GROUP 2 SITE SAFETY INSPECTION USING HIRAC WORKSHOP
1. Hazard Identification 2. Risk Analysis 3. Risk Control
Safety Hazards Identified Harm or Possible Effects PR SR RR Proposed Control Measure Due Date or Timeline
EC:
AC:
PPE:
EC:
AC:
PPE:
EC:
AC:
PPE:
EC:
AC:
PPE:
Health Hazards Identified Harm or Possible Effects PR SR RR Proposed Control Measure Due Date or Timeline
EC:
AC:
PPE:
EC:
AC:
PPE:
EC:
AC:
PPE:
EC:
AC:
PPE:
EC:
AC:
PPE: