DAILY PROGRESS REPORT-04-09-2023
(MECHANICAL MAINTENANCE)
This document is the property of Sigma Powertech Limited. Any kind of plagiarism in whole or partially is
not allowed without any written consent
Description: Document ref.: Issue date: 04-09-2023
Work Report
Revision Status: 00 Effective date:
Ref. ISO Prepared by: Md Razib Shekh Reviewed by:
Mechanical Maintenance Representative Approved by:
1. Charge Air Filter duct pipe installation:
SG#03 A bank charge air duct pipe outer area faulty welding joint buffing done.
SG#03 A bank charge air duct pipe outer area faulty welding joint re-welded.
SG#03 B bank charge air duct pipe outer area faulty welding joint buffing is in progress.
2. Exhaust duct pipe elbow fabrication:
SG#01 silencer side one support shoe aligned with duct pipe.
SG#01 silencer side one support shoe primary welding done.
SG#01 exhaust duct pipe inner area welding joint buffing is in progress.
One 45 degree elbow fabrication for SG#03 exhaust duct pipe is in progress.
Description: Document ref.: Issue date: 04-09-2023
Work Report
Revision Status: 00 Effective date:
Ref. ISO Prepared by: Md Razib Shekh Reviewed by:
Mechanical Maintenance Representative Approved by:
3. Exhaust duct pipe modification & installation:
SG#04 exhaust duct pipe modification is in progress.
One 45 degree elbow primarily welded with silencer side short pipe.
One tail pipe placed over SG#02 exhaust duct pipe support.
Tail pipe aligned with SG#02 exhaust duct pipe.
SG#02 exhaust duct pipe & tail pipe primary welding is in progress.
4. Engine Auxiliary module stair fabrication:
SG#03 engine auxiliary module stair fabrication is in progress.
Angle bar cutting done for stair platform fabrication.
04 nos. metal plate cutting done for platform leg fabrication.
C-channels welded & one platform making done.
Engine Auxiliary module stair final welding is in progress.
Description: Document ref.: Issue date: 04-09-2023
Work Report
Revision Status: 00 Effective date:
Ref. ISO Prepared by: Md Razib Shekh Reviewed by:
Mechanical Maintenance Representative Approved by:
5. Engine to Radiator cooling water pipe connection fabrication:
SG#01, 02 & 03 engine to radiator cooling water pipeline fabrication is in progress.
03 nos. 6 inch pipe cutting done.
All pipe end side grinded as V shape.
06 nos. 6 inch elbow both end side grinded as V shape.
02 nos.6 inch pipe & elbow final welding done.
06 nos. 6 inch pipe & elbow primary welding done.
06 nos. pipes placed over pipe support.
04 nos. 3 inch pipe shifted to radiator area.