INSTALLATION CHECKLIST FOR FIRE FIGHTING SYSTEM
Project : Drawing No.
Client :
Pmc :
Building Name : Date-
Contractor : Gs Peb & Civils Works Pvt Ltd
SL. NO. INSPECTION YES NO REMARKS
OFFICE BUILDING
A (Alarm valve No- )
1 Approved drawings are on site?
2 Whether MS Black ERW pipes are as per specs/ Makes?
3 MIR has been done for all the materials?
4 Alarm facilities installed and operating per specs.?
5 Check for Alarm Valve installation and level?
6 Check Alarm Gong Bell; it is a working condition?
7 Gauges are above and below riser for check valve?
8 Water flow indicators provided?
9 Flow switch electrical connections are completed?
10 Piping layout and pipe size are the same as the plans?
11 Fire protection water piping installation completed?
12 Connection to water service main completed?
13 Pipe hangers and support spacing adequate?
14 Check for all riser, header and branches; for proper
supports are given all layout as per requirements?
15 Sprinkler head types per specifications/make?
16 Sprinkler is equipped with a guard if it subject to damage
17 Sprinklers are not painted or covered?
18 Check all sprinklers, the protection cap is removed?
19 Sprinklers are not obstructed?
20 Check for ITC connection are as per drawings?
21 Pressure gauges are installed as per requirement for all
zones & its calibrated?
22 Piping pressure testing completed?
23 Pressure test report has been submitted?
24 Piping system cleaned and flushed?
25 Piping properly labelled per specs?
26 Valve tags provided per specs?
Inspected By: Vender PMC/Client
Name : Mr. Mr.
Designation : Engineer Engineer
Signature :
Date :
INSTALLATION CHECKLIST FOR FIRE FIGHTING SYSTEM
Project : Drg No.
Client :
Pmc :
Building Name : date
Contractor : Gs Peb & Civils Works Pvt Ltd
SL. NO. INSPECTION YES NO REMARKS
CEILING SPRINKLER SYSTEM- Grid: .
(Alarm valve No- )
1 Approved drawings are on site?
2 Whether MS Black ERW pipes are as per specs/ Makes?
3 MIR has been done for all the materials?
4 Alarm facilities installed and operating per specs.?
5 Check for Alarm Valve installation and level?
6 Check Alarm Gong Bell; it is a working condition?
7 Gauges are above and below riser for check valve?
8 Water flow indicators provided?
9 Flow switch electrical connections are completed?
10 Piping layout and pipe size are the same as the plans?
11 Fire protection water piping installation completed?
12 Connection to water service main completed?
13 Pipe hangers and support spacing adequate?
14 Check for all riser, header and branches; for proper
supports are given all layout as per requirements?
15 Sprinkler head types per specifications/make?
16 Sprinkler is equipped with a guard if it subject to damag
17 Sprinklers are not painted or covered?
18 Check all sprinklers, the protection cap is removed?
19 Sprinklers are not obstructed?
20 Check for ITC connection are as per drawings?
Pressure gauges are installed as per requirement for all
21 zones & its calibrated?
22 Piping pressure testing completed?
23 Pressure test report has been submitted?
24 Piping system cleaned and flushed?
25 Piping properly labelled per specs?
26 Valve tags provided per specs?
Inspected By: Vender PMC/Client
Name : Mr. Mr.
Designation : Engineer Engineer
Signature :
Date :
INSTALLATION CHECKLIST FOR FIRE FIGHTING SYSTEM
Drawing No.
Project
Client :
Pmc :
Building Name :
Contractor : Gs Peb & Civils Works Pvt Ltd Date:
SL. NO. INSPECTION YES NO REMARKS
For External and Internal fire hydrant system
1 Approved drawings are on site?
2 Whether MS Black ERW pipes are as per specs/ Makes?
3 MIR has been done for all the materials?
4 V grooving at both ends
5 Tacking of both pipes completed which are to be joined
check for gap between two pipes which are to be joined (max.
6
3mm)
7 check for final welding run whether done or not?
8 check for red oxide application at welding joint
9 check for red oxide application to all pipe which are installed
10 check for the drilling of square plate and U clamp fixing
11 Whether the fasteners are as per specs/ Makes?
12 check for proper fixing of fastener on wall
13 check for distance between two supports as per drawing
check for proper fixing and tightening of U clamp with nut and
14
washer
15 check for hydrant valve make as per approved spec.
16 Check for hydrant post location and proper fixing as per drawing
17 check for hydrant valve fixing with proper gasket and nutbolts
check for isolation valve installation as per approved drawing and
18
spec.
check for installation of hose reel drum as per approved drawing
19
and spec.
check the installation of hose box as per approved drawing and
20
spec.
21 Connection to water service main completed?
22 Pressure gauges are installed as per requirement
23 Piping pressure testing completed?
24 Pressure test report has been submitted?
25 Piping system cleaned and flushed?
26 Piping properly labelled per specs?
27 Valve tags provided per specs?
Inspected By: Vender PMC/Client
Name : Mr. Mr.
Designation : Engineer Engineer
Signature :
Date :
CHECK LIST FOR FIRE ALARM SYSTEM
Name of project :
Name of Building :
Structure/Location :
Name of system : FIRE ALARM AND DETECTION SYSTEM
Ref. Drawing No :
Method Statement Ref No :
Date :
STATUS
S.NO DESCRIPTION REMARKS
yes no
Conduit Installation
1 Does the distance between the each saddle as per standard?
2 Plastic getties (Fischer's) are used for saddle/base installation?
3 Proper sized bends/conduit jointer used?
Cable Installation
Does the distance between the each saddle within 400mm for armored
4
cables?
Cabling done using conduits for armored cables while running inside the
5
walls?
6 Plastic getties (Fischer's) are used for saddle/base installation?
7 Cable bending is done without effecting the cable strength?
8 Cable end caps provided at cable end after installation?
Detector Installation
9 Junction box installed properly?
10 Proper cable entry to junction box with glands?
11 Detector base fixed properly?
12 Loop cables terminated to base with lugs and ferules?
13 Detector fixed properly?
14 Identification tag sticked on detectors?
Devices Installation
Junction box installed behind the Devices like Hooter, Horn/strobe , control
15
relay, Input module and monitor module ?
16 devices Installed fixed aesthetically
17 Loop cables terminated to devices with lugs and ferules?
18 Identification tag sticked on devices?
Fire Panel Installation
19 Panel Installed properly with support/Anchor fasteners ?
20 Loop cable laid with cable trays/trufs up to panel ?
21 Rubber gasket used to put for holes made for cable entries ?
Are all the cables have been terminated with ferules and lugs as per wiring
22
diagram ?
23 Loop drawings and details pasted in panels?
Comments (If any)
PMC/Client Contractor representative
INSTALLATION CHECKLIST FOR PLUMBING WORK
Project : Drawing No.
Building Name : Date-
Contractor :
SL. NO. INSPECTION POINTS YES NO REMARKS
1 Are all fixtures like bib taps, mixers, etc. fixed properly?
2 Is there any leakage from taps/other C.P. fixtures?
3 Is there proper pressure to all the taps/cocks?
4 Is the half-turn flush cock operation proper?
Is there any choke-up in W.C., after the continuous flow of water from half-
5 turn flush cock for at least five minutes?
6 Is there any cement lump observed in the P-trap of W.C.?
Is there any choke-up in the Nahanni trap of the bathroom, after the
7 continuous flow of water for five minutes?
8 Is the hot and cold-water mixer operation proper?
9 Are the boiler connections on loft properly plugged?
10 Is the low-level water tank operation of E.W.C. proper?
11 Is the seat cover of E.W.C. fixed properly?
12 Are all sanitary fixtures properly cleaned?
13 Are there any cracks/breakage to any of the sanitary fittings?
Is there any leakage from the upvc. lines in the duct, after continuous
14 water flow for fifteen minutes?
15 Is the fixing of G.I./C.I./A.C. lines in plumb and clamped properly?
16 Is there any leakage in the drainage chambers?
Is there any leakage in the main inlet and outlet upvc. lines of the water
17 tanks?
18 Are there any cracks on white cement-filled between washbasin and wall?
19 Is there any separate mark for Municipal water tap and tap from O.H.W.T.?
20 Are escape spouts from W.C. and bath are provided?
21 Check for the source of water - Borewell/SIPCOT/Park/Municipal
22 If it is borewell - Please check for Ground water clearance from authority
23 Check for water meter location at Pump room and customer tap off point
24 Check for water meter approved brand
25 Sewer pipe line gradient and slope to checked
26 Sewer pipe line water flow to be checked by means of ball test
27 Sewer chambers water leak test to be checked
Inspected By: PMC/Client
Name : Mr.
Designation : Engineer
Signature :
Date :
CHECK LIST FOR FABRICATIN WORK
Project : Drg No. :
Client : Date :
Pmc : Report No :
Building Name :
Contractor : Gs Peb & Civils Works Pvt Ltd
SL. NO. INSPECTION YES NO REMARKS
1 Approved drawings are on site?
2 Whether MS Black ERW pipes are as per specs/ Makes?
3 MIR has been done for all the materials?
4 V grooving at both ends
5 Tacking of both pipes completed which are to be joined
6 check for gap between two pipes which are to be joined (max. 3mm)
7 check for final welding run whether done or not?
8 check for metal yellow primer application at welding joint
9 check for metal yellow primer application to all pipe which are installed
10 Branches and Headers are fabricated as per drawing
11 Hole made at sprinkler point as per OD of sprinkler socket
12 All bur is removed from hole by filling or gnoring.
13 Visual inspection of all welding joints done.
14 All slags and spatter are removed from welding joints.
15 Branch and header is straight and aligned.
16 Check distance between sprinkler holes as per drawing.
Inspected By: Contractor PMC/Client
Name : Mr. Mr.
Designation : Engineer Engineer
Signature :
Date :
PAINTING CHECKLIST FOR FIRE FIGHTING SYSTEM
Project : Drg No. :
Client : Date : Report No :
Pmc :
Building Name :
Contractor : Gs Peb & Civils Works Pvt Ltd
Surface cleaned by :
System :
Primer 1st Primer 1st 1st Coat Po 2nd Coat Po
SL. NO. Description Coat DFT Coat DFT Red paint Red paint
(In μm) (In μm) DFT (In μm) DFT (In μm)
Inspected By: Contractor PMC/Client
Name : Mr. Mr.
Designation :
Signature :
Date :
G SYSTEM
port No :
REMARKS
PMC/Client
r.
Holiday Test Report For Underground Pipe
Project : Drg No. :
Client : Date : Report No :
Pmc :
Building Name :
Contractor : Gs Peb & Civils Works Pvt Ltd
Surface cleaned by :
System :
Surface Coating Primer Holiday Test
Wrapping Date of
preparation Date of Date of Inspection of primer
SL. NO. Description Overlap(MM Inspection of
(Wire Brush Inspection application
) Leak test
Cleaning)
Applied
Primer Visually Voltage Result
Remarks :-
Inspected By: Contractor PMC/Client
Name : Mr. Mr.
Designation :
Signature :
Date :