The document is a Bill of Quantities for a construction project, detailing various items of work including excavation, concrete laying, and installation of materials. It specifies the quantities, unit rates, and total amounts for each item, totaling approximately INR 15,938,705.98. The document is intended for the Dharoi Irrigation Sub Division and outlines the financial aspects of the tender process.

Uploaded by

nakshnarayan00
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views6 pages

BOQ Kukadiya

The document is a Bill of Quantities for a construction project, detailing various items of work including excavation, concrete laying, and installation of materials. It specifies the quantities, unit rates, and total amounts for each item, totaling approximately INR 15,938,705.98. The document is intended for the Dharoi Irrigation Sub Division and outlines the financial aspects of the tender process.

Uploaded by

nakshnarayan00
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

BILL OF QUANTITIES

(A) Percentage Rate Tender (Upto INR 50Cr.)


Item Description of Item (with brief specification and reference to book of Quantity
No specifications)
1 Item No.1 Care and diversion of river including required dewatering during 1
construction of weir and allied
works as prescribed and directed etc. complete.
2 Item No.2 Excavation for foundation in all sorts of soil including yellow sandy 1274.000
gravelly soils ,soft & hard murrum etc. in dry condition including depositing the
excavated stuff in uniform layers in banks or as and where directed etc.
complete for lead upto 500 m and all lift. (BY MACHINERY)
b) Including dewatering.
3 Item No.3 Excavation for foundation in Soft Rock including depositing the excavated 2548.000
stuff as and where directed etc.
complete for lead upto 500 m and all lift. (Machinery) b) Including dewatering.
Item No.4 Excavation for foundation in Hard Rock including blasting and
chiseling if necessary sorting out and
stacking seperately the usable rubble, depositing the excavated stuff as and
4 directed including back filling trenches with suitable excavated stuff etc. complete 425.000
for lead upto 500 m. and all lifts. (Machinery) Including dewatering

5 Item No.5 Providing & Laying in position "NOMINAL MIX" cement concrete 456.000
using cement, sand and crushed aggregate by mass and machine mix for
C.C./R.C.C work incl. necessary formworks centering, scaffolding, compaction
by vibrator, curing as directed with all lead & lift etc complete Without Dewatering
and excluding cost of
steel reinforcement. (a) C. C. Nominal Mix, M-10 and MSA-40 mm

Item No.6 Providing & Laying in position cement concrete M15 (MSA 40) using
cement, sand and machine crushed
6 coarse aggregate including necessary formwork, compaction, finishing and 1889.000
curing as required etc. completed for checkdam. (With mobile batching) .

Item No.7 Providing and fixing 2.30 m long TMT steel anchor bars of 16
mm dia by drilling 35 mm dia hole in
fouandation including necessary cutting, bending, hoisting bars and grouting the
7 144.000
holes with cement slurry etc. complete (1.0 mt. to be inserted below excavated
level) as directed.

8 Item No.8 Providing & Placing in position reinforcement bars including 27.720
cutting, bending, welding joints where
necessary, hooking etc. complete as per drawing for all lead and lifts.TMT
9 Item No.9 Back filling the foundation trenches around the structures etc with 357.000
selected excavated stuff including
watering, ramming, compacting etc. complete. (By Machinery)
10 Item No.10 providing and laying dry rubble for apron having minimum dimension 576.000
of 300 mm and weight not less
than 40 kg including packing filling interstice with quarry sparry etc.complete

Item No.11 Providing and laying dry rubble pitching of various thickness to
11 required grade including trimming of 263.000
earth work, hand packing the interstices with spauls, filling earth in interstices
pannelling complete for all leads and lifts.450 mm thick.
12 Item No.12 Providing and laying graded filter of specified materials in 108.000
uniform layer as per design incl. Watering
etc.complete as directed .
13 Item No.13 Providing and laying in position 110 mm dia (6 kgf/sqcm) P.V.C. Pipe 70.000
for weep holes with non corroding
jali in abutments, wing walls, retaining walls etc. complete.

14 Item No.14 Providing and fixing in position P.V.C. heavy duty water stops in barrels, 48.000
troughs and wing walls with 25 mm wide expansion joint as shown in drawing
including filling the joints with asphalt pad or bitumen cork board of approved
quality. (Asphalt pad or bitumen cork board will be paid seperatly) 300mmWIDE
P.V.C. WATER STOP

15 Item No.15 Providing and fixing in position pre-moulded asphalt or bitumen cork 36.000
board of approved quality and
specifications as per design and drawing.25 mm thickness

Item No. 16 Providing and supplying mechnically double twisted highly galvanized
with (PVC) Polyvinyl Chloride coating gabions made of mesh size 10 x 12 cm woven
wire (3.00mm dia), tying with lacing wire of dia 2.2mm, as per ASTM A975-97, size
16 of gabion, including providing and laying stones in the gabions and arranging them in 720.000
a required manner in the section or such other structure with arranging in required
layer thickness and arranging gabions , with the crane if required (if required as per
drawings or as directed ) with all material , labour , tools, lead and lift etc.
Item No.17 Providing and laying Non Woven Geo Fabric Filter (weight more than
17 235 gm/Sq.m) over the excavated surface as per specification including stitching with 300.000
overlap to design profile as directed in tidal range etc. complete.
18 Item No.18 Providing and fixing marble plate of 2.54 cm thick including engraving 36.000
and filling led for letters as
directed.
Total Amoun

Dharoi Irrigation S

100
2
1
0
0
0
3

97
0

5
10

1
0
16
15.52
Unit Rate In Amount Rs Zero Zero Queted Rate Queted
figures Rate Amount Amount
LS 200000.00 200000.00 160000 160000 196367.20668 196367.20668

Cum 107.80 137337.20 80 101920 98.183603338 125085.91065

Cum 249.20 634961.60 180 458640 220.91310751 562886.59794

250 106250 306.82376043 130400.09818

Cum 382.90 162732.50

Cum 3346.00 1525776.00 2800 1276800 3436.4261168 1567010.3093

3200 6044800 3927.3441335 7418753.0682

Cum 3936.00 7435104.00

500 72000 613.64752086 88365.243004

No 692.90 99777.60

MT 82019.00 2273566.68 60000 1663200 73637.702504 2041237.1134

Cum 36.90 13173.30 20 7140 24.545900835 8762.8865979

Cum 852.00 490752.00 1000 576000 1227.2950417 706921.94404

600 157800 736.37702504 193667.15758


Sq.m. 617.50 162402.50
Cum 1943.60 209908.80 1250 135000 1534.1188022 165684.83063

Rmt 262.50 18375.00 180 12600 220.91310751 15463.917526

Rmt 634.50 30456.00 580 27840 711.8311242 34167.893962

Sq.m. 1508.90 54320.40 1200 43200 1472.7540501 53019.145803

2500 1800000 3068.2376043 2209131.0751

No 3417.00 2460240.00

60 18000 73.637702504 22091.310751


Sq.m. 86.40 25920.00

100 108.40 3902.40 100 3600 122.72950417 4418.2621502


Sq.cm
Total Amount Rs 15938705.98 Zero 12664790 Queted amount 15543433.972
Amount
Deputy Executive Engineer -2.47995043618
Dharoi Irrigation Sub Division
Idar

bill amt
TDS
LC
Royalty
vahivat
GST

main cont.
Chq. Amt.
Main cont.
royalty
bill vahivat

profit
supervision
cost/indirect
cost

tds

81.48
1.23