FOUNDATION LAYOUT AND COLUMN SCHEDULE-Model

The document provides construction notes for reinforced cement concrete (RCC) work, emphasizing that all dimensions are in feet and inches and must be read, not measured. It outlines specifications for materials, concrete mix, clear cover to reinforcement, lap lengths, and guidelines for shuttering and curing as per IS 456-2000. Additionally, it includes details on column orientation, spacing of bars, and foundation design considerations.

Uploaded by

Jay Patel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views1 page

FOUNDATION LAYOUT AND COLUMN SCHEDULE-Model

The document provides construction notes for reinforced cement concrete (RCC) work, emphasizing that all dimensions are in feet and inches and must be read, not measured. It outlines specifications for materials, concrete mix, clear cover to reinforcement, lap lengths, and guidelines for shuttering and curing as per IS 456-2000. Additionally, it includes details on column orientation, spacing of bars, and foundation design considerations.

Uploaded by

Jay Patel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

NOTES FOR RCC :-FOR RCC :-

1. ALL DIMENSIONS ARE IN FEET AND INCH.


2. ALL DIMENSIONS ARE TO BE READ NOT TO BE MEASURED.
3. IN CASE OF ANY DISCREPANCY IN DRAWING PLEASE CONTACT TO
STRUCTURE ENGINEER.
4. ALL PLAIN AND REINFORCED CONCRETE SHALL CONFORM TO IS-456-2000
5. CEMENT FOR ALL R.C.C. WORK TO BE 53 GRADE OPC/PPC CEMENT.
6. CLEAR COVER TO REINFORCEMENT UNLESS NOTED SHALL BE AS
FOLLOWS.
FOOTING 2" R.C.C. SLAB 1"
COLUMNS 1.5" R.C.C. LINTEL 1"
BEAMS 1"
7. CONCRETE MIX FOR DESIGN SHALL BE IN M25
8. ALL P.C.C. WORK SHALL BE IN (1:3:6). & 4" THK. UNLESS NOTED

10. LAP LENGTH 50xD (D=DIA. OF BAR)


11. REMOVAL OF SHUTTERING AND CURING AS PER IS 456:2000
12. ORIENTATION OF COLUMNS SHALL BE AS PER STRUCTURAL DRAWING.
13. IN COLUMNS WHERE VERTICAL BARS ARE LAPPED THE TIES SHALL BE HALF THE SPACING
THAN SPACING SPECIFIED IN DESIGN.
14. LAPS IN COLUMNS SHALL BE STAGGERED BY 1.5 X LD
15. MAXIMUM 50% BARS SHALL BE LAPPED AT LOCATION
16. NUMBER OF BAR SHOULD NOT BE COUNTED BUT SPACING INDICATED SHALL BE ADOPTED.
17. FOUNDATION HAS BEEN DESIGN FOR SBC OF BELOW GROUND LEVEL.
18. STRUCTURE DESIGN CONSIDER FOR DEAD LOAD AND LIVE LOAD ONLY AS PER IS 456-2000

PLINTH LVL.

PLINTH BEAM
AS/DETAIL

BRICK
WALL

4'-6"
1'-9"

7" 7"

P.C.C

9"
2'-11"

TYP. DWARF WALL DETAIL

k
4"

R.C.C FOOTING
P.C.C
k=10d BUT < 80mm
WHERE d DIA OF STIRRUPS (TYP)
TYP. STIRRUPS DETAILS
FOR BEAMS & COLUMNS

db = DIAMETER OF BAR
ld = DEVELOPMENT LENGTH
R.C.C FOOTING hc = CLEAR HEIGHT OF COLUMN
P.C.C FLOOR BEAM
(T.O.C)
TYPICAL PLAN OF COLUMN FOOTING

PLINTH/FGL CONFINING REINF.


5' (REFER COLUMN SCHEDULE)
(a)
PLINTH
BEAM/AS DETAIL

SPACING OF TIES
CONFINING REINF. (REFER COLUMN SCHEDULE)
(REFER COLUMN
SCHEDULE)(a)
(b)
5'

TYP.
Ld
CONFINING REINF.
FLOOR BEAM (REFER COLUMN SCHEDULE)
NGL
0' 0" / TIE BEAM (a)

Lo(NOT LESS THAN):


COLUMN = LARGER LATERAL DIM. OF COLUMN
REINF. = 1/6 CLEAR SPAN OF MEMBER(hc/6)
COLUMN RING = 450 MM
UPTO GOOD SOIL
MINI.5'-0" OR

R.C.C.
COLUMN

TOP STEEL DUCTILE DETAIL OF COLUMN


AS/SCHEDULE

12"
D

TYP
4"

BOTTOM STEEL
R.C.C FOOTING AS/SCHEDULE
P.C.C

TYPICAL SECTION OF COLUMN FOOTING