Ar-T1-820-Ramp Detail 01
Ar-T1-820-Ramp Detail 01
1
1
GHE
T1-Q AR-T1-820 T1-R T1-S T1-Q T1-R T1-S
AR-T1-820
4200 4200 4200 4200
+ 5320 + 5320
3 S.S.L S.S.L 6
AR-T1-912
AR-T1-912 CONSULTANT ENGINEER
PARKING ARM BARRIER
7.5%
MANAMA I KINGDOM OF BAHRAIN I LIC.NO.EPP/BN/105
7.5%
T1-B-013
TEL +973 17 822666 I FAX +973 17 820666 I www.ghe.com.bh
15.0%
15.0%
T1-10
3000
1000
B
RAMP DOWN FROM GROUND RAMP UP TO GROUND
ISO 9001, ISO 14001 and ISO 45001
T1-9
PROJECT
+ 5095 + 5095
1000
450 3300 600 3300 450 S.S.L S.S.L
8100
T1-8 T1-11
FLOOR TO RECEIVE ONE COAT OF CLEAR
ACRYLIC SEALER, GLASS FLAKE, MEDIUM
AGGREGATE AND TWO COATS OF HIGH
PERFORMANCE OF UV STABLE
POLYURETHANE
BALANCE KINGDOM OF BAHRAIN
TANK &
UP PUMP
OWNER
C ROOM
FLOOR TO RECEIVE ONE COAT OF
T1-G-022
CLEAR ACRYLIC SEALER, GLASS
FLAKE, MEDIUM AGGREGATE AND
TWO COATS OF HIGH PERFORMANCE
RAMP
T1-B-014
+ 6250
OF UV STABLE POLYURETHANE
EAGLE HILLS
F.F.L
SUB CONSULTANTS
+ 3025 + 3025
7500
STAIR 2
7500
S.S.L S.S.L
T1-G-020
D
15.0%
7.5%
7.5%
15.0%
NOTE
1. THIS DRAWING IS THE PROPERTY OF :
GULF HOUSE ENGINEERING, Architects, Engineers
2. REPRODUCING ITS CONTENTS IN ANY FORM EXCEPT FOR THE
PURPOSE OF WHICH IT IS INTENDED, IS PROHIBITED.
RAIN WATER TRENCH 3. THIS DRAWING IS NOT TO BE SCALED, STATED DIMENSIONS ARE
REFER TO MEP DRAWINGS ONLY TO BE CONSIDERED.
+ 2800 + 2800 IRRIGATION DOWN TO BASEMENT UP FROM BASEMENT 4. ALL DIMENSIONS ARE TO BE VERIFIED ON SITE AS PER ACTUAL SITE
S.S.L S.S.L PUMP
E ROOM 3300 600 3300 450
CONDITION PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION WORK.
T1-G-021 5. ANY DISCREPANCIES IN DIMENSIONS & OR INFORMATION SHOULD BE
BROUGHT TO THE ATTENTION OF THE CONSULTANT IN WRITING.
1000
AR-T1-912 T1-B-001 S.S.L/F.F.L CONDITIONS OF CONTRACT, etc.
1000
1 : 50
ISSUE / REVISION
F PARKING ARM BARRIER T1-8
FLOOR TO RECEIVE ONE COAT OF
CLEAR ACRYLIC SEALER, GLASS
FLAKE, MEDIUM AGGREGATE AND IRRIGATION
TWO COATS OF HIGH PERFORMANCE TANK
OF UV STABLE POLYURETHANE T1-G-061
RAIN WATER TRENCH
REFER TO MEP DRAWINGS
KEY PLAN
NOR
TH
+ 7600
T.O.P
RAIN WATER TRENCH
REFER TO MEP DRAWINGS END POINT OF 15% SLOPE
END POINT OF 7.5% SLOPE START POINT OF 7.5% SLOPE SHEET TITLE
1500
GROUND FLOOR LEVEL
FFL +6250
MARASSI TERRACES 1
I 3 Plot 135
AR-T1-912 250
RAMP DETAIL 01
+ 5320
S.S.L 7.5%
150
2865
+ 5095
S.S.L START POINT OF
RAMP 15% SLOPE ISSUE FOR
T1-B-014
END POINT OF 7.5% CONCEPT SCHEMATIC MUNICIPAL
EXPOSED AGGREGATE SLOPE
CONCRETE
3450
DOMESTIC FIRE & 3 PROJECT NO. BH21-R049 SCALE 1:50 ON A1 SHEET SIZE
WATER DOMESTIC AR-T1-912
TANK
J T1-B-013
WATER DRAWN BY CHECKED BY APPROVED BY DESIGNED BY
TANK
T1-B-013 + 3025 M.S. A.O. A.A. A.BUCHEERY
BASEMENT FLOOR LEVEL S.S.L 7.5% + 2800
FFL +2800 S.S.L
ISSUE DATE SHEET NO REV