BOQ
BOQ
A. Sub-structure
1. Excavation and earth work lengeth
1.1 Trench Excavation in ordinary soil to an average depth of 1m. M 3
995.40 - 425
Back fill with selected granular material around the back of the masonary
1.2 M3 94.80 -
wall both side and compacte it attains the required proctor density.
A. Sub-structure
1. Excavation and earth work
1.1 Trench Excavation in ordinary soil to an average depth of 1m. M3 1,029.60
Back fill with selected granular material around the back of the masonary
1.2 M3 234.00
wall both side and compacte it attains the required proctor density.
cart-away all surplus excavated materials & deposite to a distance not
1.3 M3
exceeding 10km from the site 1,029.60
25cm thick basaltic or equivalent stone hardcore well rolled consolidated &
1.4 M2 234
filled with crushed stone.
Total Carried in ETB
2. concrete work
5cm thick lean concrete quality c-5 150kg of cement/m3 at the bottom part
2.1 M2 819.6
of the masonry wall.
2.2 10cm thick mass concrete class c-20 250kg cement /m3 on hard core M2 234.00
Total Carried in ETB
3. Masonry Work
50 cm thick at the top and 70 cm thick at the bottom stone thick basalt or
3.1 equivalent stone bedded on cement sand mortar 1:3 ratio below natural M3 561.60
ground level.
Total Carried in ETB
4. concrete work
Reinforced concrete, class C-25,filled into form work and vibrated around reinforcement
bars. Form work and reinforcement measured Separately.
- 468 2.2 1
-
468 0.5 1
-
468 2.2 1
-
468 0.5
-
-
-
468 0.6 2
- 468 0.5
-
-
-
468 0.6 2
-
- 6 10
-
-
-
-
- 468 0.7
- 468 0.5
-
-
-
-
Project :- 474m Canal construction work 2017EC/2024GC
LOCATION :- From Mezegaja to River
Consultant:-Kabe small city
Client:-Kabe small city
Title:-Specification + bill off quantity
Item
no Description unit quantity Unit rate Amount
45.00 -
A. Sub-structure
1. Excavation and earth work
1.1 bulk Excavation in ordinary soil to an average depth of 3m. M3 600.00 -
Supply, spread and compact 40cm or more of base granular material or
gravel base as directed by the Engineer, compaction shall be made in layers
1.2 of 20cm with roller and by sprinkiling water to achieve the required proctor M3 120.00 -
density.gradation and quality approval is required in the quarry before
transporting and dumping the material to the site
Back fill with selected granular material around the back of the masonary
1.2 wall(abutment and wing wall )both side and compacte it attains the required M3 54.00 -
proctor density.
cart-away all surplus excavated materials & deposite to a distance not
1.3 M3 -
exceeding 10km from the site 600.00
25cm thick basaltic or equivalent stone hardcore well rolled consolidated &
1.4 M2 108 -
filled with crushed stone.
Total Carried in ETB -
2. concrete work -
5cm thick lean concrete quality c-5 150kg of cement/m3 at the bottom part
2.1 M2 36 -
of the masonry wall.(Abutment and wing wall)
2.2 15 cm thick mass concrete class c-20 250kg cement /m3 on hard core M2 120.00 -
0 -
3. Masonry Work -
80 cm thick at the top and 100 cm thick at the bottom stone thick basalt or
3.1 equivalent stone bedded on cement sand mortar 1:3 ratio below natural M3 120.00 -
ground level.
B Sub-structure -
4. concrete work
Reinforced concrete, class C-25,filled into form work and vibrated around reinforcement
bars. Form work and reinforcement measured Separately.
18 1 3 1
20 2 3 1
18 6 1 1
20 1 2 1
20 6 1
20 3 1 2
6 10 1
20 3 1 1
12 0.8 1
Project :-340m Canal construction work 2017EC/2024GC
LOCATION :- From Mezegaja to River
Consultant:-Kabe small city
Client:-Kabe small city
Title:-Specification + bill off quantity
Item
no Description unit quantity
A. Sub-structure
1. Excavation and earth work
1.1 Trench Excavation in ordinary soil to an average depth of 1m. M3 748.00
Back fill with selected granular material around the back of the masonary
1.2 M3 170.00
wall both side and compacte it attains the required proctor density.
cart-away all surplus excavated materials & deposite to a distance not
1.3 M3
exceeding 10km from the site 748.00
25cm thick basaltic or equivalent stone hardcore well rolled consolidated &
1.4 M2 170
filled with crushed stone.
Total Carried in ETB
2. concrete work
5cm thick lean concrete quality c-5 150kg of cement/m3 at the bottom part
2.1 M2 666
of the masonry wall.
2.2 10cm thick mass concrete class c-20 250kg cement /m3 on hard core M2 170.00
Total Carried in ETB
3. Masonry Work
50 cm thick at the top and 70 cm thick at the bottom stone thick basalt or
3.1 equivalent stone bedded on cement sand mortar 1:3 ratio below natural M3 408.00
ground level.
Total Carried in ETB
4. concrete work
Reinforced concrete, class C-25,filled into form work and vibrated around reinforcement
bars. Form work and reinforcement measured Separately.
- 340 2.2 1
-
340 0.5 1
-
340 2.2 1
-
340 0.5
-
-
-
340 0.6 2
- 340 0.5
-
-
-
340 0.6 2
-
- 6 10 1
-
-
-
-
- 340 0.7
- 340 0.5
-
-
-
-
Project :- Slab culvert construction work 2017EC/2024GC
LOCATION :-
Consultant:-Kabe small city
Client:-Kabe small city
Title:-Specification + bill off quantity of slab culvert
Item
no Description unit quantity
A. Sub-structure
1. Excavation and earth work
1.1 bulk Excavation in ordinary soil to an average depth of 2m. M3 60.00
Supply, spread and compact 40cm or more of base granular material or
gravel base as directed by the Engineer, t compaction shall be made in
1.2 layers of 20cm with roller and by sprinkiling water to achieve the required M3 6.00
proctor density.gradation and quality approval is required in the quarry
before transporting and dumping the material to the site
Back fill with selected granular material around the back of the masonary
1.2 wall(abutment and wing wall )both side and compacte it attains the required M3 8.00
proctor density.
cart-away all surplus excavated materials & deposite to a distance not
1.3 M3
exceeding 10km from the site 60.00
25cm thick basaltic or equivalent stone hardcore well rolled consolidated &
1.4 M2 30
filled with crushed stone.
Total Carried in ETB
2. concrete work
5cm thick lean concrete quality c-5 150kg of cement/m3 at the bottom part
2.1 M2 16
of the masonry wall.(Abutment and wing wall)
2.2 15 cm thick mass concrete class c-20 250kg cement /m3 on hard core M2 24.00
0
3. Masonry Work
60 cm thick at the top and 80 cm thick at the bottom stone thick basalt or
3.1 equivalent stone bedded on cement sand mortar 1:3 ratio below natural M3 24.00
ground level.
B Sub-structure
4. concrete work
Reinforced concrete, class C-25,filled into form work and vibrated around reinforcement
bars. Form work and reinforcement measured Separately.
10 3 0.2 1
-
10 0.2 2 2
-
10 3 2 1
- 3 1
10 1
-
-
-
10 0.8 1 2
- 10 2.4 1 1
-
-
-
10 0.8 1.5 2
-
- 10 2.2 1
-
-
-
-
-
- 10 2 1 2
- 0.8 1
-
-
-
-