS ONLY THE BASIS OF SPECIFICATION FOR THE
SELECTION OF THE EQUIPMENT.

10.0 OUTDOOR UNITS OR CONDENSING UNITS SHALL BE INSTALLED OUTSIDE THE


PIPE THRU WALL DETAIL

G
200 mm or MORE WALLS AND OR AS DIRECTED BY THE PROJECT ENGINEER OR IN-CHARGE.

SCALE NTS 11.0 ALL MECHANICAL WORKS INCLUDED HEREIN SHALL BE INSTALLED IN
ACCORDANCE WITH THE LATEST REQUIREMENTS OF THE PHILIPPINE NATIONAL
BUILDING CODE AND THE LOCAL AUTHORITY.
200 mm or MORE

ENTRANCE
DOCKING AREA
DOCKING AREA
12.0 THE MECHANICAL CONTRACTOR SHALL SUBMIT THREE (3) SETS OF AS-BUILT
PLAN DULY SIGNED AND SEALED BY A REGISTERED PROFESSIONAL MECHANICAL
CONNECTING CABLE

MAIN
ENGINEER PRIOR TO THE COMPLETION OF THE ENTIRE PROJECT.

STORAGE AREA ADDITIONAL DRAIN HOSE POLYETHYLENE TAPE TRANSMISSION WIRE


(SEE NOTE) (COLOR BLUE) IN EMT CONDUIT

LIQUID SIDE PIPING


GAS SIDE PIPING 600 mm or MORE RUBBER INSULATION

COPPER TUBE RUBBER INSULATION


34.9 mm (1 38") Ø ID
34.9 mm (1 38") Ø x 3/4" WALL
REFRIGERANT PIPE REFRIGERANT PIPE (1 81") Ø ID
SPLASH BLOCK GAS LINE LIQUID LINE 28.6 mm (1 81") Ø 28.6 mm
x 3/4" WALL
19.1 mm (34") Ø 19.1 mm (34") Ø ID
x 3/4" WALL
15.9 mm (58") Ø 15.9 mm (58") Ø ID
x 1/2" WALL
12.7 mm (21") Ø ID
12.7 mm (21") Ø x 1/2" WALL

SPLIT-TYPE INSTALLATION DETAIL 9.5 mm

6.4 mm
(38") Ø

(41") Ø
9.5 mm (38") Ø ID
x 3/8" WALL
6.4 mm (41") Ø ID

SCALE NTS
x 3/8" WALL

REFRIGERANT PIPE DETAIL


SCALE NTS

AIR- CONDITIONING LAYOUT (GROUND FLOOR)


SCALE NTS

MAIN CIRCUIT BREAKER AMPERE


RATING AS IND.
NOTES:
CHB WALL
AIR COOLED CONDENSING UNIT *CONDENSATE WILL BE TO AN
APPROVED PLACE.
*CONDENSATE FROM ALL COOLING
COILS AND EVAPORATORS SHALL BE
CONVEYED TO FROM DRAIN PAN
PROVIDE RUBBER PAD OUTLET TO AN APPROVED PLACE OF
DISPOSAL
33 x 32 x 3 mm THICK ANGULAR BAR
CONCRETE WALL ACCU STEEL PLATFORM
WEATHERPROOF
SEALANT ALL AROUND
PVC OR G.I
PIPE SLEEVES ANGLE BAR 50 mm x 50 mm x 6.35 mm
DYNABOLT 1/4" Ø DESIGNED AND WELDED FOR ACCU
PROTECTION DEVICE CIRCUIT MOUNTING BY MECHANICAL
BREAKER 30A BOLT - ON TYPE CONTRACTOR
GA #24 G.I
FLASHING COVER REF. PIPES W/ RUBBER 220V ,60Hz, 1Ø
INDULSTION, SLOPING DOWN
TO OUTSIDE WALL SEE PIPE CHASE DETAIL
ANGLE BAR 1/8 in x 1-1/2 in
SUPPORT

CEMENT FILL
CONCRETE EDGE

FASTENING SCREW TYPICAL RISER CONNECTION DETAIL


ANGLE BAR 50 mm x 50 mm x 6.35 mm
DESIGNED AND WELDED FOR ACCU
MOUNTING BY MECHANICAL
ACU MOUNTING DETAIL SCALE NTS@A3
CONTRACTOR SCALE NTS

REFRIGERANT PIPES THRU


OUTSIDE WALL DETAIL
SCALE NTS

THREAD ROD

RUBBER PAD ISOLATOR

CEILING

TYPICAL DETAIL OF FCU CEILING CASSETTE PIPE PENETRATION THROUGH ROOF SLAB VERTICAL RISERS SUPPORT DETAIL TYPICAL FCU CONDENSATE DRAIN CONNECTION DETAIL
SCALE NTS@A3 SCALE NTS@A3 SCALE NTS@A3 SCALE NTS@A3

LOGO SCHOOL/DEPARTMENT PROJECT TITLE: PROJECT LOCATION: NAME: CHECKED: SHT.


CAMARINES SUR
M5
..\..\..\Documents\LOGOS\Camarines_Sur_Polytechnic_Colleges_Logo-289x300.png
CSPC POLYTECHNIC
COLLEGES
PROPOSED ICE CREAM COLD STORAGE
FOR 372,000 CASES PER YEAR
Zone 6, Topas Proper
Nabua, Camarines Sur
MARVIN L. RELATO JR.
BSME 3D
ENGR. SAUL J. EBONITE, PME
INSTRUCTOR
MECHANICAL ENGINEERING M5
GENERAL NOTES:
1.ALL EQUIPMENT SHALL BE MOUNTED ON OR SUPPORTED WITH
VIBRATION ISOLATION UNITS OR ASSEMBLIES.
2. INSTALLATION OF ALL WORKS SHALL BE DONE IN NEAT AND
WORKMANLIKE MANNER IMPROPERLY SET WORK AS DETERMINED BY
DESIGN OF ICE CREAM THE ARCHITECT/ENGINEER SHALL BE REMOVED AND REPLACED AT
NO EXTRA COST.
PLANT 3. ALL MATERIALS TO BE USED SHALL BE NEW AND CLEAN. 4.
DEVIATIONS AND REVISION FROM PLANS SHALL BE REFERRED TO
REFRIGERATION SYSTEM THE ARCHITECT FOR REVIEW AND APPROVAL.
372,000 Cases per YEAR 5. ALL NECESSARY GOVERNMENT PERMITS SHALL BE SECURED
BY THE CONTRACTOR COST OF SECURING PERMITS SHALL BE
MECHANICAL DRAWING INDEX INCLUDED IN THE BID.
6. ALL MECHANICAL WORKS SHALL BE ACCOMPLISHED IN
SHEET NO. SHEET CONTENT ACCORDANCE
WITH THE LATEST MECHANICAL ENGINEERS CODE AND ASHRAE
M1 GENERAL NOTES AND SCHEDULE OF EQUIPMENTS STANDARDS.
7. MECHANICAL CONTRACTOR SHALL ALWAYS OBSERVE SAFETY
M2 FLOOR PLAN AND ORDERLINESS.
8. THE CONTRACTOR SHALL PROVIDE NECESSARY REFRIGERANT
M3 SITE LOCATION
LINE. VALVES AND ACCESORIES (SOLENOID VALVE, SIGHT GLASS,
M4 SPRINKLER SYSTEM LAYOUT FILTER/DRYER) AND CONTROLS WITH WIRINGS NECESSARY FOR
BENEFICIAL USE OF THE AIR CONDITIONING SYSTEM.
M5 MECHANICAL LAYOUT HVAC AND VENTILATION 9. ALL A/C AND VENTILATING EQUIPMENT CONTROL PANEL
SWITCH SHALL BE LOCATED AT THE MANAGER'S OFFICE.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL
BALANCING. TESTING & COMMISSIONING OF THE WHOLE AIR
CONDITIONING AND VENTILATION SYSTEM AND SUBMIT WRITTEN
DATA PRIOR TO TURN-OVER.

LOGO SCHOOL/DEPARTMENT PROJECT TITLE: PROJECT LOCATION: NAME: CHECKED: SHT.


CAMARINES SUR
M1
.\a9f81452-df3c-4abb-b41c-e4df969e77ca.jpg
CSPC POLYTECHNIC
COLLEGES
PROPOSED ICE CREAM COLD STORAGE
FOR 372,000 CASES PER YEAR
Zone 6, Topas Proper
Nabua, Camarines Sur
MARVIN L. RELATO JR.
BSME 3D
ENGR. SAUL J. EBONITE, PME
INSTRUCTOR
MECHANICAL ENGINEERING M5