CENGR 3210: QUANTITY SURVEYING
Laboratory Exercise No. 1
2nd Semester AY 2024-2025
LABORATORY EXERCISE TITLE: COMPUTATION OF QUANTITY OF MATERIALS IN SITE WORKS, MASONRY AND CONCRETE WORKS
ESTIMATED QUANTITIES
Item
PARTICULARS CALCULATIONS
No. CHB CHB CHB Cement Excavation
Sand (m3) Gravel (m3) Backfill (m3) Earthfill (m3)
(150mm) (125mm) (100mm) (bags) (m3)
pieces pieces pieces
I . Site Works
1 . Excavation
Backfill (Attached detailed
2.
estimate of
3. Earth Fill
computation.)
4. Gravel Fill
II . Masonry Works
5 . Ground Floor CHB Walls
6 . Second Floor CHB Walls
(Attached detailed
Plastering (CHB Walls, estimate of
7 . Columns, & Beams) computation.)
8 Septic Tank & Catch Basin
.
III . Concrete Works
9. Column Footing
10 . Wall Footing
11 . Ground Floor Column
12 . Floor Tie Beam Attached detailed
13 . Ground Floor Slab estimate of
computation.)
14 . Second Floor Column
15 . Floor Beam
16 . Floor Slab
17 . Roof Beam/RD Beam
18 . RD Slab
19 . Septic Tank
20 . Others
TOTAL
Note:
- Summary should be computerize & printed in long coupon bond (Landscape) with margins (1" around) and with computerize cover page (Portrait) sign by every member of the group
above printed name. Specify also the Set No., Course, Year & Section & Date of Submission at the cover page.
- Hand written detailed estimate in long coupon bond (Portrait) with margins (1" around).
- Submission of hard copy will be on March 28, 2025 until 5:00 pm at Room 405 (CE Department).
- Attach printout of the detiled plan & details in A3 size.
- Sequence of LE#1: Cover Page, Summary, Hand Written Detailed Estimate, Additional Details & Printout of plans & details.
Submitted by:
1. (Group Leader)
2.
3.
4.
5.
6.
7.
8.
9.
10 .
11 .
Submitted to:
ENGR. RITCHIE C. MALASAN
Faculty, Civil Engineering Department
Date: 03/18/2025