The Maharashtra Industrial Development Corporation has granted M/s SART INNOVATION PVT. LTD. approval for building plans on Plot No. G-122/3/2 in the Ahmednagar Industrial Area, subject to various conditions including obtaining additional approvals from relevant authorities and ensuring environmental compliance. The approved built-up area is 259.40 Sqm, and the commencement certificate is valid for one year from the date of issue. The document outlines specific requirements for construction, occupancy, and environmental management that must be adhered to by the plot holder.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views5 pages

CCLetter Attached Final

The Maharashtra Industrial Development Corporation has granted M/s SART INNOVATION PVT. LTD. approval for building plans on Plot No. G-122/3/2 in the Ahmednagar Industrial Area, subject to various conditions including obtaining additional approvals from relevant authorities and ensuring environmental compliance. The approved built-up area is 259.40 Sqm, and the commencement certificate is valid for one year from the date of issue. The document outlines specific requirements for construction, occupancy, and environmental management that must be adhered to by the plot holder.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

1

MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION


(A Government Of Maharashtra Undertaking)

No./ DE /ANR/Civil/ P217402 /2024,


Office Of the Deputy Engineer,
MIDC, Civil Sub-Division,
Ahmednagar. Ph. (0241) 2777970
Date: - 14 / 03 / 2024.
To,
M/s SART INNOVATION PVT. LTD.,
Plot No. G-122/3/2,
Ahmednagar Industrial Area.
Sub: - Ahmednagar Industrial Area….
Fresh Approval of building plans for Industrial Building on
Plot no. G-122/3/2 of G block.
Ref: - 1) Your letter No. SWC/53/521/966465 dated 21.02.2024
Dear Sir,
With reference to Architect / your application No. SWC/53/521/966465 Date
21.02.2024 for grant of sanction of commencement certificate to carry out
development work on the building permit under section A 45 of MR & TP
Act, 1966 to erect Industrial building for, M/s SART INNOVATION PVT.
LTD., of G block in Ahmednagar Industrial Area. The commencement
building permission is granted subject to the following conditions.

1) The land vacated in consequence of the enforcement of the set back rule
part of the public street.
2) No new building or part thereof shall be occupied or allowed to be occupied
for used or permitted to be used by the person until occupancy permission
has been granted.
3) The commencement certificate / building permit shall remain valid for period
of one year commencing from the date of its issue.
4) This permission does not entitle you to develop the land, which does not
vest in you.
5) Minimum two trees in plots having area of 200 sqm. And such number of
trees at the rate of one tree per 100 sqm. For plot more than 200 sqm in
area shall be planted and protected.
6) In case of group housing/minimum two trees per tenement shall be planted
and protected.
7) You have submitted building plans and drawings for 259.40 Sqm. With
ground coverage over plot area of 511.45 Sqm and at present this office has
approved building plans for 259.40 Sqm ground coverage submitted by you.
This office has approved building plans for 259.40 Sqm. of built up area on
all floors. This office has approved only 01No. of drawings, details of which
are attached in the accompanied statement.

In case of approval to the revised plans the original approval to the drawings
granted vides this office letter no. NIL Dated NIL from the office of the
Deputy Engineer, MIDC, Sub-Dn (C) Ahmednagar is treated as cancelled &
1
2
the drawing approved now superseded to the previously approved drawings.
You are requested to return the above cancelled drawings to this office for
records and cancellation.

8) As the drawings submitted are for the new structures which were not
approved previously, present approval along with the previously plans vide
letter No. DE /ANR / C / plan / dated by the office of the Deputy Engineer,
MIDC, Civil Sub Division, Ahmednagar to be treated as combined approval
for building.

10) The building plans need to be got approved from following authorities:

i) Department of Explosives of Government of Maharashtra.

ii) Factory Inspector Department of State Government.

You should submit the certified copies of the letter of approval in triplicate
from the above authorities to the Deputy Engineer–In-Charge before any
work is started.

11) For the sanitary block overhead water storage tank shall be provided for at
Least 900 Liters per WC and 180 Liters Per urinals.

12) Necessary approach road to the plot from the edge of MIDC road shall be
provided with a cross drainage work of RCC pipes in minimum of 600 mm.
dia or slab drain as may be approved by the Deputy Engineer, MIDC (C),
Sub-Dn. Ahmednagar. The surface water from plot should not enter on
MIDC road.

13) Temporary structures shall not be allowed except during construction period
(after obtaining prior approved from the Deputy Engineer, MIDC (C), Sub-
Dn. Ahmednagar) and the same shall be demolished immediately after the
completion of construction as per approved plan.

14) During the period of construction, stacking of the material shall be done only
in the area of plot allotted. In no case materials be stacked along MIDC’s
land, road, open space without approval from the Deputy Engineer, MIDC
(C), Sub-Dn. Ahmednagar.

15) The boundary marks demarcating the boundary of plot shall be properly pre-
served and kept in good conditions and shown to the Departmental staff as
and when required.

16) No tube well, bore well or the plot holders shall construct open dug well
without prior written permission from the competent authority.

17) The building plans for any future additional, alterations & extensions will
have to be got approved from this office as well as the department
competent to do so.
18) The present approval to the building plans does not pertain to the approval
to the structural designs & RCC members, foundations, etc. It is only
locational approval to the structures with reference to the plot for chemical &

2
3
pharmaceutical u nits separate approval to drainage plans shall be obtained
from this office as well as the department competent to do.

19) In case any power lines are passing through the plot, the plot holder should
approach to the M.S.E.B. & obtain a letter specifying the vertical & horizontal
clearances to be left & should plan the proposed structures accordingly.

20) Wherever a compound wall or fencing & gate is constructed the gate should
open inside the plot. If the plot is facing on two roads then the gate shall be
located, at least 9.0 mtr from the corner of junction of roads or as specified
by D.C. rules.

21) The waste effluent from the treatment work should be soaked in a soak pit if
sewer lines are not available in the area. In case if sewage system of MIDC
is functioning, effluent should be connected to drainage manhole after gating
the drawing approved. Storm water flow from rain water pipe is not to be
connected to MIDC sewerage system.

Further any waste effluent to be let out in MIDC’s sewerage system shall be
pre-treated to confirm to standards laid by Maharashtra Pollution Control
Board of Maharashtra Government after obtaining their consent under
section 25/26 of the Act.

22) Plot holder should make his own arrangements for 24 hours storage of
water by Constructing underground water storage tank of required capacity
as uninterrupted Water supply cannot be guaranteed by the department.

23) In case, if water streams are blowing through the plot allotted, the plot holder
has to ensure that the maximum quantity of rain water that flow at the point
of entry of stream be allowed to flow uninterrupted through the plot and the
point of out flow of the original stream. The detailed plans, sections &
designs for allowing minimum expected discharge of rain water through the
plot has to be furnished to this office & no work of filling of plot &diversions
of Nalla should be under taken.

24) Permission stands cancelled if no construction work is started within 12


months from the date of issue of this letter. The date of starting construction
work & date of completion should be informed to Deputy Engineer, MIDC
(C) Sub-Dn. Ahmednagar.

25) The breach of any of these stipulations shall tender the plot holder liable for
action as provided in MIDC act. 1961 (III) of 1962 & Regulations made there
under & also terms of these &schedule of penalties prescribed for by the
corporation for the purpose.

26) Department has got power to add amend or rescind any provision or
regulations from to time as it may deem fit & plot holder has to abide by the
rules & regulations.
27) As soon as the building work is completed the plot holder should approach
the Deputy Engineer, MIDC (C), Sub-Dn. Ahmednagar & got the work

3
4
verified & building should not be occupied unless completion certificate is
obtained from this office

28) This approval is subject to permission of competent authority under Urban


Land (Ceiling & Regulations) Act. (c) 1956.

29) On completion up to plinth level, party should invariably approach the


concerned Deputy Engineer, MIDC (C), Sub-Dn. Ahmednagar to check &
issue plinth-checking certificate. Any construction processed without plinth
checking will be illegal & will have to be removed.

30) The plot holders shall obtain prior Environment Clearance Certificate before
Commencement of any construction activities, if applicable to their project
as per the notification issued by MoEF, Govt. of India vide notification issued
by MoEF, New Delhi dtd. 14.09.2006 and its subsequent amendments.

31) If applicable subject to condition that The Hon. High Court, Aurangabad
order in respect of PIL No. 68/2013 filed in the subject matter will be binding
to the Licensees of the said plot and Licensees will have to abide by the final
decision of Ho. High Court, Aurangabad in this matter.

32) As per MIDC’s circular of Chief Fire Officer & Fire Advisor MIDC, Mumbai 93
A-04499 Dated 05/01/2015. You should provide one DCP Fire Extinguisher
(ABC Type) of minimum 5 kg capacity for 100 Sqmt of built up area .

33) As per MIDC Circular C-05579 Dated 21.06.2019 plot holder should
consume minimum FSI of 40% at the time of BCC. In this regards MIDC has
issued Circular wide no. D-86653 dated 27.11.2019 if plot holder had
obtained Occupancy Certificate prior 21.06.2019 and gone into production
then above circular is not applicable.

D.A.: One copies of


Building plan.
SANDEEP Digitally signed by
SANDEEP
SHESHRA SHESHRAO BADGE
Date: 2024.04.03
O BADGE 18:19:25 +05'30'
Deputy Engineer & Special
Planning Authority MIDC Civil
Sub- Division Ahmednagar.

 Copy submitted to Regional Officer, MIDC Udyog Bhavan, Satpur,


Nashik for favour of information please.
 Copy to FWC’s to the Deputy Engineer, MIDC Maintenance Sub-
Division, Ahmednagar.
 Copy to FWC’s to the Area Manager, MIDC, Ahmednagar.

4
5
Accompaniment to letter no. P217402 Dated – 14 / 03 / 2024 issued by
The Deputy Engineer, MIDC, Civil Sub Division, Ahmednagar Addressed to
M/s SART INNOVATION PVT. LTD., Plot No. G-122/3/2 of Ahmednagar
Industrial Area.
Sr. No. of Name & Address of Name of unit Floor Built up area
No. Drawi- Architect or & Reference Approved floor
ngs Licensed Surveyor wise
& Total of all such
Area approved
1 2 3 4 5 6

1 01 Hemant G. Work Shed, Toilet,


Etc……
Dahatonde,
Engineer. G.F. 259.40 Sqm.

F.F. 0.00 Sqm.


S.F.
0.00 Sqm
Mezz. 0.00 Sqm.
Lic. No. Ex.Ht.
LE00031 0.00 Sqm.
-----------------------
Total 259.40 Sqm.

ABSTRACT:

1) Existing Built/up area approved on all floor. 0.00 Sqm.


2) Area to be demolished. 0.00 Sqm.
3) Existing Built/up area to be retained. 0.00 Sqm.
4) Total Built/up area approved now on all floors… 259.40 Sqm.
5) Total up to date Built/up area approved on the floors. 259.40 Sqm.
6) Total up to date FAR consumed. All Floors 0.51

SANDEEP Digitally signed by


SANDEEP
SHESHRAO SHESHRAO BADGE
Date: 2024.04.03
BADGE 18:19:50 +05'30'
Deputy Engineer & Special
Planning Authority MIDC Civil
Sub- Division Ahmednagar.