Project Listing
Project Listing
Commissioning of system
Air quality testing and safety general testing
Trail and testing
Compressors ,dryers delivery at plant
installation of dryers and compressors
LP
piping from compressor to dryer and existing lines
IN and OUT header work
BOILER
Maintenance Parts demanded
Maintenance Parts receiving
Maintenance job
New Boiler selection Package type or chain grate
Technical specification finalization
PO issuance
Site preparation Foundations and connections
Deilvery at site
Installation and commissioning
Start up trial test
RO PLANT
Plant at khi port
Clearance and shipment to lahore
Contractor finalization by aquamatch
Contractor site visit and pre installation planning
Piping from raw water tank to RO room main
(included in main boq)
Piping from RO to main product tanks
70+100m3(included in main boq)
Product water header shifting
Ozone tank tank 10m3 installation and its piping
conopy work for tank
RO Plant placement
Carbon tanks installation
Linkage of current tanks 35+35m3 as UF product
RO Operational
Line 3,4 piping work
Air comp HP BOQ and drawing Finalized
Air comp LP BOQ and drawing Finalized
Ammonia Comp BOQ and drawing Finalized
CO2 BOQ and drawing Finalized
Syrup BOQ and drawing Finalized
CIP BOQ and drawing Finalized
RO Plant BOQ and drawing Finalized
CO2 Filter inter connection
CO2 evaporator inter connection
CO2 Tank installation
Steam line inter
connection syrup
room
Line 3 placement Line 3 off loading + placement on designated location.
Need to finalize with with khs pakistan
25th oct
25th oct
26th october
12th nov
14th nov
14th nov
21st oct
7th nov
5th dec
5th dec
Need to install valves and inter
3rd week connection with existing system ,
january Required in december 4th week,Shut
down work
End Feb
Mid Feb
Mid Feb
Mid november
4th week
december
25th oct
7th nov
20th oct
23rd nov
30th
december
28th
december
30th
december
31st december
shutdown required will do after final
Electrical Project Update
Sr# Work Detail Progress
1 LV/HV Panels In Production ,panel structure maufactured
2 AVR (2000 + 3500 KVA) 2000 KVA ready to deliver
3 Transformers 3500 KVA In production phase
4 LV/MV Civil Work In progress
5 UPS (500 + 600) KVA Order done
6 Old UPS Shifting to Husky Will be execute after arrival of new UPS
7 Cable trays LT to ups 3 ordering in process
8 Cable trays LT to ups 4
9 Cable trays LT to gensets ordering in process
10 Cable trays LT to utilities ordering in process
11 Cable trays HT to LT ordering in process
12 Earthing of line , gensets, panels ordering in process
13 Line Lighting Quotation awaiting
14 Cable laying HT to transformer Order placed. Delivery after transformer delivery
Order placed. Delivery after power house panels
15 Cable laying Genset to LT delivery
16 Cable laying LT to UPS line Order placed. Delivery after UPS delivery
10 Dec,2024
25 Dec,2024
18 Dec,2024
15 Dec,2024
25 Nov,2024
10 Dec,2024
24 Nov,2024 Off load testing will be done
20 Nov,2024
30 Nov,2024
10 Nov,2024
15 Nov,2024
30 Dec,2024
6 Dec,2024
25 Nov,2024
15 Jan,2025
10 Nov,2024
8 Dec,2024
Projects overview
Sr# Area Custodian Work Detail
1 Admin Manager Residency 15Rooms
Supervisor Residency 8Rooms handed over, 5 Rooms
2 Admin
pending
Phase 1 4Rooms ground floor ready by all means
Phase 2 4Rooms ground floor ready by all means
Admin Labor colony 24 Phase 3 8Rooms 1st floor ready by all means
3
Rooms
Phase 4 8Rooms 2nd floor ready by all means
Phase 5 General finishing overall building
Phase 1 1st Floor slab
Phase 2 2nd Floor slab
Admin Executive Building Phase 3 Ground floor finishing
4
10 Rooms
Phase 4 1st floor finishing and general overall finishing
30th december
rs move here
# Of
TASK REMARKS Order status
Task
35 AVR & PFI Parts Existing AVR and PFI Order Done
Electrical Installation
38 (Cables trays and earthing, Line 3 and 4 In process
Lighting)
44 Punjab Food Authority Approval required for Cans Storm, Lemon Zero
Izhar Shed Project Steel
45 New Order Done
Structure
46 Izhar Shed Civil work New Order Done
53
54
55
56
57
Shipping Department
First Kick-OFF 14-06-2024
E & I working on it
Offer received, Technical approval requried work with idress from Dubai
work in process
Technical approved
Shipping Department
Project start: Tue, 4/8/2025
Display week: 1
Apr 7, 2025 Apr 14, 2025 Apr 21, 2025
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Days
M T W T F S S M T W T F S S M T W
elivery hold
For line 4
Genset received
elivery hold
livery Hold
aterial received
Steam Master
Apr 21, 2025 Apr 28, 2025 May 5, 2025 May 12, 2025
24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
T F S S M T W T F S S M T W T F S S M T W T F
ay 12, 2025 May 19, 2025 May 26, 2025
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1
S S M T W T F S S M T W T F S S
Step-1 Step-2
Shipping Take The D.O Deptt: Then Approve After Validate , Shipping
Printout Of D.O-3 Copies The D.O & Generate The Save , Prepare & Validate
|Loading , Accounts & Invoice The S.I.N
Maingate
Step-13
Step-14
Step-16
Step-1 Step-2
NOW-CURRENT
Mapping + Transporter
Booking Of Sales Order Call With Token number Vehicle Came To Factor
For Enter The Vehicle In With Token number fo
Factory system entry.
Vehicle Came to
Submit The Bilty At Gate Weighbridge For Tare Bilty Submit To Shipping
For Entry Process Weight And Issue The On His Respective
Token Number & I.G.P Number
r Validate , Shipping Save - Prepare & Validate The D,O Department Check & Scan The Bilty & Sen
, Prepare & Validate S.O From D.O Office Confirm The Payment The D.O Office
S.I.N Status Of Customer
Step-17
Step-9 Step-8
Step-6
Step-7
Work In Process as
1 Weight Scale Activation 15-Oct-24
explained in Civil Works
Order Placement in
3 Low mast Lifter Purchase 15-Nov-24
Process
Palletized CC, Palletizer FB and Manual To be Discussed (Review
4 15-Oct-24
Loading Percentage Mix Dates)
Visibility established
through tracking system
Efficiency in Organized Vehicle Operation &
6 30-Sep-24
Loading time
(Benchmarking of each
activity)
Three Sizeable
Transporter Addition
(Frontier, Tayyab, Al
Transportation Evaluation
7 Haider) Aug Completed, 30-Oct-24
(Sizeable Transporter Induction)
5 to 6 more addition with
elimination of middle
man transporters
Discussion is in Process
Done
In process
In Process
In Process
Done
System Time(0:11hr)
0:11
based on following cash clear
conditions stock available
Loading Time (1:36hr) Loading time need to minimize. Loading Benchmark less than 1hr
Gross weight (0:27hr) Need improvement
System Document
Waiting Loading
SIN DO Gross
Delivery Note MTR Note SIN Note time Complete Gate Out
Approved Approved Weight
(Loading) d
0:33 0:08 0:16 0:07 0:13 8:51 1:57 0:22 0:01
1:11 1:06 0:13 0:03 0:39 5:38 2:05 0:40 0:00
0:22 0:06 0:56 0:05 0:09 3:18 2:05 0:28 0:03
0:15 0:09 0:16 0:03 0:08 1:11 0:38 0:08 0:00
0:35 0:22 0:25 0:04 0:17 4:44 1:41 0:24 0:01
1:44
0:11
*Bilty Check
* Licence Check/ Fitness certificate Check
* Physical Inspection
* Under Age Labor Check
Time : 00:02
Block # 2
Post-System's Check
* Transporter Name
* Vehicle Number
* Destination
* Issuance Of Token Number
Time : 00:03
Block # 3
Parking
* Parking
* Vehicle Parked at Designated Area
* Capacity : 70 Vehicle -Total
Driver Submitted the Bilty + Token Slip
Shipping will collet Bilty + Token Slip on Hourly basis
Block # 4
Entry Check Point
* Receive call from shipping for Vehicle Entry
* Security Guard Call Vehicle on Speaker
* Check The vehicle Number & Allow For Entry For
Weighment Process
Time: 00:03
Block # 5
* Weighment at weighbridge
* Tare Weight
Time: 00:03
Time :
20 ft manual : 01: 45
20 ft Palletized : 00:10
40 ft Palletized : 00:20
40 ft Closed Container : 00:20
40 ft Closed Container-Manual Loading: 03:00
Tarpaulin Covering :
20 ft manual : 00:15
20 ft Palletized : 00:15
40 ft Palletized : 00:20
40 ft Closed Container : 00:00
40 ft Closed Container-Manual Loading: 00:00
Loading Bays
Block # 6
* Vehicle Parked at Designated Loading Bay * 40ft Flat Bed =4
* Start Loading As Per Document * 40ft Closed Conatiner =8
* Final Check After Loading * 20ft Manual Bedford-Ma
* Documents Handedover To Driver
* Vehicle Moved From Loading Bay To Waiting Queue
for Covering the Stock with Tarpaulin.
Gate
Block # 8
* Vehicle Check at Gate
* Documents Check
* Tarpaulin Check
* Allowed For Exit
Conclusion :
Discussion Points
1 Palletized percentage decision
2 Manual loading percentage decision.
3 Karachi loading number per day.
4 Tarpal covering through platform bay
5 Vehicle Booking time is 1:15Hrs, need to review.
6 System documents(DN,SIN Note, SIN App, DO Approved) take 1.44hrs for 1 vehicle. Need to r
7 Loading Time 1.41hrs, Need to review.
8 Gross weight 24min. Need to review.
* 40ft Flat Bed =4
* 40ft Closed Conatiner =8
* 20ft Manual Bedford-Mazda= 14
Time
Vehicle Check : 00:02
Warehouse
Cases % transfer capacity
194,727.27 31.86%