The document outlines construction plans for a proposed cottage and main house, including details on drainage, septic tank, and soakaway systems. It includes specifications for wall construction, roofing, and compliance with local building codes. Elevations, sections, and notes on materials and finishes are also provided for clarity in the building process.

Uploaded by

designsroyal6
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views1 page

Con Drawing Assignment

The document outlines construction plans for a proposed cottage and main house, including details on drainage, septic tank, and soakaway systems. It includes specifications for wall construction, roofing, and compliance with local building codes. Elevations, sections, and notes on materials and finishes are also provided for clarity in the building process.

Uploaded by

designsroyal6
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

100mm diameter gew drain laid at 1:40 fall

to septic tank and soakaway rw


maximum height

wall plate level ROOF TRUSSES BY


SPECIALIST
+4.250
PRODUCTION
+2.900
window
level +2.250

b. i. c.
b. i. c.
master bedroom
bedroom
ffl
NOTES
NORTH-WEST ELEVATION ngl
+0.150
+0.000 1. REFER TO STRUCTURAL DRAWINGS FOR FOUNDATIONS AND
SCALE 1 : 100
RC SETTING OUT DETAILS BY THE ENGINEER.
2. ALL WALLS TO BE BUILT WITH BRICK FORCE FIRST THREE
COURSES. THEREAFTER, EVERY FIVE COURSES.
g 3. AIR VENTS TO BE AT STANDARD HEIGHT.
4. WINDOW SECTIONS AS SHOWN ON THE PLAN,
BUGLER BARS TO ALL OPENING SECTIONS.
plaster & paint SECTION C-C 5. ALL WINDOW SILLS TO HAVE BRICK GRIP DPC.
svp SCALE 1 : 100

6. ALL SURFACE BEDS TO BE CAST ON WELL


COMPACTED/CONSOLIDATED FILL.
rw 7. ALL BATHROOM, SHOWER AND TOILET WALLS SHALL BE
TILED USING CERAMIC TILES FROM FLOOR TO A HEIGHT OF

C C SOUTH-EAST ELEVATION 2100mm.


8. GARAGE AND STORE ROOM FLOORS TO BE 25mm min.GRANO
SCALE 1 : 100
b i c
b i c

FLOOR FINISH ON RC SLAB TO ENGINEER'S DETAIL ON


POLYSTYRENE INSULATION ON DPM ON 600mm LOOSE FILL
ON 150mm COMPACTED FILL.
plaster & paint
9. THE CONTRACTOR IS TO ALLOW FOR THE FIXING OF TIMBER
CORNICES THROUGHOUT
AND FOR THE FIXING OF SKIRTING TO ALL
FLOORS AND WALL JUNCTIONS.
10. ALL CONSTRUCTION TO COMPLY WITH THE 1977
SOUTH-WEST ELEVATION MODEL BUILDING BY-LAWS OF ZIMBABWE STANDARD CODES
SCALE 1 : 100 OF PRACTICE.
11. THE ROOF TO HAVE 100*100mm GUTTERS & DOWN PIPES
STAND No......
NORTH-EAST ELEVATION
SCALE 1 : 100 interlocking asbestos roofing tiles on RBAN DESIGN
GROUP

38x38mm fixing batterns at 400mm ctrs. on

Position of Septic Tank rw


sw trusses to manufacturer fixed on
38x114mm sw wall plate
OSAIC
Architecture - Property- Project Management
to septic tank and soakaway tied down 3 courses by hoop wire ties
and Soakaway

100X100mm g.i. gutter


g 9mm plaster board ceiling fixed on
PROPOSED 19x230mm sw. fascia board for
38x38mm sw. brandering at 400 ctrs
COTTAGE ON 1 coat primer and 2 coats paint
STAND NO. 18511 76mm coved plaster board cornice
svp
AREA 260Sqm ms. gutter bracket fixed to wall
PRECAST CONCRETE LINTOLS ABOVE
g ALL OPENINGS

rw
Render & set for paint 2v coats int. qual. pva. paint 75x75mm g.i. r.w.d.p. discharging on
Client

svp

svp
svp rw
Project Title:
smooth rendering painted int. qual.
PROPOSED
rw svp
MAIN HOUSE ON CARPORT
STAND NO. 18511 AREA 48Sqm
STAND No...... STAND No......
AREA 260Sqm cill brick with dpc under for all cills

76mm meranti skirting with matching quadrant

40mm cement sand screed on wood float plastered and painted ext.
100mm concrete slab on qual pva. paint
250 micron black polythene d.p.m. on Sheet Content:
150mm well compacted hardcore
FLOOR PLAN, SITE PLAN, ELEVATIONS,
dpc level 250x500mm precast concrete dripstone on SECTION & DETAILS
900mm wide precast concrete paving

300 min
all round

Drawing Number Rev


DETAILED SECTION cot/01/02/11 A
Drawn Approved
A.F Urb. M
15M ROAD Scale Date
SITE PLAN As shown FEB. 2016
SCALE 1 : 200