0% found this document useful (0 votes)
15 views

Test

The document contains a series of safety-related questions and answers concerning various workplace scenarios, focusing on the handling of hazardous materials, equipment operation, and safety protocols. It emphasizes the importance of proper training, inspections, and adherence to safety guidelines to prevent accidents and ensure worker safety. Key topics include rigging, electrical safety, confined space procedures, and the use of personal protective equipment.

Uploaded by

shahprince262
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
15 views

Test

The document contains a series of safety-related questions and answers concerning various workplace scenarios, focusing on the handling of hazardous materials, equipment operation, and safety protocols. It emphasizes the importance of proper training, inspections, and adherence to safety guidelines to prevent accidents and ensure worker safety. Key topics include rigging, electrical safety, confined space procedures, and the use of personal protective equipment.

Uploaded by

shahprince262
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 13
7 /ADVISO! ‘SAFETY OFFICER) your sense of fete elect all that apply: to detect H2S? Select all that a se of smel 8, Why shouldn't rely on SE aan a. You can’t smell it at low concent b, itsmells bad g You can’t smell it at high concentrations will kil you before you smell it 9. where Soul sings hve hisoted capac nated? a. On accompanying shackles . Inthe accompanying manual & On the sling’s storage container Ona tag or stamp on the sling 10. What does the safety handbook say about shackles and connecting devices’ ‘Shackles and connecting devices should be completely closed and bolted Shackles and connecting devices should be used with all loads © Shackles and connecting devices should be used with all loads d. Shackles and connecting devices should be used with all loads 12. Who must rig crane loads? 2A Saudi Aramco Contractor b. A Saudi Aramco Employee ‘A Saudi Aramco Crane Operator A Saudi Aramco Certified Rigger 12. What d6@s the safety handbook say about suspended loads? Select allitems that apply. @ Donot stand or walk under suspended loads b. Do not move suspended loads left or right © Do not leave suspended loads unattended unless properly secured d. Do not move suspended loads up or down 13. How should rigging hardware be. inspected before each use? Select one or more items that @ By approved inspection tools ® Byvisuaty examining ‘By using the maximum load d. By tapping with hammer 714. What does the safety handbook say about maintaining rigging ha re 2. Perform quarterly maintenance by a certified maintainer User shall properly maintain all rigging hardware Rigging hardware shall be replace after each use All defective hardware shall be removed from the: 15: Loads can be rigged from which ofthe following structures? a. Process Piping without approval, b. Process Piping with approval Load bearing structural members with Load bearing structural members What applies to all cab gl a Must be safe B.) Must have ‘Must be kept clean, : Mas nothon (ou are a crane operene an” Samage et the object slowly unt lanate a spotter (r signal person lower the : object at this cat e safe and permitted for hea Engine stopped, operator outsid 4. Engine stopped, vehicle unattended. When getting in to (or out to) heavy equipment which ofthe fol ) 1 foot on the step and 2 hands on the hand hold foot on the step and 1 hand on the hand holds €. 2 feet on the step and 2 hands onthe hand holds. 4. 2 feet on the step and thand on the hand hol What must be done before any diesing of cleanup work's started )) Notify appropriate parties BS) Identify all ines Inform the manager @.) Identity al utilities You need to inform the operator of heavy equipment to stop work equipment and is wearing ear defenders. What should you do before apr a) Establish eye contact shout loudly to the signal man Establish eye contact with the signal man The operator d. Shout loudly to the operator hat restrictions apply when working around power Ines ‘a, There are no additional restrict b._Allnearby powerlines must be de-energize Maintain minimum distances per te safety Handbook 1 heavy equipment ions, but work careful Ensure you have rubber tires ont ent? Selectallitems that appl rn operate heavy equipm 23, Who ca rape0 oF8ica/Sufty plant Department Group ICAL ASSESMENT Tanaib Gas lant DeF nd Compliance of and a SAFETY OFFICER/ADVISOR TE! jes operators oF ‘ rent certified operator ) Saudi Arab Governm« © saudi Aramco certified operators ba Gulf Cooperation Council certified operator 24. When any piece of heavy equipment such as loader handbook? 4. Workers must kep clear hat is required according to the safety ersing, what is re b. Reversing lights must illuminate The driver must look to the rear @© Anauéible backup alarm must sound 25. Where is tafe to rest? 2. Inthe shade under heavy equipment © Ina esnated rest area Where you canbe seen near heavy equipment 4. Inthe shade of atthe side of heavy equipment \When transferring hydrocarbons from one vessel to another, what shouldbe electrically bonded? Thehose ‘The receiving container 26. © The employee 4. The source container 27. What isthe first thing you should do in case of a fire? 2. Close all doors . Locate a fire extinguisher © Sound the alarm and get help @. Evacuate the building Which type of fires should you attempt to ext @® Gasoline fires b. Gas ies 6) Electrical fires (® Paper fires After thé fre has been extinguished, what should you . Leave the area and inform your superviso b. Gotothe assembly area © Goback to work @ Stand by to make sure there . From what direction should you approact © Downwind B” Any direction © Upwind, 4. Crosswind inguish, provided you have the appr Tanajib Gas p OE a SAFETY OFFICER, lant Depar nd Com, =“. VISOR TECHINTead hat components are NOT allowed asa par a. Lanyard b, that has broken fall, mae Harness ofa wast bets sone cSeltockng snap hooks ® Manuaticesing snopes 32. If you are asked to climb a ladder r ks ore than Gm (208) witho Refuse and talk to your supery a prot b. Use the great care when climbing ©) Use a personal falharrest sytem 33. You are going to operat: Feet pr > an elevating work pl ng work platform. What sae Y precautions must b You must wear a full ody harness and anchor itt the it he elevating work platform must have a current SA inspection sticker © You must weigh less than 200Ibs, including anything you areca 4. You must be qualified to operate the elevating work patfor 34. What must you do before you rely on a fall arrest system? @) Inspect the fall arrest system ®. Check for inspection sticker ©. Remove defective components 4. Attached a weight and lett fal 35. You need scaffolding that has special requirements ori taller than 38m (125A). Wh: 1. Scaffold plans must be produced, )) The Area Loss Prevention Division must review the pan Consulting Services or an Approved 3" Party must re 4. The Proponent must review the plans. 36. Who can erect scaffolding shorten than 12.2m (40)? Qualified Scaffold Erectors Any team of Experienced Contract e. Approved Specialist Scaffolding Erector dd, Any team of Saudi Aramco Employees ld you take when using a personal fall-arrest system: 37. What precautions sho materials a. Do not use itto he By) Protect it from cuts or abrasions e. Wash it at least once a week d, Do not use after it stops a fall Jevating work platform. arty are within weight limits What should you do? 38. You are about to raise anel ‘a. Ensure you and tools c bb. Connect the lanyard of your Retract the outriggers so thatthe lifts s securely closed. nesstothe anc @ checkshar the gateor chain aero OE8.C6/Safety Officer ent part plant Del tanajib 6 ‘ogandC pvisoR Group NICAL ASS! e working? 1 should you do befor r ace. What shoul ight. red work surfa 1, You have to work on a fixed elevated eeding th we Test by exceed CB} teok for and guard all flor openings wpe out : 2 ie estan fa special scaffold tal ‘ stion and tagging of 2 $P 40, Who can complete the fl inset 2. Any Contactor Employee © Seatfoid inspector °F: Seafold Supervisor 4 Any Sai Aramco Employee 41, What should you check before climbing a ladder? a. Ensure the ladder extends 1m above the top landing b, Ensure the adder is set approximately at 4: slope © inspect the adder, and remove, it is defective Ensure the ladder is ree to move atthe top. 42, How should you safely climb up or down a ladder? lim down facing away from the ladder. b. Climb up facing away from the ladder. climb down facing the ladder. Climb up facing the ladder. 43, You are going to operate an elevated work platform. What safety considerations must be followed? 3. Always use the outrigger, when fitted tothe elevating It . Check clearance from overhead obstructions when raising lift «& Use a second person to guide you when changing location. @ Neverte at tiet ras eet ee aoe ea 444, How far above the impact surface must afalLarrest system be secured? 84m (27) © 56m ash) © 2.8m (Sf) © 11am (36rt 45, Who can erect scaffolding taller than 12.2m (40R)? @ Approved Specialist Scaffolding Erectors b._ Any team of Experienced Contractors Qualified Scaffold Erector 4. Any team of Saudi rami 46, What precaution should you take’ Never stand on the non Never stand on the & Always use a no 4. Always carry equip 5 naib Gas Plant lant De OF and Com, SAFETY oFricggnt COMI WVADVISOR TEcHnrcat ASSESMENT © Electrical Hazara Re &. Advance ite Supp When should Ground Faut Creve nen © When using temporary wiing & Atalltimes 2) When using portable electra tots i ite folowing MUS ele erounded ad toned du ng abras delivery Systems . Self-contained breathing devices, mixed ai Al supplied, SCBA, Air mined Qllofthe above 2. hich of the following should have an inspection sticker 8. The rigging equipment b. Theload The outrigger mats © the crane {63.Which of the following lifts require critical i Operating inside a warehous Geetiehsten sey ) Lifting a load Satish ons Lifting a large load th 64,When lowering a load into excavation pit 5 meters deep, wh be positioned! ing and bra ofthe folowing ind ec etrleun Engi als who need Indvidua All employees yno need to individuals ib Gas Plant Tanajib Gas Pl ‘Of and Compliance GrouP SSESMENT -y OFFICER/ADVISOR TECHNICAL ASSESN SAFET electrical equipment is defective? ical equipr lef a piece of electrical ea at should you do if you notice that hs eee a perform the job as normal 2 fthe damage is minimal b. Fix the damage and perform the job a © bo not perform the job NX. Replace the equipment and perform the job 68, Inwhich ofthe following scenarios MUST you use a non-con 2. When working near water © When working nea electrical conductors When using electrical tools @) When working near electrical equipment 70. You are performing high voltage work and are wearing the proper PPE, What other items may be required to provide insulation from energized or grounded items? Conducting Mats b. Non-conducting Mats & Conducting Blankets OM cackcns niet 71 When working within arm's length of electrical equipment, you should NOT wear which of the following? a. Safety Glass (B) Jewelry Glasses with metal frames Rings 72. How should blown fuses be removed? ‘a. Bythe hand wearing rubber gloves b. With any non-conductive tool & By the hand after de-energizing the circuit. © with approved use pullers 73. Why should the electrical panel board breake a. For thorough record kee} is normal ductive ladder? 7. Whats the first se ‘new proponent en be pert nt Adopt the | PPE, uit ferns oe of a similar, « 5 ae ns of requirements from Leo, . Saudi Ar 76. At whict a a h Of the following times must gas t itheo : testing be performed ina confined space? Db. After, ANY Person exits from the s pace. © Before the entry ‘of any worker. i After any failure of and RCD Ing air for supplied air respirato, lation Grade A Compressed Gas Association Grade D Gas Processing Association Grade 8 . Gas Processing Association Grade ¢ 78. Whiat action isto be taken to address unlabeled containers of chemicals? , Dump the material down chemical sewer, b. Dump the material down oly water sewer, {& Dump material into collection drum for later disposal Test to determine what the material is and elther label or dispose of 79. Acontractor in your areas digging a trench in type B sol. What isthe minimum distance? thats a heavy dump truck must be form the edge of the trench? Ameter or depth or the trench, whichever is greater ‘meter or depth of the trench, whichever is greater. G- 2meter or 2xthe depth of the trench, whichever i greater. dd. 3meter or the depth ofthe trench, whichever is greater 80. At what noise level is hearing protection required? a >80d8 >85dB € 79508 d. >90d8 : '81. What type of fiting must be used for the joints of compressed air hoses Crimped B. Banded cc. Clamped d, Twist lock '82. Whatiis the minimum tall swing clearance for a crane? (ageet ) echnical Assessment 2023 PPD O€8CG/Safety Offcer/Advisr Technical Ms * 83, Who must be In charge of Discussion with local personne! Where is single block valve isolation forbidden to be used Where equipment and piping containing hazardous materials Where equipment and piping containing hazardous materials possible \When approved by the superintendent 4. When a hot work permit isnot required What factors govern the selection of filter cartridge respirator Level of contaminants user fitness, F User fitness; type of contaminant; warning properties of contaminant ure; level of contaminant; warning properties of contaminant warning properties of contaminant Temperat 4. Level of contaminant; type of contaminant What are the symptoms of heat stroke?” strong rapid pulse, heavy sweating, high body temperature Strong rapid pulse, no sweating, high body temperature. feakcapid pulse, no sweating, high body temperature Strong rapid pulse heavy sweating, col clammy skin 68, What distance maintained between the ladder and any obstructions? 38 cm (15 in) ‘em (20 in) 60cm (24 in) d. 75¢m/(30'n) confined space Is finished, what activities must be done to complete the confined space enity and 89. Once work na close the permit/ sign off the pert equipment and entrants, mit, ensure all equipment is removed from the space, and decontaminate b._ sign off the permit, recharge SCBA bottles, and decontaminate equipment and entrants rit, recharge SCBA bottles, and decontaminate equipment rit, ensure all equipment is removed from the space, and decontaminate equipment show what minimum information? 6. Sign off the pe ® Sign off the per 90, Every chemical container must label os “Amount and contents Amount and hazar Hazards and contents Content and emergency actions ‘TGPPD OFBCG/Safety OMTieet/Aavior Technical AsKessrWeN 2023 Plant Department .e Group HNICAL ASSESMENT Tanajib Gas (OE and Complianc SAFETY OFFICER/ADVISOR TECH Bes creneoroung arent sty rection sed for company ogee cng 67 a. Oxygen an ue gos hoses are diferent ol Bi teak detections devices, (© dierent tings or oxygen thon for fuel 28 eset ave Any other means of asbestos removal than wet methods wl req nae Be Koes Prevention Depetmon Proponent Environmental Coordinator ce) Environmental Protection Department. re the approval of which SA department. GOODLUCK PASSING SCORE-70% Iqama/passport number:

You might also like