The document outlines the organization of data for a spares analysis tool, specifying that each unique part number should have a single associated description, failure rate, time period, and confidence. It includes a table of part numbers with their respective details, emphasizing the need to eliminate duplicates and ensure accuracy. Additionally, comments highlight the critical nature of certain items and their procurement timelines.

Uploaded by

Baris Adali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views3 pages

template_for_spares_analysis_input_data_reliability_analytics_toolkit

The document outlines the organization of data for a spares analysis tool, specifying that each unique part number should have a single associated description, failure rate, time period, and confidence. It includes a table of part numbers with their respective details, emphasizing the need to eliminate duplicates and ensure accuracy. Additionally, comments highlight the critical nature of certain items and their procurement timelines.

Uploaded by

Baris Adali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

1. Organize data as shown below, one part per line. The part number field is limited to 40 characters.

2. Each unique part number should only have one description, failure rate, time period and confidence associated with it. If an
3. Copy and paste the data starting in row 10, columns A - E, into Input Box 1 of the spares analysis tool.

Failure Rate
(failures per
million Time Period
Part Number Description hours) (hours) Confidence
830258 Power Supply Assembly 30 2190 0.9
830258 Power Supply Assembly 30 2190 0.9
830258 Power Supply Assembly 30 2190 0.9
543221 Battery control system 22 2190 0.9
543221 Battery control system 22 2190 0.9
543221 Battery control system 22 2190 0.9
543221 Battery control system 22 2190 0.9
543221 Battery control system 22 2190 0.9
543221 Battery control system 22 2190 0.9
665789 Combination Pressure/Flow Regulator 40 4380 0.9
665789 Combination Pressure/Flow Regulator 40 4380 0.9
665789 Combination Pressure/Flow Regulator 40 4380 0.9
223141 Interface LRU 12 2190 0.9
223141 Interface LRU 12 2190 0.9
223141 Interface LRU 12 2190 0.9
223141 Interface LRU 12 2190 0.9
223141 Interface LRU 12 2190 0.9
223141 Interface LRU 12 2190 0.9
223141 Interface LRU 12 2190 0.9
555432 Navigation computer 65 2190 0.95
555432 Navigation computer 65 2190 0.95
555432 Navigation computer 65 2190 0.95
555432 Navigation computer 65 2190 0.95
887654 Flight Data Transfer Unit 58 2190 0.9
887654 Flight Data Transfer Unit 58 2190 0.9
887654 Flight Data Transfer Unit 58 2190 0.9
887654 Flight Data Transfer Unit 58 2190 0.9
887654 Flight Data Transfer Unit 58 2190 0.9
0 characters.
nd confidence associated with it. If anomalies exist (e.g., different failure rates entered for the same part number), the last entry for a give
es analysis tool.

Comments

Long lead time item. Requires six months (4,380 hours) procurement time.
Long lead time item. Requires six months (4,380 hours) procurement time.
Long lead time item. Requires six months (4,380 hours) procurement time.

Highly critical item for system availability. Spare at 95% confidence.


Highly critical item for system availability. Spare at 95% confidence.
Highly critical item for system availability. Spare at 95% confidence.
Highly critical item for system availability. Spare at 95% confidence.