BOQ

The document outlines specifications and bill of quantities for multiple canal construction projects and a slab culvert construction, detailing excavation, concrete work, masonry work, and finishing work. Each project includes descriptions of materials, quantities, and unit rates for various construction tasks. The projects are located from Mezegaja to River and involve different consultants and clients, with a focus on ensuring proper construction standards and material specifications.

Uploaded by

endris
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views22 pages

BOQ

The document outlines specifications and bill of quantities for multiple canal construction projects and a slab culvert construction, detailing excavation, concrete work, masonry work, and finishing work. Each project includes descriptions of materials, quantities, and unit rates for various construction tasks. The projects are located from Mezegaja to River and involve different consultants and clients, with a focus on ensuring proper construction standards and material specifications.

Uploaded by

endris
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 22

Project :- 474m Canal construction work 2017EC/2024GC

LOCATION :- From Mezegaja to River


Consultant:-Segno Gebeya small city
Client:-Segno Gebeya small city
Title:-Specification + bill off quantity
Item
no Description unit quantity Unit rate Amount

A. Sub-structure
1. Excavation and earth work lengeth
1.1 Trench Excavation in ordinary soil to an average depth of 1m. M 3
995.40 - 425

Back fill with selected granular material around the back of the masonary
1.2 M3 94.80 -
wall both side and compacte it attains the required proctor density.

cart-away all surplus excavated materials & deposite to a distance not


1.3 M3 -
exceeding 10km from the site 995.40
25cm thick basaltic or equivalent stone hardcore well rolled consolidated &
1.4 M2 237 -
filled with crushed stone.
Total Carried in ETB -
2. concrete work -
5cm thick lean concrete quality c-5 150kg of cement/m3 at the bottom part
2.1 M2 258 -
of the masonry wall.
2.2 10cm thick mass concrete class c-20 250kg cement /m3 on hard core M2 237.00 -
Total Carried in ETB -
3. Masonry Work -
50 cm thick at the top and 70 cm thick at the bottom stone thick basalt or
3.1 equivalent stone bedded on cement sand mortar 1:3 ratio below natural M3 616.20 -
ground level.
Total Carried in ETB -
4. Finishing work -
4.1 pointing to stone masounery wall cement mortar (1:3) mix. M2 758.80 -
4.2 5cm thick coping cement to sand ratio 1:3 M2 192.50 -
Total Carried in ETB -
Total carried summary in ETB -
Vat (15%) -
Grand total -
width depth
Project :- 425m Canal construction work 2017EC/2024GC
LOCATION :- From Mezegaja to River
Consultant:-Kabe small city
Client:-Kabe small city
Title:-Specification + bill off quantity
Item
no Description unit quantity

A. Sub-structure
1. Excavation and earth work
1.1 Trench Excavation in ordinary soil to an average depth of 1m. M3 1,029.60
Back fill with selected granular material around the back of the masonary
1.2 M3 234.00
wall both side and compacte it attains the required proctor density.
cart-away all surplus excavated materials & deposite to a distance not
1.3 M3
exceeding 10km from the site 1,029.60
25cm thick basaltic or equivalent stone hardcore well rolled consolidated &
1.4 M2 234
filled with crushed stone.
Total Carried in ETB
2. concrete work
5cm thick lean concrete quality c-5 150kg of cement/m3 at the bottom part
2.1 M2 819.6
of the masonry wall.
2.2 10cm thick mass concrete class c-20 250kg cement /m3 on hard core M2 234.00
Total Carried in ETB
3. Masonry Work
50 cm thick at the top and 70 cm thick at the bottom stone thick basalt or
3.1 equivalent stone bedded on cement sand mortar 1:3 ratio below natural M3 561.60
ground level.
Total Carried in ETB
4. concrete work
Reinforced concrete, class C-25,filled into form work and vibrated around reinforcement
bars. Form work and reinforcement measured Separately.

25cm thick slab M2 60.00


Steel reinforcement , cut bent and placed in position. Unit price shall include cutting bending
placing in position and tying wire.
Ø16 mm deformed bars kg 1482.00
Ø14mm deformed bars kg 1422.00
Total Carried in ETB
4. Finishing work
4.1 pointing to stone masounery wall cement mortar (1:3) mix. M2 327.60
4.2 5cm thick coping cement to sand ratio 1:3 M2 234.00
Total Carried in ETB
Total carried summary in ETB
Vat (15%)
Grand total
length width depth
Unit rate Amount

- 468 2.2 1

-
468 0.5 1

-
468 2.2 1

-
468 0.5
-
-

-
468 0.6 2
- 468 0.5
-
-

-
468 0.6 2
-

- 6 10

-
-
-
-
- 468 0.7
- 468 0.5
-
-
-
-
Project :- 474m Canal construction work 2017EC/2024GC
LOCATION :- From Mezegaja to River
Consultant:-Kabe small city
Client:-Kabe small city
Title:-Specification + bill off quantity
Item
no Description unit quantity Unit rate Amount

1.surveying and setting out


1.1.setting out
Fix centerline of the road by putting pegs at 20m interval including
setting of horizontal and vertical curve.set out also cross-section of
the road at 20m interval or in convenient.if terrainis very ragged by
placing pegs on center,two side and drainage lines of the road as well
as following design patterns of the cobblestone pegs for cobblestone
1.1. roads are in most cases made from pieces of reinforcement steel for
M
1 accuracy and strength for driving them deep into the ground.the
number of pegs along the cross section of the road ranges from 7-13
depending on the pattern of the cobblestone and requirement of the
side drain.

45.00 -

A. Sub-structure
1. Excavation and earth work
1.1 bulk Excavation in ordinary soil to an average depth of 3m. M3 600.00 -
Supply, spread and compact 40cm or more of base granular material or
gravel base as directed by the Engineer, compaction shall be made in layers
1.2 of 20cm with roller and by sprinkiling water to achieve the required proctor M3 120.00 -
density.gradation and quality approval is required in the quarry before
transporting and dumping the material to the site
Back fill with selected granular material around the back of the masonary
1.2 wall(abutment and wing wall )both side and compacte it attains the required M3 54.00 -
proctor density.
cart-away all surplus excavated materials & deposite to a distance not
1.3 M3 -
exceeding 10km from the site 600.00
25cm thick basaltic or equivalent stone hardcore well rolled consolidated &
1.4 M2 108 -
filled with crushed stone.
Total Carried in ETB -
2. concrete work -
5cm thick lean concrete quality c-5 150kg of cement/m3 at the bottom part
2.1 M2 36 -
of the masonry wall.(Abutment and wing wall)
2.2 15 cm thick mass concrete class c-20 250kg cement /m3 on hard core M2 120.00 -
0 -
3. Masonry Work -
80 cm thick at the top and 100 cm thick at the bottom stone thick basalt or
3.1 equivalent stone bedded on cement sand mortar 1:3 ratio below natural M3 120.00 -
ground level.
B Sub-structure -
4. concrete work
Reinforced concrete, class C-25,filled into form work and vibrated around reinforcement
bars. Form work and reinforcement measured Separately.

25cm thick slab M2 60.00 -


Steel reinforcement , cut bent and placed in position. Unit price shall include cutting bending
-
placing in position and tying wire.
Ø30 mm deformed bars kg 1482.00 -
Ø16mm deformed bars kg 1422.00 -
Total Carried in ETB -
5. Finishing work -
4.1 pointing to stone masounery wall cement mortar (1:3) mix. M2 54.00 -
4.2 5cm thick coping cement to sand ratio 1:3 M2 9.60 -
Total Carried in ETB -
Total carried summary in ETB -
Vat (15%) -
Grand total -
length width depth no
20 10 3 1
20 10 0.6 1

18 1 3 1

20 2 3 1

18 6 1 1

20 1 2 1
20 6 1

20 3 1 2

6 10 1
20 3 1 1
12 0.8 1
Project :-340m Canal construction work 2017EC/2024GC
LOCATION :- From Mezegaja to River
Consultant:-Kabe small city
Client:-Kabe small city
Title:-Specification + bill off quantity
Item
no Description unit quantity

A. Sub-structure
1. Excavation and earth work
1.1 Trench Excavation in ordinary soil to an average depth of 1m. M3 748.00
Back fill with selected granular material around the back of the masonary
1.2 M3 170.00
wall both side and compacte it attains the required proctor density.
cart-away all surplus excavated materials & deposite to a distance not
1.3 M3
exceeding 10km from the site 748.00
25cm thick basaltic or equivalent stone hardcore well rolled consolidated &
1.4 M2 170
filled with crushed stone.
Total Carried in ETB
2. concrete work
5cm thick lean concrete quality c-5 150kg of cement/m3 at the bottom part
2.1 M2 666
of the masonry wall.
2.2 10cm thick mass concrete class c-20 250kg cement /m3 on hard core M2 170.00
Total Carried in ETB
3. Masonry Work
50 cm thick at the top and 70 cm thick at the bottom stone thick basalt or
3.1 equivalent stone bedded on cement sand mortar 1:3 ratio below natural M3 408.00
ground level.
Total Carried in ETB
4. concrete work
Reinforced concrete, class C-25,filled into form work and vibrated around reinforcement
bars. Form work and reinforcement measured Separately.

25cm thick slab M2 60.00


Steel reinforcement , cut bent and placed in position. Unit price shall include cutting bending
placing in position and tying wire.
Ø16 mm deformed bars kg 1482.00
Ø14mm deformed bars kg 1422.00
Total Carried in ETB
4. Finishing work
4.1 pointing to stone masounery wall cement mortar (1:3) mix. M2 238.00
4.2 5cm thick coping cement to sand ratio 1:3 M2 170.00
Total Carried in ETB
Total carried summary in ETB
Vat (15%)
Grand total
length width depth
Unit rate Amount

- 340 2.2 1

-
340 0.5 1

-
340 2.2 1

-
340 0.5
-
-

-
340 0.6 2
- 340 0.5
-
-

-
340 0.6 2
-

- 6 10 1

-
-
-
-
- 340 0.7
- 340 0.5
-
-
-
-
Project :- Slab culvert construction work 2017EC/2024GC
LOCATION :-
Consultant:-Kabe small city
Client:-Kabe small city
Title:-Specification + bill off quantity of slab culvert
Item
no Description unit quantity

A. Sub-structure
1. Excavation and earth work
1.1 bulk Excavation in ordinary soil to an average depth of 2m. M3 60.00
Supply, spread and compact 40cm or more of base granular material or
gravel base as directed by the Engineer, t compaction shall be made in
1.2 layers of 20cm with roller and by sprinkiling water to achieve the required M3 6.00
proctor density.gradation and quality approval is required in the quarry
before transporting and dumping the material to the site
Back fill with selected granular material around the back of the masonary
1.2 wall(abutment and wing wall )both side and compacte it attains the required M3 8.00
proctor density.
cart-away all surplus excavated materials & deposite to a distance not
1.3 M3
exceeding 10km from the site 60.00
25cm thick basaltic or equivalent stone hardcore well rolled consolidated &
1.4 M2 30
filled with crushed stone.
Total Carried in ETB
2. concrete work
5cm thick lean concrete quality c-5 150kg of cement/m3 at the bottom part
2.1 M2 16
of the masonry wall.(Abutment and wing wall)
2.2 15 cm thick mass concrete class c-20 250kg cement /m3 on hard core M2 24.00
0
3. Masonry Work
60 cm thick at the top and 80 cm thick at the bottom stone thick basalt or
3.1 equivalent stone bedded on cement sand mortar 1:3 ratio below natural M3 24.00
ground level.
B Sub-structure
4. concrete work
Reinforced concrete, class C-25,filled into form work and vibrated around reinforcement
bars. Form work and reinforcement measured Separately.

25cm thick slab M2 22.00


Steel reinforcement , cut bent and placed in position. Unit price shall include cutting bending
placing in position and tying wire.
Ø16 mm deformed bars kg 505.60
Ø14mm deformed bars kg 316.00
Total Carried in ETB
5. Finishing work
4.1 pointing to stone masounery wall cement mortar (1:3) mix. M2 54.00
4.2 5cm thick coping cement to sand ratio 1:3 M 2
0.00
Total Carried in ETB
Total carried summary in ETB
Vat (15%)
Grand total
Unit rate Amount

length width depth no


- 10 3 2 1

10 3 0.2 1

-
10 0.2 2 2

-
10 3 2 1

- 3 1
10 1
-
-

-
10 0.8 1 2
- 10 2.4 1 1
-
-

-
10 0.8 1.5 2
-

- 10 2.2 1
-

-
-
-
-
- 10 2 1 2
- 0.8 1
-
-
-
-