Field Clarification/Change Request (FCCR) Flowchart: Ce, Sup, CM Originator
Field Clarification/Change Request (FCCR) Flowchart: Ce, Sup, CM Originator
CE, SUP, CM
ORIGINATOR
RE DC
Disposition Distributes
RE and provide as per
Resolve to DC for distribution
at Site YES logging and form
distribution
NO
RE give to
DC for
distribution
& disposition
by Bothell
Engineering
DC
Distributes
to Bothell for
Disposition
EMAL
Review and
signature
Engineering
disposition
and returns
to field via
DC NO YES
RE DC
RE Complete Distribute
DC Reviews AM dist form, and upload
Distributes answer. If YES NO return to DC to SPF
to RE for accept, give EMAL for
review and to AM for Review distribution
distribution review. If not required
accept, return