100MW PV Solar Grid Connected System - Project - VC1-Report
100MW PV Solar Grid Connected System - Project - VC1-Report
PVsyst TRIAL
PVsyst - Simulation report
Grid-Connected System
PVsyst TRIAL
100MW Solar PV Project - Pakistan
PVsyst TRIAL
PVsyst TRIAL
Author
PVsyst TRIAL
Project: 100MW PV Solar Grid Connected System
Variant: 1st Simulation variant
PVsyst V8.0.8
VC1, Simulation date:
22/03/25 20:29
with V8.0.8
PVsyst TRIAL
Geographical Site
100MW Solar PV Project
Pakistan
Situation
Latitude
Longitude
Altitude
Time zone
Project summary
25.08 °(N)
67.95 °(E)
59 m
UTC+5
Project settings
Albedo 0.20
Weather data
100MW Solar PV Project
Meteonorm 8.2 (1996-2015), Sat=100% - Synthetic
System summary
Grid-Connected System Sheds on ground
PVsyst TRIAL
Simulation for year no 10
System information
PV Array Inverters
Nb. of modules 186560 units Nb. of units 44 units
Pnom total 108.2 MWp Total power 88000 kWac
Pnom ratio 1.23
Results summary
Produced Energy 177.58 GWh/year Specific production 1641 kWh/kWp/year Perf. Ratio PR 79.07 %
PVsyst TRIAL
Project and results summary
General parameters, PV Array Characteristics, System losses
Near shading definition - Iso-shadings diagram
Main results
Loss diagram
Table of contents
2
3
5
6
7
Predef. graphs 8
Single-line diagram 9
PVsyst TRIAL
PVsyst TRIAL
22/03/25 PVsyst Evaluation mode Page 2/9
Project: 100MW PV Solar Grid Connected System
Variant: 1st Simulation variant
PVsyst V8.0.8
VC1, Simulation date:
22/03/25 20:29
with V8.0.8
PVsyst TRIAL
Grid-Connected System
Orientation #1
Fixed plane
Tilt/Azimuth 28 / 22.4 °
General parameters
Sheds on ground
Sheds configuration
Nb. of sheds
Identical arrays
1820 units
Sizes
Sheds spacing
Collector width
10.00
2.29
m
m
Shading limit angle Average GCR 22.9 %
Limit profile angle 7.7 ° Top inactive band 0.02 m
Bottom inactive band 0.02 m
PVsyst TRIAL
Circumsolar separate
User's needs
Unlimited load (grid)
PV Array Characteristics
PV module Inverter
Manufacturer Generic Manufacturer Generic
Model STP-580-S-C72-Nsh Model SG2000
(Original PVsyst database) (Original PVsyst database)
Unit Nom. Power 580 Wp Unit Nom. Power 2000 kWac
Number of PV modules 186560 units Number of inverters 44 units
Nominal (STC) 108.2 MWp Total power 88000 kWac
Modules 11660 string x 16 In series Operating voltage 460-850 V
PVsyst TRIAL
At operating cond. (50°C) Pnom ratio (DC:AC) 1.23
Pmpp 100.1 MWp Power sharing within this inverter
U mpp 628 V
I mpp 159253 A
Array losses
Array Soiling Losses Thermal Loss factor DC wiring losses
Loss Fraction 2.0 % Module temperature according to irradiance Global array res. 0.065 mΩ
Uc (const) 29.0 W/m²K Loss Fraction 1.5 % at STC
PVsyst TRIAL
Uv (wind) 0.0 W/m²K/m/s
PVsyst TRIAL
22/03/25 PVsyst Evaluation mode Page 3/9
Project: 100MW PV Solar Grid Connected System
Variant: 1st Simulation variant
PVsyst V8.0.8
VC1, Simulation date:
22/03/25 20:29
with V8.0.8
PVsyst TRIAL
IAM loss factor
Incidence effect (IAM): Fresnel smooth glass, n = 1.526
0°
1.000
30°
0.998
50°
0.981
60°
0.948
Array losses
70°
0.862
75°
0.776
80°
0.636
85°
0.402
90°
0.000
Spectral correction
FirstSolar model
Precipitable water estimated from relative humidity
Coefficient Set C0 C1 C2 C3 C4 C5
Monocrystalline Si 0.85914 -0.02088 -0.0058853 0.12029 0.026814 -0.001781
PVsyst TRIAL
Unavailability of the system
Time fraction 1.0 %
3.7 days,
System losses
Auxiliaries loss
3 periods
AC wiring losses
Inv. output line up to injection point
Inverter voltage 315 Vac tri
Loss Fraction 0.00 % at STC
PVsyst TRIAL
Inverter: SG2000
Wire section (44 Inv.) Copper 44 x 3 x 4000 mm²
Average wires length 0m
PVsyst TRIAL
PVsyst TRIAL
22/03/25 PVsyst Evaluation mode Page 4/9
Project: 100MW PV Solar Grid Connected System
Variant: 1st Simulation variant
PVsyst V8.0.8
VC1, Simulation date:
22/03/25 20:29
with V8.0.8
PVsyst TRIAL
Iso-shadings diagram
Orientation #1 - Fixed plane, Tilts/azimuths: 28°/ 22.4°
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
22/03/25 PVsyst Evaluation mode Page 5/9
Project: 100MW PV Solar Grid Connected System
Variant: 1st Simulation variant
PVsyst V8.0.8
VC1, Simulation date:
22/03/25 20:29
with V8.0.8
PVsyst TRIAL
System Production
Produced Energy 177.58 GWh/year
Main results
Specific production
Perf. Ratio PR
1641 kWh/kWp/year
79.07 %
PVsyst TRIAL
Balances and main results
PVsyst TRIAL
March 179.7 71.1 26.33 198.2 187.8 17.30 17.10 0.797
April 197.1 81.4 29.53 197.3 186.3 16.94 16.73 0.784
May 213.3 95.8 32.10 197.6 185.5 16.82 15.90 0.744
June 189.5 106.0 32.18 170.6 159.4 14.55 14.38 0.779
July 154.9 103.2 31.10 142.3 132.6 12.20 12.05 0.783
August 146.9 99.0 29.64 141.1 131.9 12.20 12.04 0.789
September 164.0 80.1 29.20 171.3 161.4 14.90 14.72 0.794
October 156.4 67.4 28.97 182.9 173.2 15.97 15.28 0.772
November 128.1 49.2 24.00 165.9 157.4 14.83 13.97 0.778
December 117.0 43.4 19.38 160.4 152.7 14.61 14.43 0.832
Year 1916.1 884.9 26.81 2075.4 1958.7 181.68 177.58 0.791
Legends
PVsyst TRIAL
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_Grid Energy injected into grid
T_Amb Ambient Temperature PR Performance Ratio
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings
PVsyst TRIAL
22/03/25 PVsyst Evaluation mode Page 6/9
Project: 100MW PV Solar Grid Connected System
Variant: 1st Simulation variant
PVsyst V8.0.8
VC1, Simulation date:
22/03/25 20:29
with V8.0.8
+8.3%
-1.5%
Global horizontal irradiation
Global incident in coll. plane
PVsyst TRIAL
211.95 GWh Array nominal energy (at STC effic.)
PVsyst TRIAL
181.68 GWh Array virtual energy at MPP
-1.2% Inverter Loss during operation (efficiency)
0.0% Inverter Loss over nominal inv. power
0.0% Inverter Loss due to max. input current
0.0% Inverter Loss over nominal inv. voltage
0.0% Inverter Loss due to power threshold
0.0% Inverter Loss due to voltage threshold
179.48 GWh Available Energy at Inverter Output
PVsyst TRIAL
177.58 GWh Energy injected into grid
PVsyst TRIAL
22/03/25 PVsyst Evaluation mode Page 7/9
Project: 100MW PV Solar Grid Connected System
Variant: 1st Simulation variant
PVsyst V8.0.8
VC1, Simulation date:
22/03/25 20:29
with V8.0.8
PVsyst TRIAL
PVsyst TRIAL
System Output Power Distribution
PVsyst TRIAL
PVsyst TRIAL
22/03/25 PVsyst Evaluation mode Page 8/9
PVsyst V8.0.8
VC1, Simulation date:
22/03/25 20:29
with V8.0.8
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL