31.
60
39.50
PERSPECTIVE
SCALE NTS
SITE DEVELOPMENT PLAN
SCALE 1:100
PREPARED BY: PRC No.: Validity PROJECT TITLE/LOCATION: SUBMITTED TO: SHEET CONTENT: SHEET NO.:
IAPOA No.: O.R. No.: Date:
MARK NATHANIEL R. MISOLAS PROPOSED 3-STOREY WILROSS ANGELICO PERSPECTIVE AND
SITE DEVELOPMENT PLAN
PTR No.: Date: RESIDENTIAL BUILDING PAPAYA
LUPI SAN FERNANDO
STUDENT Place.: TIN: ENGINEER / INSTRUCTOR Date activated.: CADD BY:
1 2 2
13.00
1 2 2
6.50 6.10
13.00
6.50 6.10
C
W
1
3.80
C
W BEDROOM BEDROOM
KITCHEN 1
3.80
D D
POWDER 3 3
C
ROOM
D
D W 4
3.80
1
4
C
BATHROOM
BATHROOM GAME AREA
3.80
C
DINNING ROOM DOWN
20.50
W W
5 5
C
W
D FAMILY ROOM
6.00
DOWN 4 UP
1
W
20.00
D W
2 4
6.00
UP
D
3
B
W
6
B
6.00
ENTERTAINMENT
ROOM
LIVING ROOM
6.00
A
W
D 2
4
A
7.00
GROUND FLOOR PLAN
SCALE 1:100
SECOND FLOOR PLAN
SCALE 1:100
PREPARED BY: PRC No.: Validity PROJECT TITLE/LOCATION: SUBMITTED TO: SHEET CONTENT: SHEET NO.:
IAPOA No.: O.R. No.: Date: GROUND FLOOR PLAN
MARK NATHANIEL R. MISOLAS PROPOSED 3-STOREY WILROSS ANGELICO AND
PTR No.: Date: RESIDENTIAL BUILDING PAPAYA SECOND FLOOR PLAN
LUPI SAN FERNANDO
STUDENT Place.: TIN: ENGINEER / INSTRUCTOR Date activated.: CADD BY:
1 2 2
13.00
6.50 6.10
13.00
C
3.80
W
1
RECREATION
HOME GYM AREA
C
AREA
3.80
W
1
W
4
W
4
W
4
W
4
W
4
ROOFTOP
C
LOUNGE
14.00
DOWN
20.70
6.00
D
3
W W W
3 3 3
B
ROOF DECK
7.20
7.20
ROOF SLAB PLAN
SCALE 1:100
THIRD FLOOR PLAN
SCALE 1:100
PREPARED BY: PRC No.: Validity PROJECT TITLE/LOCATION: SUBMITTED TO: SHEET CONTENT: SHEET NO.:
IAPOA No.: O.R. No.: Date: THIRD FLOOR PLAN
MARK NATHANIEL R. MISOLAS PROPOSED 3-STOREY WILROSS ANGELICO AND
PTR No.: Date: RESIDENTIAL BUILDING PAPAYA ROOF SLAB PLAN
LUPI SAN FERNANDO
STUDENT Place.: TIN: ENGINEER / INSTRUCTOR Date activated.: CADD BY:
1 2 2 C C C B A
13.00 20.70
6.50 6.10 3.80 3.80 6.00 6.00
0.50
ROOF APEX
THIRD FLOOR CEILING LINE
2.50
0.50
THIRD FLOOR FINISH LINE
SECOND FLOOR CEILING LINE
9.00
2.50
0.50
SECOND FLOOR FINISH LINE
GROUND FLOOR CEILING LINE
2.50
GROUND FLOOR FINISH LINE
FRONT ELEVATION LEFT SIDE ELEVATION
SCALE 1:100 SCALE 1:100
2 2 1 A B C C C
13.00 20.70
6.10 6.50 6.00 6.00 3.80 3.80
0.50
ROOF APEX
THIRD FLOOR CEILING LINE
2.50
0.50
THIRD FLOOR FINISH LINE
SECOND FLOOR CEILING LINE
9.00
2.50
FIREWALL
0.50
SECOND FLOOR FINISH LINE
GROUND FLOOR CEILING LINE
2.50
GROUND FLOOR FINISH LINE
REAR ELEVATION RIGHT SIDE ELEVATION
SCALE 1:100 SCALE 1:100
PREPARED BY: PRC No.: Validity PROJECT TITLE/LOCATION: SUBMITTED TO: SHEET CONTENT: SHEET NO.:
IAPOA No.: O.R. No.: Date:
PROPOSED 3-STOREY
MARK NATHANIEL R. MISOLAS
PTR No.: Date: RESIDENTIAL BUILDING
WILROSS ANGELICO
PAPAYA ELEVATION
LUPI SAN FERNANDO
STUDENT Place.: TIN: ENGINEER / INSTRUCTOR Date activated.: CADD BY:
1 2 2
13.00
1 2 2
6.50 6.10 13.00
6.50 6.10
C
3.80
3.80
C
3.80
3.80
14.00
C
20.00
C
6.00
6.00
B
B
6.00
THIRD FLOOR
COLUMN AND BEAM LAYOUT
A
SCALE 1:100
FIRST AND SECOND FLOOR
COLUMN AND BEAM LAYOUT
SCALE 1:100
PREPARED BY: PRC No.: Validity PROJECT TITLE/LOCATION: SUBMITTED TO: SHEET CONTENT: SHEET NO.:
IAPOA No.: O.R. No.: Date:
MARK NATHANIEL R. MISOLAS
PROPOSED 3-STOREY WILROSS ANGELICO COLUMN AND BEAM LAYOUT
PTR No.: Date: RESIDENTIAL BUILDING PAPAYA
LUPI SAN FERNANDO
STUDENT Place.: TIN: ENGINEER / INSTRUCTOR Date activated.: CADD BY:
6.10 6.50 6.10
h/2
LEVEL 3
3.00
6.10
h
LEVEL 2
3.00
h
LEVEL 1
3.00
h/2
LEVEL 0
FRAME C FRAME B FRAME A
SCALE 1:100 SCALE 1:100 SCALE 1:100
3.80 3.80 3.80 3.80 6.00 6.00
h/2
LEVEL 3
3.00
h
LEVEL 2
3.00
h
LEVEL 1
3.00
h/2
LEVEL 0
FRAME 1 FRAME 2
SCALE 1:100 SCALE 1:100
PREPARED BY: PRC No.: Validity PROJECT TITLE/LOCATION: SUBMITTED TO: SHEET CONTENT: SHEET NO.:
IAPOA No.: O.R. No.: Date:
PROPOSED 3-STOREY WILROSS ANGELICO
MARK NATHANIEL R. MISOLAS
PTR No.: Date: RESIDENTIAL BUILDING PAPAYA
FRAMING PLAN
LUPI SAN FERNANDO
STUDENT Place.: TIN: ENGINEER / INSTRUCTOR Date activated.: CADD BY: