0% found this document useful (0 votes)
30 views4 pages

1SV10110 110C14 Asa HJ GF SDW Ar 11012 C0

The document is a Shop Drawing Submittal Form for the Amaala Staff Village project, detailing the submission of architectural drawings for ground floor blockwork partitions. It includes general information about the contractor, project code, drawing title, and status codes for acceptance. The form also contains technical comments and signatures from relevant parties involved in the project.

Uploaded by

malikalinow
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views4 pages

1SV10110 110C14 Asa HJ GF SDW Ar 11012 C0

The document is a Shop Drawing Submittal Form for the Amaala Staff Village project, detailing the submission of architectural drawings for ground floor blockwork partitions. It includes general information about the contractor, project code, drawing title, and status codes for acceptance. The form also contains technical comments and signatures from relevant parties involved in the project.

Uploaded by

malikalinow
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Shop Drawing Submittal Form

RSG-CN-FRM-0013

AMAALA

General Information
RSG-AMAALA 110C14 SV Staff Village
Program Name Project Code Project Name
Zone 8 Hospital
Amaala Staff
Contract ref. Package
Village
A.S Alsayed & Partners &
Contractor Submittal No.
Contracting Co. Ltd
Contract No. 1SV10110-110C14 Date 19-Sep-24
To the Engineer Saudi Arabian Parsons Limited
Drawing No. 1SV10110-110C14-ASA-HJ-GF-SDW-AR-11012-C0 Contract Drawing Ref. No.
Discipline/Category Architectural Other (please specify)
Drawing Title Ground Floor Blockwork Partitions Plan Zone 4 Part 3

The Contractor certifies that this submittal has been verified and coordinated by all related disciplines and relevant subcontractors.

Contractor Signature

Ashraf Mohamed Zaki 19-Sep-24


Name Signature Date

Technical Construction Coordination Support - Comments


Comments:

Technical Construction Coordination Lead - Comments


MU-2
Comments:

Date
Name Signature Date

Status Code MU-1

☐ Accepted ☐ Accepted with Comments ☐ Revise and Resubmit

☐ Rejected ☐ Review not Required

Contractor Acknowledgement

Date
Name Signature Date

Note: Technical Construction Coordination to initiate the Sub Workflow using Shop Drawings Performance Review Workflow for the
items included in the pre-defined list agreed with RSG.

RSG-CN-FRM-0013
Rev. 01, 23 May 2024 Page 1 of 1
FIRE AND LIFE SAFETY LEGEND:

SMOKE BARRIER

30 Minutes FIRE RATED WALL

1 HOUR (60 Minutes) FIRE RATED WALL

2 HOUR (120 Minutes) FIRE RATED WALL

1 HOUR (60 Minutes) SMOKE COMPARTMENTATION WALL

GROUND FLOOR WALL TYPE − ZONE 4 PART 3


Type Mark Fire Rating Description
BW1 - 200mm THK. SOLID BLOCK CONCRETE MASONARY UNITS, UP TO STRUCTURAL ELEMENT LEVEL
BW2 1hr 200mm THK. ONE HOUR FIRE RATED SOLID BLOCK CONCRETE MASONARY UNITS, UP TO STRUCTURAL ELEMENT LEVEL
BW7 - 100mm THK. SOLID BLOCK CONCRETE MASONARY UNITS, UP TO STRUCTURAL ELEMENT LEVEL
BW8 1hr 100mm THK. ONE HOUR FIRE RATED SOLID BLOCK CONCRETE MASONARY UNITS, UP TO STRUCTURAL ELEMENT LEVEL

LEGEND:
31 32 33 34
22300
RC CONCRETE ROOM NAME

SLOID CMU BB.8.1.A.01


7000 8300 7000
CENTRAL CENTRAL
STAFF STAFF DRY WALL
STATION STATION LEVEL ROOM FINISH
00.2.3.B.01 00.2.6.B.01
### WALL TYPE

STF 200x200
## DOOR NUMBER

200

200
HYDROTHERPAY

200
STF 200x200 TREADMILL W01 ### FINSH FLOOR LEVEL
CLINIC OFFICE HEAD 00.2.6.C.06 F.F.L

1100

1100
600
W02 PULMONOLOGY CIRCULATION NURSE
00.2.3.D.05 00.2.3.X.01 00.2.3.B.03 ### STRUCTURAL SLAB LEVEL

200
STF 200x200 STF 200x200 S.S.L

200

200
STF ###x### STIFFENER

1000
BW1

750

750
BW1 REFER TO SHEET
1SV10110−110C14−ASA−HJ−GF−SDW−AR−11010 IFC REFERENCE DRAWINGS:
I'

500

500
DRAWING No: REV DRAWING NAME

105

105
STF 100x105

610

610
1SV10110-110D25-DAJ-HJ-00- ARCHITECTURE 50-TYPES AND DETAILS WALL
BW1 N1

1000
DWG-AR-50004 TYPES AND DETAILS
CLEAN SUPPLY

1100

1100
00.2.3.B.04 A2 ARCHITECTURAL NAMING CONVENTION, SHEET

200

200
1SV10110-110D25-DAJ-HJ-XX-
BW1 -0.100 N1

1625
DWG-AR-00002 LIST, SYMBOLS,LEGEND AND NOTES
STF 200x200
S.S.L FEMALE ARCHITECTURAL 10-OVERALL FLOOR AND
STF 100x200 W01 1SV10110-110D25-DAJ-HJ-GF-

200
CLEAN SUPPLY N1
STF 200x200 200 CHANGE RM. DWG-AR-10001 ROOF PLAN GROUND FLOOR MASTER PLAN
00.2.6.B.04 PATIENT

1100

1100
LUNG 200 2075 100 1390 100 1SV10110-110D25-DAJ-HJ-GF- ARCHITECTURAL 11-PART FLOOR AND ROOF

420
STF 100x650 N1
W02 00.2.6.C.08

600
ASSESSMENT - PLANS GROUND LEVEL PARTIAL PLAN - PART 04

650
DWG-AR-11004
PFT

200

200

200

200
1SV10110-110D25-DAJ-HJ-GF- OVERALL PLAN - GROUND FLOOR FIRE & LIFE
00.2.3.D.11 STF 100x200 -0.400 STF 100x200 N2
SAFETY LAYOUT
DWG-FL-10002

200
STF 200x200

200

200
S.S.L BW7 STF 200x200
BW7

1475

1100

1100

1100

1100
BW7

1575

1575
BW7
STF 100x650 200

100
100
STF 100x300 990 200
SHOP DRAWINGS REFERENCES:

100
200

1860

1860
BW1 200 1675

274
MU-13 STF 100x650
2500

6500

6500

3250

6500

7000
4 DRAWING No: REV DRAWING NAME

650
2920
STF 100x200
DIRTY UTILITY DISPOSAL 21004

275
100
00.2.3.B.07 00.2.6.B.07
2075
-0.100 BW1
1390

100
1100 100
-0.100 STF 100x200 S.S.L
S.S.L BW7 -0MU-11
.400 STF 200x200

1575

1575

200

200
STF 100x225 STF 100x300

1100

1100

1100
1475

1400
2833
S.S.L
100 2133 300 300 BW7 MALE CHANGE W01
STF 200x200 BW7
200

MU-12 RM. PATIENT

1100

1100
STF 100x200
RFIs REFERENCES:

200

200

200

200
00.2.6.C.07

225
CLINIC STF 100x520
2233 300 MU-9 STF 100x200
600

GASTROENTEROLOGY

520

420
-0.100 DIRTY UTILITY 200 2075 100 1390 100 RFI No: REV RFI SUBJECT:
W02 00.2.3.D.06

200
A2 BW8 00.2.6.B.06
BW7

200

200
200

S.S.L 200 STF 100x200

1100
STF 200x200 TOILET MU-10 STF 100x200 STF 200x200
3

1720

1625
21004 PATIENT
CIRCULATION

195 2320

2120
1720

2320

1100

1100
00.2.3.E.03 A2
00.2.6.X.01 -0.100 -Diagonal Dimension

1030

1030
1000

STF 100x200 -0.400

200
S.S.L Required for each room.

105
BW1 75 500 S.S.L 1658 BW8 BW1

105
STF 100x300 STF 100x105

300 300
BW7
J'
500

500

500
200
STF 100x200

330
STF 100x75
BW1
200 330

175 500 1558 300 300 BW1

200

200
330
STF 200x200 BW7 2833
STF 200x200
STF 100x300
PATIENT STORE
HOLDING C0 18.09.2024 ISSUE FOR APPROVAL MH
1100

GENERAL
W01 CLINIC 00.2.3.E.02 00.2.6.B.05

1SV10110−110C14−ASA−HJ−GF−SDW−AR−11011
ENDOCRINOLOGY Rev. Date Reason For Issue Drw Chk Apr
00.2.3.D.07
STF 200x200
SHOP DRAWING
200

-0.100
Key Plan.
S.S.L

REFER TO SHEET
GYMNASIUM

4460

4460
00.2.6.C.09

21000
6500

7000
6600
2980

BW1

BW8
BW8

CLINIC STF 100x200 STF 100x300 BW7


CARDIOLOGOY TREATMENT 3230
00.2.3.D.08 RM.
200

STF 200x200
00.2.3.E.01

200

200
300 300

300 300
MU-3 STF 200x200

100
MU-4 MU-7
MU-5

200
3030
MU-6
STF 100x300
1100

BW1

200
W01 N Makkah
200 1165 1165 200

1310

1310
STF 100x300 STF 100x200

100
STF 100x200 100 100
-0.400
290
200

STF 200x200 -0.400 S.S.L BW7


BW1
S.S.L STF 200x200 BW1
3150

3150
MALE TOILET STORE Contractor:
STAFF
K'

500
00.2.6.C.10
2550

2150

2550
2450

2450

2450
BW1 00.2.3.F.03

1000
FEMALE BW7 CLEANERS RM.

300
SUB-WAITING TOILET STAFF 00.2.3.B.05
00.2.3.F.02 3900 200
00.2.3.B.06 BW7 STF 100x200

A2 A2
200
100

100
365 1100 300 1100 365
STF 100x365 STF 100x300
3230
-0.100 STF 100x365
5
S.S.L 21004

Executive Architect / AOR


BW2
ENERGY CENTER BUILDING

5500

5500

7000
PO BOX 2474,
AL KHOBAR 31952
TEL: 00966 13 894 3981
STAFF MEETING RM.
LOUNGE 00.2.3.F.04 WWW.HAMDANCONSULT.COM
STRESS TEST 00.2.3.F.01
CARDIAC 00.2.3.D.10
ASSESSMENT -
ECG/US Signature Architect
00.2.3.D.09
EMAAR BUSINESS PARK,
1ST FLOOR, BUILDING #3,
UNIT #103/104, DUBAI 77890,
BW7 UNITED ARAB EMIRATES
-0.100
STF 100x200 606 300 WWW.STUDIOI.AE
BW1 BW1 BW1 S.S.L BW1
BW1
3300 500 7800 500 5894

775
800
940 200 1100 200 860 1620 200 1100 200 2980 200 1100 400 3400 200 1100 200 994 200 General Notes
L'
1. Do not scale drawings. Dimensions govern.
W01 W01 W01 2. All dimensions are in millimetres unless noted otherwise.
W01
3. All levels are in metres unless noted otherwise.
STF 200x200 STF 200x200 STF 200x200 STF 200x200 STF 200x200 STF 200x400 STF 200x200 STF 200x200 STF 200x400 4. All dimensions shall be verified on site before proceeding with the work.
BW1 STF 200x200
5. SIEC Shall be notified in writing of any discrepancies.
BW1 6. Any areas indicated on this sheet are approximate and indicative only.

MU-8 Project:

AMAALA STAFF VILLAGE


HOSPITAL

Drawing Title

Ground Floor Blockwork Partitions


Plan Zone 4 part 3

Model File Reference

1SV10110-110C14-ASA-HJ-ZZ-MOD-AR-10000

Drawn By Checked By Approved By

01-SHT-GROUND FLOOR PARTIAL PLAN - ZONE 04 - PART 03 M.M Y.J F.H


1 1 : 50
Project No Issue Date Scale at ISO A0
1SV10110-110C14 18.09.2024 AS INDICATED
Drawing Number Revision
1SV10110-110C14-ASA-HJ-GF-SDW-AR-11012 C0
Markup Summary Sheet Total Comments: 13 Downloaded by Malik Ali on 13 Feb 2025 06:38

Document Number Project


1SV10110-110C14-ASA-HJ-GF-SDW-AR-11012 SV-Staff Vlg Wide

Revision Version Document Title


C0 4 110C14_ASA Ground Floor Blockwork
Partitions Plan Zone 4 Part 3

ID Type Comments

MU-1 Stamp No Comment

- Mr Hassan Elgamal on 22 Sep 2024 12:56 GMT+3

MU-2 Stamp No Comment

- Mr Hassan Elgamal on 22 Sep 2024 12:56 GMT+3

Page 2
MU-3 Line No Comment

- Mr Hassan Elgamal on 22 Sep 2024 12:21 GMT+3

MU-4 Line No Comment

- Mr Hassan Elgamal on 22 Sep 2024 12:21 GMT+3

MU-5 Line No Comment

- Mr Hassan Elgamal on 22 Sep 2024 12:21 GMT+3

MU-6 Rectangle No Comment

- Mr Hassan Elgamal on 22 Sep 2024 12:21 GMT+3

MU-7 Line No Comment

- Mr Hassan Elgamal on 22 Sep 2024 12:21 GMT+3

MU-8 Stamp No Comment

- Mr Hassan Elgamal on 22 Sep 2024 12:17 GMT+3

MU-9 Line No Comment

- Mr Hassan Elgamal on 22 Sep 2024 12:17 GMT+3

MU-10 Line No Comment

- Mr Hassan Elgamal on 22 Sep 2024 12:17 GMT+3

MU-11 Callout -Diagonal Dimension Required for each room.

- Mr Hassan Elgamal on 22 Sep 2024 14:26 GMT+3

MU-12 Line No Comment

- Mr Hassan Elgamal on 22 Sep 2024 14:26 GMT+3

MU-13 Line No Comment


- Mr Hassan Elgamal on 22 Sep 2024 14:25 GMT+3