0% found this document useful (0 votes)
62 views9 pages

MLA Priority 6.1.02025 Una

The document outlines the status of MLA's priority schemes in the Una constituency from 2014-15 to 2023-24, detailing the number of schemes, their feasibility, and funding sources. It includes specific irrigation and water supply projects, their approval status, and expenditure percentages. Overall, it highlights a total of 42 schemes with various stages of completion and funding requirements.

Uploaded by

himjsv
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
62 views9 pages

MLA Priority 6.1.02025 Una

The document outlines the status of MLA's priority schemes in the Una constituency from 2014-15 to 2023-24, detailing the number of schemes, their feasibility, and funding sources. It includes specific irrigation and water supply projects, their approval status, and expenditure percentages. Overall, it highlights a total of 42 schemes with various stages of completion and funding requirements.

Uploaded by

himjsv
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 9

MAIN ABSTRACT OF MLA'S PRIORITY SCHEMES 2014-15 TO 2023-24

Sr. No. District Constituency. Year Total No. of Specific No of Schemes Net DPR to be No of DPR Scheme approved No of No of Remarks
Schemes Priority Infeasible Not Required Duplicate Total prepared prepared NABARD AIBP/ Others DPR DPR yet to
awaited from NRDWP under prepared
MLA process

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Irrigation, FPW & Sewerage Schemes
2014-15
1 Una Una to 21 0 0 8 0 8 13 9 4 0 0 5 4
2024-25
Total 21 0 0 8 0 8 13 9 4 0 0 5 4

Water Supply

2014-15
1 Una Una to 21 0 0 7 1 8 13 8 5 0 0 4 4
2024-25

Total 21 0 0 7 1 8 13 9 5 0 0 4 4

Total IRRIGATION+ WSS 42 0 0 15 1 16 26 18 9 0 0 9 8

Executive Engineer
JS Division No.1 Una
ABSTRACT OF MLA'S PRIORITY SCHEMES 2014-15 TO 2023-24
Sr. No. District Constituency Year Total No. Specific No of Schemes Net DPR No of Scheme approved No of No of Remarks
of Priority Infeasible Not Duplicate Total to be DPR NABARD AIBP/ Others DPR DPR yet to
Schemes awaited Required prepared prepared NRDWP under prepared
from process
MLA

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
(A) Irrigation, FPW & Sewerage Schemes
UNA CONSTITUENCY
1 Una Una 2014-15 2 0 0 0 0 0 2 2 2 0 0 0 0
2 Una Una 2015-16 2 0 0 0 0 0 2 2 1 0 0 1 0
3 Una Una 2016-17 2 0 0 0 0 0 2 2 1 0 0 1 0
4 Una Una 2017-18 3 0 0 0 0 0 3 2 0 0 0 2 1
5 Una Una 2018-19 2 0 0 2 0 2 0 0 0 0 0 0 0
6 Una Una 2019-20 2 0 0 2 0 2 0 0 0 0 0 0 0
7 Una Una 2020-21 2 0 0 2 0 2 0 0 0 0 0 0 0
8 Una Una 2021-22 2 0 0 1 0 1 1 1 0 0 0 1 0
9 Una Una 2022-23 1 0 0 0 0 0 1 0 0 0 0 0 1
10 Una Una 2023-24 2 0 0 1 0 1 1 0 0 0 0 0 1
11 Una Una 2024-25 1 0 0 0 0 0 1 0 0 0 0 0 1
Total 21 0 0 8 0 8 13 9 4 0 0 5 4
(B) Water Supply
UNA CONSTITUENCY
1 Una Una 2014-15 2 0 0 0 0 0 2 2 2 0 0 0 0
2 Una Una 2015-16 2 0 0 0 0 0 2 2 2 0 0 0 0
3 Una Una 2016-17 2 0 0 1 0 1 1 1 0 0 0 1 0
4 Una Una 2017-18 1 0 0 0 0 0 1 1 1 0 0 0 0
5 Una Una 2018-19 2 0 0 2 0 2 0 0 0 0 0 0 0
6 Una Una 2019-20 2 0 0 1 0 1 1 1 0 0 0 1 0
7 Una Una 2020-21 2 0 0 1 0 1 1 0 0 0 0 0 1
8 Una Una 2021-22 2 0 0 2 0 2 0 0 0 0 0 0 0
9 Una Una 2022-23 3 0 0 0 1 1 2 1 0 0 0 1 1
10 Una Una 2023-24 2 0 0 0 0 0 2 1 0 0 0 1 1
11 Una Una 2024-25 1 0 0 0 0 0 1 0 0 0 0 0 1
Total 21 0 0 7 1 8 13 9 5 0 0 4 4
Total Irrig+WSS 42 0 0 15 1 16 26 18 9 0 0 9 8
STATUS OF MLA'S PRIORITY SCHEMES 2014-15 TO 2023-24 IN RESPECT OF CIRCLE UNA.
S.N Name of Scheme Specify Amount of sanction (in lacs) A/A & E/S No. & Amount. Expdt. %age If not Remarks, if any
o. RIDF Nabard AIBP/ Others Incurre Physical Approved yet
Tranch/ PMKSY/ d up progress then Status
AIBP/ NRDWP/ 30.11.20 of DPR
NRDWP/ JJM/ other 23
Others & GOI
Year of Programm
Sanction. e.

1 2 3 4 5 6 7 8 9 10 11
S.N Name of Scheme Specify Amount of sanction (in lacs) A/A & E/S No. & Amount. Expdt. %age If not Remarks, if any
o. RIDF Nabard AIBP/ Others Incurre Physical Approved yet
Tranch/ PMKSY/ d up progress then Status
AIBP/ NRDWP/ 30.11.20 of DPR
NRDWP/ JJM/ other 23
Others & GOI
Year of Programm
Sanction. e.

UNA CONSTITUENCY
2014-2015
A Irrigation Schemes.
1 C/O LIS to village Khanpur, Behdala, Raipur Sahoran (Tobba), Raipur near Una RIDF 229.91 - Principal Secretary (IPH) to the 155.88 100% Approved Scheme completed & PCR submitted
Railway Station, Dehlan Shokran & Sasan. XXIII Govt. of Himachal Pradesh
Shimla Letter No. IPH-B-(C)12-
3/2015 Shimla dated 28.09.2017.

2 C/O LIS to village Bharolian Khurd, Malahat, Jankour, Nangran & Arniala Upper. Una RIDF 181.76 - Principal Secretary (IPH) to the 152.37 100% Approved Scheme completed & PCR submitted
XXIII Govt. of Himachal Pradesh
Shimla Letter No. IPH-B-(C)12-
3/2015 Shimla dated 28.09.2017.

B Water supply schemes.


1 Providing separate water supply scheme to newly settled abadi of village Lal Singhi Una RIDF 129.77 - Secretary (IPH) letter No. IPH-B- 174.66 100% Approved Scheme completed & PCR submitted
and on Una Takka Road. XXII (C)12-3/2016 Shimla dated
24.10.2016. for Rs 129.77 Lacs

2 Providing water supply scheme to village Kuthar Kallan and Sunehra, Una RIDF 188.2 - Secretary (IPH) to the Govt. of 188.20 100% Approved Scheme completed & Commissioned.
Augmentation of WSS Santoshgarh Town. XXII Himachal Pradesh Shimla Letter
No. IPH-B-(C)12-3/2016 Shimla
dated 04.08.2016.

2015-16
A Irrigation Schemes.

1 Improvement of T/well Upper Arniala, Kuthar Khurd, Sunehra and Arniala Lower RIDF XXIII 108.16 - - Principal Secretary (IPH) to the 108.16 100% Approved Work completed and PCR submitted
in Tehsil Una. Govt. of Himachal Pradesh
Shimla Letter No. IPH-B-(C)12-
3/2015 Shimla dated 28.09.2017.

2 Extension, Remodelling and Modernization of Lift Irrigation Project of Bhabhour - - - - - - - Submitted DPR Received back with observation vide SE P&I-II Shimla letter
Sahib Phase-I & II in Tehsil Una. No.IPH P&I-II –EE-(M) –RIDF –XXIV /2018-19 5061-64 dated
11.12019 that Una Constituency has balance of Rs.45.13 crore to
exhaust the posing limit of Rs.90.00 crore as Twenty three DPRS
amounting to Rs.44.87 crore have already been posed only for
NABARD funding during the period from 2014-15 to till date.
Keeping in view the above facts, now the DPR was prepared under
PMKSY and submitted to E-in-C Shimla vide CE (H/Z) letter No
2941-43 CE(H/Z)-WS-WA-1(DPR)/ 2019-20 dated 26.06.2019 for
amounting to Rs.4922 lakh only. The DPR received back with
observations to enhance per hect development cost Rs. 2.5 lakh to Rs.
4.0 lakh vide E-in-C Shimla letter No. 3703-23 dated 20-12-2021 and
the DPR submitted to CWC Shimla vide Engineer-in-Chief Jalshakti
Vibhag Shimla for Rs.8980.11 lakh

B Water supply schemes.


1 Providing separate water supply scheme for Malookpur, Jalgran and Behdala in RIDF XXIII 127.93 - - Principal Secretary (IPH) to the 125.48 100% Approved Work completed and PCR submitted
Tehsil Una Govt. of Himachal Pradesh
Shimla Letter No. IPH-B-(C)12-
3/2015 Shimla dated 28.09.2017.
S.N Name of Scheme Specify Amount of sanction (in lacs) A/A & E/S No. & Amount. Expdt. %age If not Remarks, if any
o. RIDF Nabard AIBP/ Others Incurre Physical Approved yet
Tranch/ PMKSY/ d up progress then Status
AIBP/ NRDWP/ 30.11.20 of DPR
NRDWP/ JJM/ other 23
Others & GOI
Year of Programm
Sanction. e.

2 Providing separate water supply scheme to District Hospital Una and its Residential RIDF XXIII 139.74 - - Principal Secretary (IPH) to the 148.75 100% Approved Scheme completed. And PCR Submitted
Colony, Separate WSS to Vill. Kuthar Khurd and Separate WSS to vill. Barsara in Govt. of Himachal Pradesh
Tehsil Una Shimla Letter No. IPH-B-(C)12-
3/2015 Shimla dated 28.09.2017.

2016-17
A Irrigation Schemes.
1 C/O LIS Jhudowal & C/O LIS against defunct T/well Rampur near Gas agency in RIDF XXIV 96.20 - Secy (IPH) letter No.IPH - 62.11 92% Approved Scheme completed. And PCR Submitted
Tehsil & District Una B( F)5-13/2018 dated 7/09/2018
for Rs. 96.20 lakhs.

2 Automation of existing Irrigation Schemes in Una Constitency. Una - - - - - - Submitted. DPR amounting to Rs. 230.36 Lakh sent to ACS(Planing) vide SE ,
P&I-II IPH Letter No. 40-44 dated 04.04.2018.Reply of clarification
(Hon'ble MLA consent) has been submitted to SE, P&I-II Shimla
vide SE IPH circle Una letter No. IPHU-WA-II-DPR/2018-19- 2986-
88 dated 19.06.2018 and received back with observations vide
Superintending Engineer J.S. circle Una endst No. 7527-30 dated 14-
B Water supply schemes.
1 C/O water supply Scheme for Upper & Lower Arniala in Tehsil & District Una. - - - - - - - Not required Scheme appeared for the year 2023-24 2nd prority and DPR Under
prearation.

2 C/O Water supply scheme to village Rakker and Chattra in Tehsil & District Una. - - - - - - - Submitted DPR amounting to Rs. 98.77 Lakh resubmited to ACS (Planning
vide SE P&I) -II letter No. 1503-10 dated 7/7/2017 after clarification

2017-18
A Irrigation Schemes.
1 C/O irrigation scheme for village Dehlan ,Improvement of irrigation scheme - Yet to be DPR under preparation and will be submitted by 2/2024.
Bharolian Khurd and Arniala prepared.
2 CAD to various scheme under sub division No 1Una in Una constituency - Submitted DPR amounting to Rs.435.71 Lakh sent to E-in-C Shimla to CE
(H/Z) letter No- CE(H/Z)-WS-WA-1(DPR)/ 2018-19-14099-
14101dated 14-12-2018
3 CAD to various scheme under sub division Mehatpur in Una constituency - Submitted DPR amounting to Rs.399.87 Lakh sent to E-in-C Shimla to CE
(H/Z) letter No- CE(H/Z)-WS-WA-1(DPR)/ 2018-19-14096-98 dated
14-12-2018
Total:- 0.00 0.00
B Water supply schemes.
1 Providing separate WSS to village Chhattarpur Dhada. RIDF XXVII 107.09 - - Secretary (JS) letter No. IPH- 72.73 70% Approved Work in Progress.
B(F)5-13/2018-I loose dated 2-8-
2021.
Total:- 107.09 72.73
S.N Name of Scheme Specify Amount of sanction (in lacs) A/A & E/S No. & Amount. Expdt. %age If not Remarks, if any
o. RIDF Nabard AIBP/ Others Incurre Physical Approved yet
Tranch/ PMKSY/ d up progress then Status
AIBP/ NRDWP/ 30.11.20 of DPR
NRDWP/ JJM/ other 23
Others & GOI
Year of Programm
Sanction. e.

2018-19
A Irrigation Schemes.
1 C/O T/Well at Dehlan Lower & Mehatpur Basdehra in Distt. Una (HP) - Not reqd. These villages covered under LIP Bhaour Sahib and DPR for
Extension, Remodelling and Modernization of Lift Irrigation Project
of Bhabhour Sahib Phase-I & II subbmitted to CWC as per 2nd.
prority for the year 2015-16 . Hence DPR not required.

2 C/O T/Well at Sunehra (Rakkar) & Re C/O of T/Well No. 3 at Upper Arniala in - Not reqd. DPR for 25 Nos T/well has been submitted to Engineer-in-Chief JSV
distt. Una (HP) Shimla vide CE (H/Z) Hamirpur letter No.16145-47 dated 4.12.2021
for Rs. 1755.22 lakh only and these T/Wells have been included in
the DPR. Hence DPR not required

Total:- 0.00 0.00


B Water supply schemes.
1 C/O WSS to village Jhodowal, Raipur Bare in distt. Una (HP) - - - 89.25 By DC Una letter No. PLG- 89.25 100% Not reqd. 100% work completed for separate WSS to vill. Pekhubella &
UNA(Deposite work-CSR)2018- Jhudowal which has been executed under IOCL Pekhubella Deposit
19/1310-11 Dated 14-01-2019 through DC Una and For Raipur Bare has been approved under
amounting to Rs.89.25 lakh additional water supply shall be supplimented from existing water
supply scheme Raipur Sohran. Hence DPR not required.

2 Improvement of WSS Raipur & Nangran in distt. Una (HP) (Imp.of WSS Raipur). - Not reqd. Scope of Work covered under Various Heads .Hence DPR not
required.
Total:- 0.00 89.25 89.25
2019-20
A Irrigation Schemes.
1 C/O of 2 Nos T/well in Lal Singhi Village &1 No T/well in - Not reqd. T/Well lal Singhi 1&II included in the DPR for C/O 10 Nos. T/Wells
Bhadolian ,Basdehra,Kutiya in Raipur Village and replacement of T/Well No. 24 at as per MLA proriy 2nd for the year for the year 2021-22 and The
Charatgarh village Area of remaining villages covered under LIP Bhaour Sahib and DPR
for Extension, Remodelling and Modernization of Lift Irrigation
Project of Bhabhour Sahib Phase-I & II subbmitted to CWC as per
2nd. prority for the year 2015-16 .

2 Replacement of R/main and Pumping machinery for Minor Irrigation Schemes in - Not reqd. Scope covered under various heads. Hence DPR not required
Una Constituency
Total:- 0.00 0.00
B Water supply schemes.
1 Providing separate WSS under Rural water Supply Scheme for Una Constituency - submitted DPR resubmitted to CE (HZ) Hamirpur vide SE JS Circle Una vide
( ward No.4 chander Lok and Shelja Vihar colony, Bharolian Khud under Malhat letter No. 3091-92 dated 09.05.2023 for Rs. 218.97 lakh after
village,Village Beenewal,Poona, Majara and New Abadi setteled near RTO barrier attending the observations. DPR re- submitted to Additonal Chief
Mehatpur) Secretary (Planning) to GoHP vide SE (P&I)-II Shimla letter No.
745-51 dated 08.06.2023 for Rs. 230.93 lakh. And

2 Repalcememnt of Rising main and Pumping machinery of different Water Supply - Not Required. The R/mains & P/Machinery of various WSS Scheme have been
Schemes under Una constituency replaced under DC deposit JJM . Hence DPR not required.
Total:- 0.00 0.00
S.N Name of Scheme Specify Amount of sanction (in lacs) A/A & E/S No. & Amount. Expdt. %age If not Remarks, if any
o. RIDF Nabard AIBP/ Others Incurre Physical Approved yet
Tranch/ PMKSY/ d up progress then Status
AIBP/ NRDWP/ 30.11.20 of DPR
NRDWP/ JJM/ other 23
Others & GOI
Year of Programm
Sanction. e.

2020-21
A Irrigation Schemes.
1 C/O I No. T/well (LIS) in village Abada Barana , Re[placement of 2 Nos defunct Not required Area Covered under HIMCAD. Hence DPR Not required.
irrigation Scheme, LIS Nangran and LIS Jankour in District. Una 0
2 C/O I No. T/well (LIS) in village fatehpur in Una Sadar Constituency. Not required The Area of remaining villages covered under LIP Bhaour Sahib and
DPR for Extension, Remodelling and Modernization of Lift
Irrigation Project of Bhabhour Sahib Phase-I & II subbmitted to CWC
as per 2nd. prority for the year 2015-16 .
Total:- 0.00 0.00
B Water supply schemes.
1 Providing separate WSS for village Arniala Lower &Arniala Upper in Una Sadar Not reqd. Scope covered under approved Jal Jeevan Mission schemes.
constituency
2 Improvement of WSS for left out area of Mehatpur Town and village Jakhera in DPR Yet to The Plan Proposal will be submitted by 12/2023.
Una Sadar constituency be prepared
Total:- 0.00 0.00
2021-22
A Irrigation Schemes.
1 Restoration and Renovation of Old existing Pump Houses and Improvement of Not required Scope of Work Covered under HIMCAD. Hence DPR not required .
Distribution system of various irrigation schemes under Una constituency in Tehsil
and District Una.
2 C/o 10 Nos Tubewell in left out area in Una constituency at village Lal Singi-I, DPR DPR Submitted to the Chief Engineer (HZ) vide this office letter
Lalsingi-II, Sunehra-I, Sunehra-II, Nangran lower, Khanpur, Jattpur-I, Jattpur-II, Submitted No. 7615-17 dated 28.07.2023 Amounting to Rs. 782.71 Lakh only.
Jalgran and Charatgarh in Tehsil and District Una.
Total:- 0.00 0.00
B Water supply schemes.
1 Providing separate WSS to village Bharolian khurd in Malahat Panchayat and Not reqd. Village Bharolian Khurd and Malahat covered under the scheme
improvement of LWSS basoli and Mehatpur Basdehra in teghsil and Distt. Una and namely Pdg. Multi villages piped water supply scheme for Una
providing new WSS schemes and replacement and renovation of WSS distribution constituency in Una block under Jal Jeevan Mission. The technical
system in leftout approval of this scheme has been accorded vide CE (H/Z) Hamirpur
letter No. 3623-28 dated 27.5.2021 amounting to Rs. 938.34 lakh and
the wk is in progress. For LWSS Basoli, funds for drilling of source
i.e.7" dia tubewell has been received under PMKKKY (Pradhan
Mantri Khanij Kshetra Kalyan Yojna) and T/well has been drilled, the
balance components will be executed and existing scheme of Basoli
village will get adequate quantity of water. For Mehatpur Basdehra a
scheme i.e. "Providing Separate Water supply scheme to village
Mehatpur and Jakhera" has been approved under RIDF-XX and work
is in progress.
S.N Name of Scheme Specify Amount of sanction (in lacs) A/A & E/S No. & Amount. Expdt. %age If not Remarks, if any
o. RIDF Nabard AIBP/ Others Incurre Physical Approved yet
Tranch/ PMKSY/ d up progress then Status
AIBP/ NRDWP/ 30.11.20 of DPR
NRDWP/ JJM/ other 23
Others & GOI
Year of Programm
Sanction. e.

2 Providing new WSS for in various places of Una Constituency for those are Not reqd.
( especially urban area) which are not included in jal jeevan Mission In urban area of Una Town, following works has been executed
under the Schedule Caste Sub Plan :
1. Ward No.11 : 1 No. OHSR 2,50,000 ltrs cap has been constructed,
650 mtrs R/main 65mm dia has been laid and 7" dia tubewell has
been drilled.
2. Ward No. 10 : 1 No. OHSR 1,40,000 ltrs cap has been constructed,
625 mtrs R/main 80mm dia has been laid and 7" dia tubewell has
been drilled.
3. Ward No. 4 (Collage area): 1 No. OHSR 50,000 ltrs cap has been
constructed, 273 mtrs R/main 65mm dia has been laid and 7" dia
tubewell has been drilled.
4.Ward No.1 (Friends Colony area):1 No. OHSR 1,00,000 ltrs cap
has been constructed and 7" dia tubewell has been drilled.
Improvementg of tubewell No. 3 on old Hoshiarpur road, a new
tubewell has been drilled and 600mtr rising main 150mm dia GMS
pipe has been laid.
Distt. Zonal Hospital area in Una has been covered under the scheme
for Providing separate water supply scheme to District Hospital Una
and its Residential Colony which has been completed under Nabard.
In urban area of Santokhgarh Town, an estimate has been
technically approved vide SE JS circle Una letter No. 4675-76 dated
12-7-2021 for Rs. 134.96 lakh under RIDF-XXII and work is in
progress.
In urban area of Mehatpur Town, a scheme namely "Providing
Separate Water supply scheme to village Mehatpur and Jakhera" has
been approved under RIDF-XX and work is in progress. The plan
proposal for adjoining area of RTO barrier Mehatpur, has been
approved and DPR submitted to Additional Chief Secretary
(Planning) vide SE P&II Shimla letter No. 4746-52 dated 28.2.2022
for Rs. 182.26 lakh.
Total:- 0.00 0.00
2022-23
A Irrigation Schemes.
JS Division No-1 Una
Una Constituency
1 C/o Irrigation Tubewell at village Lower Arniala, Kuthar Khurd, Behdala DPR yet to be Scheme is under investigation. DPR will be submitted 03/2025.
Charatgarh and C/o various tubewells and New LIS schemes for left Out area in prepared
various villages in Una Sadar Constituency.

Total:- 0.00 0.00


B Water supply schemes.
1 Providing separate water supply scheme to village - - - - - - - Duplicate Scheme appeared in MLA prority 2nd. for the 2023-24.
Lower Arniala, Abada Barana in Una Sadar
Constituency
2 Providing Separate Water Supply scheme to village Basoli in Una Sadar - - - - - - - DPRYet to be DPR will be submitted by 03/2025
Constituency. prepared
3 Providing Sewerage scheme to Lower Arniala, Malahat, Rampur, Rakkar and - - - - - - - DPR DPR submitted to the Secretary (JSV) to the Govt . Of Himachal
adjoining area Submitted Pradesh vide SE (P&I)-II office letter No. 3332-39 dated 09.12.2022
for Rs. 5280.00 lakh.
Total:- 0.00 0.00
S.N Name of Scheme Specify Amount of sanction (in lacs) A/A & E/S No. & Amount. Expdt. %age If not Remarks, if any
o. RIDF Nabard AIBP/ Others Incurre Physical Approved yet
Tranch/ PMKSY/ d up progress then Status
AIBP/ NRDWP/ 30.11.20 of DPR
NRDWP/ JJM/ other 23
Others & GOI
Year of Programm
Sanction. e.

2023-24
A Irrigation Schemes.
1 C/o 13 Nos. Irrigation T/wells for villages Sunehra-1, Sunehra-2, Jankour, Abada - - - - - - - Yet to be Survey work is inprogress and DPR will be submitted by 03/2025
Barana, Charatgarh Lahr Mohalla, Lal Singhi-1, Lal Singhi-2, Basdehra, jatpur, prepared
Behdala Back side of Sunsihine Hotel, Pekhubela, Khuhi & Jhudowal in Tehsil &
Distt. Una
2 Extension, Renovation and Modernization of Medium Irrigation Project Bhaur - - - - - - - Not required Scheme appeared again. DPR for Extension, Remodelling and
Sahib under ERM in Tehsil & Distt. Una Modernization of Lift Irrigation Project of Bhabhour Sahib Phase-I &
II submitted to CWC as per 2nd. prority for the year 2015-16 .

Total:- 0.00 0.00


B Water supply schemes.
1 Providing separate WSS to 5 No. Villages Sanoli, Mazara, Malookpur, Poona and - - - - - - - Yet to be Schemes under investigation and DPR will be submitted by 3/2025.
Binewal in Tehsil & Distt. Una prepared.
2 Providing seperate WSS for Villages lower Arniala, Upper Arniala, Abada Brana & - - - - - - - Submitted DPR Submitted to General Manager NABARD Shimla by the E-in-C
Sunehra in Tehsil & Distt. Una (JSV) Shimla for an amounting to Rs. 5.24 Crores.
Total:- 0.00 0.00
2024-25
A Irrigation Schemes.
1 - - - - - - - Yet to be Schemes under investigation and DPR will be submitted by 3/2025.
Improvement of existing infrastructure like pump 0.25 prepared.
houses, boundary walls, pumping machinery and
distribution network etc. of various irrigation schemes
under Una constituency in Tehsil and Distt. Una(HP
B Water supply schemes.
2 Automation of existing Water Supply Schemes under 0.25 - - - - - - - Yet to be Schemes under investigation and DPR will be submitted by 3/2025.
Una constituency in Tehsil and Distt. Una (HP). prepared.

Executive Engineer