RCA LVL 2 PFC 2000 Steelastic
RCA LVL 2 PFC 2000 Steelastic
Documento # CORP-2233
Fecha efectiva 11/29/2017
Revision 2
Document Owner Harmon, Timothy P.
Paso 2. Conduce analisis 2. Herramienta de analisis 5-Why basic Cause Map to get started
Notas:
LA FALLA DEL MODULO DE PRESION DE LA MAQUINA STEELASTIC NO.3 DISPARO ESTE ANALISIS DE SEGUNDO NIVEL LOS DIAS 2,3,4 DE MAYO DEL 2018 POR EL TIEMPO DE LA CORRECCION
DE FALLA EN EL LAZO DE CONTROL.
RCA LEVEL 2 WORKFLOW
Close Charter
5-why Team/ 5-why not Send to R.E. for Elevate to Team Create Charter Action Item Create Action
MRT lead resolved review Level 2 RCA meeting/Fault and send to BB Meeting Items in ETQ
completes RCA Tree Provide Complete
updates in MRT action items/
meeting Close RCA
Return to 5-
why team if
additional work
needed
Problem Solving • Incident Investigation • Root Cause Analysis • Risk Mitigation Additional Tools - Use as needed to capture specific information during the investigation.
Problem
Step 1 Define the Problem in the Problem Outline Timeline
Date Time Description
Diagram
Use the drawing tools to add any diagram to this work sheet. Example objects
Photos Process Map Decision point
Copy and use as needed
Notes
Delete these objects if they are not needed. (industrial) Insert any pictures on this worksheet. Steps within a Task
Drum
Step 1. Define el problema Cylinder
YES
AND
- Write the impact to that Goal in the next box. Any information gathering or support tasks
AND
required for the investigation.
- Answer the question "Why did that happen?" Ask Why again. Im pact to
Production
Goal
AND
Step 3 4
Solutions
Step 3
Propose Evaluate Create Each action item is a project.
Follow-up should evaluate effectiveness.
Possible Solutions Solution Options Action Plan
Identify the specific actions that will be taken to reduce the risk Based on causes identified in the analysis
Consider the Effort IN to the Solution Corrective Actions to be implemented
of a similar issue occurring. versus the Result OUT Since solutions control specific causes, every action item (solution) should correspond to a cause from the Cause Map. This provides continuity from the analysis to the action items.
step Only those causes with action items (solutions) are listed in this table.
should be 2
be implemented.
9
10
3
Project Charter - General Instructions: CCT Chenshan China
¥ CNY
CKT Kunshan China
¥ CNY V Lookup
Step 4
Cells for Project Champion to fill in. Cells for CPI, MBB's, BB's, GB's, Project Leads, or Finance to fill in. MS
Clarksdale $ USD Table
Findlay OH $ USD (to the
left)
- Worksheet/form is dynamic. Based on cell choices, form may change. Melksham UK £ GBP
- comments. <----cells like this provide comments or information. Mickey Thompson
$ USD
OH
Charter
Note:
- Access limited to input cells only. Worksheet is Read-Only. Re-name to save. Occidente Mexico
$ MXN Must be
- Print area set and formatted to fit on one page. Serbia RSD in
Shanghai Corp Of
¥ fCNY
ices alphabetic
Foreign currency (Mexico, UK, China, Serbia) - Financial Worksheet will convert amounts al order
Texarkana A R $ USD
to US dollars based on conversion rate entered.
Tupelo MS $ USD
Process Owner:
Assigned to a:
MBB, BB, GB, or YB
Finance Partner:
FP List Link
Master Black Belt:
Project Champion: Project Start Date:
Target Close Date:
Project Type:
Entered into PMAC? Yes or No
- Fill out CTLSS completely Opportunity Statement 1 Simply State your improvement opportunity (or pain) in one sentence.
Define Unit: 2 Units of measure for #3 (lbs, minutes, errors, tires, etc).
Define Metric: 3 What quantity can be measured that relates to your pain or customer requirement that is not being met? (must have units
Define Condition: 4 Describe the current state in terms of the defined metric (#3: What is the baseline?).
Project Objective: 5 Reduce or Improve (metric: #3) from (current state: #4) to (final value: metric target) by (date: target close date).
Upper Boundary (Start of
Process):
6 What starting point in the process will you be considering?
PROJECTED SAVINGS/BENEFITS
Hard Savings Soft Savings
OTHER SAVINGS Category Category WACC
Briefly Describe the expected project benefits. Include relevant calculations and explanations. Describe both the operational impact and the
Capital
financial impact from moving the primary metric (#6 above) from the baseline level to the target level per the objective. Sales 10.5%
Avoidance
Work.Cap
Material . 10.5%
Reduction
Cost
Labor N/A
Avoidance
Throughp
Scrap N/A
ut
Other - 1 Other - 1 10.5%
Other - 2 Other - 2 10.5%
Other - 3 Other - 3 10.5%
Hard Soft
Savings Savings
TOTAL
WA CC = Weighted A verage Cost of Capital
PROJECT
CONFIDENTIA L COMPETITIV E COMMERCIA L INFORMA TION: A ccess limited to authorized personnel. Copyright © Unpublished.
Step 1. Define el problema
no se tiene una
forma de se genero instructivo de revision de
evaluar el lazo de control y calibracion de
funcionamiento verificar el perfecto montaje al raz seguidor de presion de maquinas
entrada o salida de
de la salida y la del orificio que hace contacto con steelastic
control de seguidor
entrada de la camara de presion
de presion dañada
control del
seguidor de
presion
Verification
Owner(s) Status-
No. Action Item Cause Date Due Notes (Check of
(Names) Completed
effectiveness)
investigar configuracion de
cableado de control de sensor no se tiene el pinout para la
2 agregarla al instrutivo de debida revision del cableado Ruben diaz June 13, 2018 100%
revicion y calibracion de lazo del sensor
de control
5
6
7
8
9
10
Doc #: OPEX-004
CTLSS PROJECT CHARTER APPROVAL FORM Issue Date: 7/18/15
Replaces: 6/10/2015
Opportunity
There is an opportunity to reduce steelastics downtime by reducing the time to check calibrate and restart operation in case of
Statement
1 presure loop failure
time
Define Unit: 2
Currently we have some events that takes more than 24 hours to repair presure control loop
Define Condition: 4
Upper Boundary
Extruder head is not controlling presure
(Start of Process):
6
Lower Boundary
Extrusion re starts correctly
(End of Process):
7
Historical
8
Comments:
Constraints: 9
Target
Entitlement
Stretch
Conversion Rate:
$ MXN to $ USD
PROJECTED SAVINGS/BENEFITS
CONFIDENTIAL COMPETITIVE COMMERCIAL INFORMATION: Access limited to authorized personnel. Copyright © Unpublished.
The controlled version of this document is electronically maintained.
Timeline
event # Date Time Description
1 5/2/2018 24 hrs la maquina no controla la presion de extrusion del cablesillo
2 5/3/2018 24 hrs la maquina no controla la presion de extrusion del cablesillo se esta
trabajando en velocidad lenta
3 5/4/2018 24 hrs la maquina no controla la presion de extrusion del cablesillo se esta
trabajando en velocidad lenta
Diagram
Use the drawing tools to add any diagram to this worksheet. Example objects
Delete these objects if they are not needed. (industrial)
Cylinder Drum
Pump
Valve
Exchanger
Expander,
Compressor
Turbine
el sensor no esta montado de forma adecuada en ocaciones el area de contacto debe estar al raz de la pared de la camara de
presion como se muestra en la fotografia, debido a la vibracion natural del equipo se afloja y permea hule al interior generando
fallas en la medicion.
se saco la configuracion del cableado de control del seguidor de presion para ayudar al
diagnostico certero en caso de tener daño en cableados.
YES
Process
NO
Notas finales
Operadores:
- Los operadores comentan las fallas en los controles de presion les ocacionan mucho desperdicio y aveves tardan varias
intervenciones en corregir de raiz
Mantenimiento:
- comenta mantenimiento que este problema es que los controles de presion no llegan bien reparados por parte del almacen
ATS :
ats mostro un reporte en el cual se descarta como principal problema las fallas en la reparacion de los modulos y se detectan
oportunidades de capacitacion al personal de mantenimiento en el cual los equipos reparados se regresaron a almacen con fallas de
puntos de calibracion perdidos.
Investigation Action List
No. Action Item Owner Fecha inicio Fecha limite Estado Completado
1 investigar falta configuracion de cableado de sensor de presion DYNISCO r diaz 1-Jun-2018 1-Jun-2018 completado
realizar instructivo de calibracion y revision de componentes de lazo de
2 r diaz 1-Jun-2018 1-Jun-2018 completado
control de presion
Drawing Tools
To access the drawing tools ribbon you first must select (click on) an object, such as a text box, on the worksheet. Notice when you select an object a
new tab, Drawing Tools: Format, is immediately added to the end of the menu bar. When you click on either Format or Drawing Tools the ribbon
changes to a drawing tools ribbon. Remember you must have an object selected on the worksheet to access the Drawing Tools tab.
Moving Boxes
To move a box click on directly on the border, hold down the left mouse button and drag the box to the desired location. The box can also be moved
by clicking directly on the border and using the arrows on the keyboard to move the box up, down, left or right.
Copying Boxes
Left click directly on the border, hold the mouse down and drag the box to the desired location. Before releasing the left mouse button hold down
the Ctrl button on the keyboard. This is known as the Ctrl-Drag copy method.
Using Connectors
Use connectors to connect an object to another object. The connectors are located in the Insert tab in the Shapes drop-down menu. Click on the
Elbow Arrow Connector (the 5th item in the "Basics Shapes" section) to select.
Connect two objects by clicking and holding the left mouse button at the beginning connection point and then moving the cursor to the ending
connection point then releasing the mouse. The connector end is red when it is connected to a box and blue when it is not connected. The blue end
can be dragged to an object.
To insert multiple connectors, right click on the Elbow Arrow Connector icon from the Shapes drop-down menu and select Lock Drawing Mode. Left
click on the connector icon or press "Esc" to unlock.
Add to the Quick Access Toolbar – The Elbow Arrow Connector can be added to the Quick Access Toolbar by right clicking anywhere on the Quick
Access Toolbar. Click on Customize Quick Access Toolbar to open a new window. From the vertical menu on the left side of the window click on
Customize. Click the drop down at the top of the window labeled Choose Commands From and select All Commands. Use the scroll bar to move
down the alphabetical list to the Elbow Arrow Connector. Click on that connector then click the Add button in between the two columns. Click OK to
exit the window.
Aligning Boxes
Boxes can be aligned by moving them using the mouse or the arrows on the keyboard . Boxes can also be aligned by selecting two or more boxes
using the shift key and clicking on the Drawing Toolbar. From the fourth group (Arrange), click on the Align drop-down menu. You can align objects
horizontally to the left, center, or right, and vertically to the top, middle, or bottom. Align uses the extreme edge of the selected boxes for the
chosen alignment. Note: only use the shift key to select and align the boxes. Using the arrow cursor to select boxes and connectors will disconnect
the connectors from the boxes.
If you have a wheel on your mouse, you can also zoom by holding the Ctrl key down as the wheel is moved forward or backward. The wheel on the
mouse can be set to zoom rather than scroll by right clicking anywhere on the Quick Access Toolbar. Select Customize Quick Access Toolbar. Click
Advanced from the vertical menu on the left side of the window that opens. The first section inside of Advanced is called Editing Options. The eighth
choice down is Zoom on roll with IntelliMouse. Check this box and hit OK at the bottom of the window.
CTLLS link: http://incoopernew/sites/QualityOpEx/CTLSS/Pages
Example of Failure Analysis Tools:
Fault Tree
Cause & Effect
Fishbone
FMEA
CTLSS/Pages/default.aspx