PAINTING INSPECTION REPORT
REPORT NO. DATE:
CLIENT:
PROJECT:
W.O.No. PROCEDURE NO.
SURFACE PREPARATION
ENVIRONMENTAL CONDITIONS :
SA2-1/2 SA 3 S/BLAST
SURFACE PRIMER ABRASIVES USED:
DESCRIPTIO
PREPN. 1st COAT IInd III rd COAT FINAL GARNET / SAND / GRIT
N
COAT COAT
DATE MANUFACTURER : ALLEUARD
TIME IN HRS SIZE:
AMB / METAL SURFACE
TEMP *C INTERNAL / EXTERNAL
DRY / WET CHLORIDE CONTAMINATION
BULB CHECKED :
TEMP.*C
DEW POINT PROFILE :
TEMP *C
RELATIVE (IN MICRONS)
HUMIDITY ٪
SIGNATURE SIGNATURE
PAINT APPLICATION
INTERNAL EXTERNAL NO OF COATS TOTAL REQD DFT : MICRONS
REQD DFT COLOUR COATIN BATCH THINNER REQD DFT MEASURED DFT
COAT NO (IN G NO IF IF APPL (IN (IN MICRONS)
MICRONS) PRODUCT APPL MICRONS) AVG. AVG.
CUMULATIVE
(MIN) (MAX)
PRIMER
Ist COAT
II nd COAT
III rd COAT
FINAL COAT
REMARKS: MEASURED DFT Min & Max Micron
DRAWING
NO.
EQUIPMENT:
QTY:
QC ENGINEER CLIEN TP
T I
NAME:
SIGNATURE:
DATE: