Admin Block Complete Dwgs
Admin Block Complete Dwgs
20'-8"
19'-3" 18'-512"
10'-521"
72'-4"
11'-312"
'
10'
R5
10'
13'
165'-3"
53'-1 "
53'-112"
1
2
72'-4"
72'-4"
95'-4"
HOSTEL
34'
164'-958"
10'12'
165'-3"
165'-3"
59'-018"
59'
HOSTEL
19'-3"
19'-3"
R2
0' 11'-5"
93'-1121"
1 1 1
10'-8" 53'-1 " 2 59'-0 " 8 53'-1 "2
165'-3" 18'
DRIVE WAY
53'-1 "
53'-121"
1
2
37'-1134" 378'-083" 38'
R2
18'
18'
18'
36'-1018"
20'-521"
19'-718"
0'
DRIVE WAY DRIVE WAY
R2
116'-9"
DRIVE WAY
22'
112'-3"
AUDITORIUM
18'
105'-3"
15'
COMMON
ROOMS
52'
514'-1138"
105'-3"
381'-6"
DRIVE WAY
102'
LABORATORY
15'
105'-3"
22'
68'-9"
LECTURE
THEATER
18'
15'
105'-3"
DRIVE WAY
21'-1021" 28'-6"
30'
SUNKEN
ADMIN
115'-6"
R43'
18
58'-1038"
'
R50'
BLOCK LAYOUT
FLOOR PLAN
DRIVE WAY
W
E
107'-958"
18'
N
Client: Title:
NATIONAL MEDICAL COLLEGE LAHORE BLOCK LAYOUT FLOOR PLAN NEWAGE CONCEPTS
Architect: Syed Ali Raza
Issue: Cell:0322-56-55666
Project: nd
INTERNATIONAL SCHOOL OF MED. SCIENCES 24 November, 2022. Voice: 042-3569-0747
E-Mail: [email protected]
20' 2' 14' 9" 8'-6" 9" 2' 2' 4'-6"
10'
SEE DETAIL 4
8'-6" 1' 13' 1' 13' 1' 13' 1'-2" 3'
F.L
N.S.L
1.F
2.F
U.G
DECK.L
ROOF TOP
D.L
ROOF TOP
4'
4'
2.F
4'
4'
4'
4'
1.F
4'
4'
8'
4'
4'
U.G
1'-6"
4'-6"
4'-6"
11'-6"
N.S.L
7'
7'
12" FILL
4"
4"
L.G
1'
1'
110'
7'-6"
2'-6"
7'-6"
7'-6"
A
9" 10' 9" 2' 9'-6" 2' 9'-6" 2' 11'-5" 2' 14'-1" 2' 11'-6" 2' 13'-712" 2' 8'-7" 2' 8'-7" 2' 4'-9"
9"
9"
1'-6"
1'
8'-9" 43'-10" 5' 4'-11" 2' 6'-6" 4'-721" 9" 9" 5'-9" 1'-421" 2' 9" 2'-6" 9" 4'-6" 16'-721" 9"
2'-312"
2'
4"
421" 6" 421" 421" 1021" 412"
5'-8"
LINTEL : 11'-6" 6" LINTEL : 11'-6"
SILL : 7'
2'-9"
3'-312"
SILL : 7'
7'-9"
10'-3"
8'-9"
8'
1'-112"
412"
11'-312"
12'-3"
4'
2'-9"
16'-9"
2'-3"
18'-9"
9"
26'
421" 421"
21'-3"
2'-9"
8'-121" 6'-6"
421"
421"
6'-6"
30'
4'-10"
4'-10"
412"
4'-112"
27'-6"
24'-9" 14'-9"
421"
9" 26'-3" 9" 6'-9" 9" 40'-9"
9"
9"
1'
5' 10'-1" 4'-6" 9" 14'-9"
18'
1'-021" 421"
3'-3"
5'
7'-112"
SEE DETAIL 2
8'-6"
9"
11'-9"
10'-6"
11'
11'
1'
LINTEL : 11'-6"
2'-6"
SILL : 7'
LINTEL : 11'-6"
6'-3"
6'-6"
LINTEL : 11'-6" SILL : 7'
SILL : 7'
3'-6"
5'
1'-121" 421"
4'-112"
2'-3"
2'-6" 8'-6" 9"1'-3" 8'-9" 2' 14'-3" 9" 6' 9"1'-3" 6' 5' 2'-1021" 5' 2'-921" 5' 2'-10" 4'-121" 4' 9" 9" 1'-6" 9" 16'-121" 4'-6" 9" 14'-9"
421"
3"
1'
1'
9"
9"
1'
2' 8'-9" 2' 21' 2' 11'-5" 2' 14'-1" 2' 11'-6" 2' 13'-712" 1'-1121" 8'-721" 2' 8'-7" 2'
A
ADMIN BLOCK LOWER GROUND FLOOR PLAN
3471 SFT
OPEN TO SKY
15' WIDE
12'
1'-3" 10'-9"
SEE DETAIL 2
1'
105'-3"
2'-6"
A
421" 421" 421" 421"
6' 9" 10' 9" 1'-9" 9" 21' 9" 8'-1121" 33'-8" 9" 8'-121" 6'-6" 6' 14'-9" 9"
412"
3"
9"
9"
2'-6"
2'-7"
2'
421"
13'-3" 9" 21' 9"1'-3" 7'-812" 9'-6" 5' 7'-112" 6'-6" 5'-621" 9" 1' 5'-9" 1'-421" 2' 3'-3" 9" 4'-6" 9" 2'-1121" 2' 8'-7" 1'-3" 9"
3'
4'-1"
5'-812"
LINTEL : 8'-0" LINTEL : 8'-0"
5'
7'-721"
2'-9"
3'-4"
SILL : 7'
8'-9"
8'-9"
LINTEL : 8'-0"
11'
1'-112"
10'-9"
SILL : 4'
412"
4'-712"
11'-6"
11'-3"
7'-812"
412"
14'-1"
14'-1"
412"
5'-5"
2'-9"
2' 2'-712" 6' 2'-721" 9" 5' 11' 5' 8'-4"
8'
17'-9"
5'-5"
721" 421"
9"
421" 421"
35'-6"
1'-6"
26'
2'-321"
SILL : 4'
9"
3'-3"
412"
412"
412"
412"
2'
421"
3'-6"
9" 4'-6" 9"1'-3"
412"
12' 21' 9" 43' 15'-9" 6' 15'-6" 9"
16'-3"
1'-112"
2'
2'-6"
1'-6"
412"
421"
421"
421"
4'-1021"
30'
4'-112"
8'
421" 421"
2'
421"
3'
2'
3'-6"
9"
421"
LINTEL : 8'-0"
2'-6"
9"
1'-6"
20'-6"
9"
SILL : 3'-6" 33' 35'-1" 1'-11" 3' 9" 1'-6" 9" 15'-1" 6'-321" LINTEL : 8'-0"
18'-3"
17'-6"
SILL : 4'
412" 412"
3'-3"
5'
3'
2'
8'
14'-1"
14'-1"
9"
SEE DETAIL 1
7'-8 "
1
2
2'-6"
1'-6"
10'-412"
11'
1'
2'-6"
6'-3"
6'-6"
LINTEL : 8'-0" LINTEL : 8'-0" LINTEL : 8'-0"
5'
LINTEL : 8'-0"
5'
4'-1"
5'-6"
2'-6"
1'-3" 8'-9" 14'-3" 9" 6' 9" 7'-3" 5' 2'-10" 5' 2'-10" 5' 2'-10" 4'-4" 9" 3'-921" 9" 1'-6" 13'-721" 4'-6" 9" 2'-1121" 8'-7" 1'-3"
4'
3"
1'-1012"
9"
9"
9"
9"
9"
9"
2'-3" 2'-6" 8'-6" 9" 33' 9" 35'-1" 5'-321" 9" 1'-6" 9" 21'-421" 13'-6" 2'
412" 412"
A
ADMIN BLOCK GROUND FLOOR PLAN
2885 SFT
12'
4'-9"
4'-9"
7'-6"
8'-9" 3'-3"
105'-3"
421" 421" 421" 421" 421"
9"
SEE DETAIL 3
A
2'-6"
9" 1'-9" 9"1'-3"1'-3" 5' 2'-6" 9" 1'-9" 9" 21' 9" 10' 32'-721" 8'-6" 6'-6" 6' 14'-9" 9"
2'-6"
721"
3"
412"
1'
2'-6"
2'-212"
2'-6"
2'
3'-9" 11'-3" 9" 5' 11' 5' 9" 10' 4'-9" 7'-6" 8'-121" 7'-6" 4' 9" 1'-421" 5'-9" 1'-421" 2' 2'-421" 9" 4'-6" 9" 2'-1121" 2' 8'-7" 1'-3"
412"
2'-6"
2'-6"
421" 412"
421" LINTEL : 8'-0" LINTEL : 8'-0" 1021" 1021" 421"
5'-7"
5'
5'
421"
2'-6"
421"
5'-4"
SILL : 4' SILL : 4'
2'-9"
3'-2 "
1
2
2'-512"
LINTEL : 8'-0"
1'-121"
SILL : 4'
412"
412"
412"
412"
10'-9"
11'-1012"
11'-6"
3'
2'
11'
11'
7'-821"
8'-6" 6'-6"
13'-10"
14'-1"
8'-421"
2'-6"
421"
1'-6"
412"
2'-9"
6'
6'
5'-7"
5'-7"
5'-7"
5'-7"
35'-6"
421" 42"
1
421" LINTEL : 8'-0"
3'
2'-512"
SILL : 3'-6" 4'-9" 7'-6" 1'-612" 5' 1'-612" 7'-6" 4'-9" 5'-112" 3' 6'-6" 6' 14'-9" SILL : 4'
4"
4"
412"
412"
421"
421"
412"
3'-6"
2'-6"
1'-6"
5"
3'-1"
412"
5' 11' 5' 9" 10' 33' 15'-9"
1'-112"
4'-1012"
421"
421"
412"
412"
4'-1012"
4'-1012"
5'-10"
28'-6"
30'
4'-121"
3'
2'
5'
7'-9"
7'-9"
15' 9" 21' 9" 5'-6" 37'-6" 2' 12'-1012" 2' 5'-3" 14'-9"
3'-1"
412"
421"
2'-6"
1'-6"
3'-6"
421"
421"
5"
421"
4"
9"
9"
4"
5'-6" 3'-6" 4'-7" 16'-121" 3'-6" 5'-321" 9" 1'-6" 9" 5' 10'-1" 6'-321"
LINTEL : 8'-0"
2'-9"
2'-6"
2'-6"
3'-3"
5'
6'
13'-10"
14'-1"
2'-6"
9"
7'-812"
11'-421"
11'-421"
11'-3"
11'
11'
11'
1'
8'-3"
4'-9"
6'-3"
6'-6"
LINTEL : 8'-0" LINTEL : 8'-0"
LINTEL : 8'-0" LINTEL : 8'-0" LINTEL : 8'-0"
SILL : 4' 41"
5'
5'
421" SILL : 4' 421" SILL : 4' 421" SILL : 4'
SILL : 4' 6" 2
2'-6"
3' 2' 8'-9" 2' 14'-3" 9" 6' 9"1'-3" 4'-3" 1'-5" 5' 2'-5" 5' 2'-10" 5' 2'-10" 4'-4" 9" 3'-912" 9" 1'-6" 13'-721" 2' 4'-6" 9" 2'-1112" 2' 8'-7" 1'-3"
1'-9"
1'
1'
9"
9'-6" 9" 30' 9" 6' 9" 5'-6" 8'-10" 20' 5'-321" 9" 1'-6" 9" 21'-421" 14'-9" 9"
421" 421" 421" 421"
A
ADMIN BLOCK FIRST FLOOR PLAN
3582 SFT
5'-6"
2'-9"
105'-3"
2'-3"
2'-3"
3'-3"
9"
A
421" 421"
2'-6"
1'
1' 1'-3" 9"
2'-4"
2'
3' 9" 1'-9" 2' 8'-9" 1'-3" 2' 9'-6" 2' 9'-6" 2' 11'-5" 2' 14'-1" 2' 11'-6" 2' 7'-712" 2' 2'-412" 9" 4'-6" 4'-1" 2' 8'-7" 1'-3" 9"
412"
4'-3"
412"
1021" 1021"
421"
6"
421"
5'-5 "
1
2
3'-212"
2'-9"
LINTEL : 8'-0"
1'-6" 1'
1'-121"
SILL : 4'
412"
11'-1012"
6"
6'-6"
412"
1'
6"
421"
2'-9"
16'-9"
16'-9"
5'-7"
5'-5"
1'
6"
18'-9"
30'-6"
LINTEL : 8'-0"
19'-6"
421"
20'-6"
2'-312"
21'-3"
SILL : 4'
1'
6"
6'-6" 21'-121"
1'
6"
1'
6"
4'-1012"
30'
20'
28'
1'
6"
421"
30' 6'-9" 9" 13'-3" 27'-112" 19'-121" 5'-721" 14'-9"
1'
6"
9"
1'
6"
1'-012" 412"
6"
3'-3"
5'
SEE DETAIL 3
2'-6"
9"
11'-9"
11'-9"
1'
2'-3"
8'-9"
7'-9"
6'-3"
6'-6"
LINTEL : 8'-0" LINTEL : 8'-0"
LINTEL : 8'-0" SILL : 4' LINTEL : 8'-0" SILL : 4'
4'-3"
5'
SILL : 4' 5" 5" SILL : 4' 1'-121" 6" 421"
4'-3"
3' 2' 8'-9" 2' 14'-3" 9" 6' 2' 6' 5' 2' 5' 2'-10" 5' 10" 2' 4'-4" 3'-912" 9" 9" 9" 9" 9" 13'-721" 2' 4'-6" 9" 2'-1112" 2' 8'-7" 1'-3" 9"
9"
1'
9"
3' 3'-9" 27' 9" 6' 9" 13'-3" 27'-121" 9" 1'-6" 9" 21'-421" 15'-6"
412" 412"
ADMIN BLOCK SECOND FLOOR PLAN
A
3471 SFT
2'-9"
5'-6"
3' 2'-6"
7'-6"
2'-3"
105'-3"
412"
A
3' 2'-121" 10'-9" 76'-112" 2' 4'-1012" 21'-6"
412" 412" 421" 412" 421"
13'-6"
13'-6"
PUMP ROOM
30'-6"
31'-9"
9"
30'
20'
FIRE FIGHTING
15'
15'
O.H.W. TANK
LIFT
WATER SUPPLY
MACHINE O.H.W. TANK
ROOM
4'-3"
412" 421"
30'-412" 9" 6' 9" 19'-712" 9" 20' 9" 1'-6" 16'-121" 9" 20' 9"
4"
1
2
9"
ADMIN BLOCK ROOF PLAN
A
GENERAL NOTES
NOTES:-
NOTES:-
NOTES:-
NOTES:-
NOTES:-
NOTES:-
NOTES:-
NOTES:-
NOTES:-
NOTES:-
9" 1' 9"
412"
3" 3"
3"
9"
9"
6" 1'
2'-6"
1'
1'
1'
1'
2'-6"
1'-6"
112"
9"
9"
3"
DETAIL 2
DETAIL 1
1'-3"
2"
9"
1'-10"
1'
412"
2'
R1'-1 1
04"
9"
DETAIL 4
DETAIL 3
E-Mail: [email protected]
NEWAGE CONCEPTS
Architect: Syed Ali Raza
Voice: 042-3569-0747
Cell:0322-56-55666
MOUNTING
S.NO SYMBOLS DESCRIPTION S.NO SYMBOLS DESCRIPTION
HEIGHT
PICTURE/MIRROR LIGHT WALL MOUNTED FIXTURE WITHLED TUBE 1 H HEAT DETECTOR RATE OF TEMPERATURE TYPE ON SLAB
1 LIGHT WITH 1x14.5 WATTS LED ROD AND DRIVER
2 RECESSED DOWN LIGHT WITH 10 WATTS LED 2 S SMOKE DETECTOR NON IONISATION TYPE. ON SLAB
3 ALARM SOUNDER
JUNE 2,2023
RECESSED DOWN LIGHT WITH 11 WATTS LED 3 7'-0"F.F.L
4 RECESSED DOWN LIGHT WITH 18 WATTS LED 4 MANUAL BREAK GLASS UNIT 3'-6"F.F.L
M
6 TECHNOLOGY BOX
6 FACP FIRE ALARM CONTROL PANEL 4'-0"F.F.L
7 FAN POINT 56'' SWEEP WITH M.S HOOK WIRING IN 1"DIA PVC FOR FIRE IN WALL, SLAB
7
ALARM SYSTEM OR IN FLOOR
20
BACK BOX
WALL 125
ADMIN BLOCK
4 POSITION
IN WALL, SLAB
Title:
4 WIRING IN 1"DIA PVC FOR CCTV SYSTEM
OR IN FLOOR
FRONT
4'-0"F.F.L
ON FALSE
CIRCULAR TYPE LOUD SPEAKER
CEILING END STOPPER
EARTH BAR
WIRING IN 1"Ø PVCC FOR PUBLIC BIS OR ON (SQUARE) WITH SUFFICIENT
ADDRESS SYSTEM SLAB AFC HOLES FOR EACH CIRCUIT
MOUNTING
S.NO SYMBOLS DESCRIPTION
HEIGHT
10 AMPS, ONE WAY AND TWO WAYS GANG TYPE
1 SWITCH NUMBER OF SWITCHES ON SWITCH PLATE 3'-6" F.F.L
Project:
2 3 PIN COMBINED SWITCH SOCKET 13 AMPS, 0'-9" F.F.L
Client:
3 3 PIN COMBINED SWITCH SOCKET 15 AMPS, 2'-0" F.F.L
INNOVATIVE ENGINEERING
Email: [email protected].
SOCKET 16 AMPS,
SOLUTIONS.
3471 SFT
S
COLUMN
9X9 Concrete
9X9
MS PIPE
PoE PoE
FAJB AMPLIFIER
FILE ROOM
S
8'-121" X 11'-6"
SHAFT REQ. FOR
PLUMBING PIPING
PoE
VOID
BATH
6'-6" X 5'-5"
UP
S
21'-421" X 11'
STAIR AREA
S
14'-9" X 11'
S
HORTICULTURE
4' X 3' X 4'
4' X 5' X 4'
3471 SFT
5
6
4
6
3
9X9
COLUMN
6 Concrete
9X9
MS PIPE
3
5
2
4
3
4
1
3
1
1
2
B1
2
1
TO DB-LGF
S1-6
S1-5
R1
1
1
TO DB-LGF
1
S1
FILE ROOM
8'-121" X 11'-6"
SHAFT REQ. FOR
PLUMBING PIPING
VOID
5
1
BATH
1
S1
26'-6" X 5'-5"
UP
S1-5
1
1
Y1
3
TO DB-LGF
21'-421" X 11'
STAIR AREA
S1
S1-3
S1
1
1
1
14'-9" X 11'
HORTICULTURE
1
2
2
4' X 3' X 4'
4' X 5' X 4'
2U
EC-2
1U
TO DB-LGF
S1-3
EC-1
TO DB-LGF
2U
S1-2
1U
S1
1U
FILE ROOM
8'-121" X 11'-6"
SHAFT REQ. FOR
PLUMBING PIPING
VOID
BATH
6'-6" X 5'-5"
UP
1U
3U
6U
21'-421" X 11'
STAIR AREA
S1-6
S1-2
1U
2U
2U
14'-9" X 11'
HORTICULTURE
4U
5U
1U
1U
COLUMN
9X9 Concrete
9X9
MS PIPE
TO DB-LGF
TO DB-LGF
8'-121P1
FILE ROOM
" X 11'-6"
TO DB-LGF
SHAFT REQ. FOR
PLUMBING PIPING
VOID
6'-6" X 5'-5"
UP
P3
P3
BATH TO DB-LGF
21'-421" X 11'
STAIR AREA
TO DB-LGF
P4
P2
14'-9" X 11'
TO DB-LGF
TO DB-LGF
HORTICULTURE
4' X 3' X 4'
4' X 5' X 4'
ODF
FILE ROOM
8'-121" X 11'-6"
SHAFT REQ. FOR
PLUMBING PIPING
PoE
VOID
BATH
6'-6" X 5'-5"
UP
8 PORTS POWER OVER
STAIR AREA
ETHERNET SWITCH FOR DATA
TO POE-DATA-LGF
14'-9" X 11'
HORTICULTURE
Voice: 042-3569-0747
Cell:0322-56-55666
JUNE 2,2023
Issue:
LOWER GROUND FLOOR
SHAFT REQ. FOR
ADMIN BLOCK
1"Ø PVC CONDUIT (TYP.)
FILE ROOM
8'-121" X 11'-6"
FAJB
S
Title:
S S S 5' WIDE PASSAGE
UP
MS PIPE S
HORTICULTURE
Project:
Client:
HVAC, Plumbing, Mechanical & Electrical
INNOVATIVE ENGINEERING
Email: [email protected].
407-4th Floor, Land Mark Plaza,
Lahore -54000 Pakistan.
Ph: +92 323 4933171
SOLUTIONS.
CC
CC
TV
TV
3471 SFT
TO POE-LGF
COLUMN
9X9 Concrete
9X9
EOLR
MS PIPE
TO POE-LGF
TV
CC
TV
CC
PoE PoE
AMPLIFIER
CCTV
FILE ROOM
SHAFT REQ. FOR
PLUMBING PIPING
VOID
(PoE-LGF)
(PoE-LGF)
BATH
6'-6" X 5'-5"
UP
8'-121" X 11'-6"ETHERNET SWITCH FOR AMP
ETHERNET SWITCH FOR CCTV
21'-421" X 11'
STAIR AREA
TV
CC
TO AMPLIFIER
TO POE-LGF
14'-9" X 11'
HORTICULTURE
TV
CC
E-Mail: [email protected]
NEWAGE CONCEPTS
Architect: Syed Ali Raza
Voice: 042-3569-0747
Cell:0322-56-55666
GENERAL NOTES :- DRAINAGE SYSTEM:
1- ALL DIMENSIONS ARE IN INCHES OTHERWISE SPECIFIED. 1- SANITARY DRAINAGE SYSTEM INSIDE THE BUILDING SHALL BE ONE PIPE SYSTEM FOR BOTH SOIL AND WASTE
APPLIANCES.
2- IT IS THE CONTRACTOR RESPONSIBILITY AND LIABILITY TO SYSTEMATICALLY, ACCURATELY, AND DILIGENTLY
COORDINATE ALL WORKS OF ALL TRADES, AS DEPICTED ON EACH TRADE DRAWING, WITH EACH OTHERS AND 2- SANITARY DRAINAGE PIPING BELOW GRADE WILL BE UPVC CLASS 5 & CLASS 4 FOR ABOVE GRADE WITH RUBBER
GASKET.
WITH ALL PRODUCTS DATA SHEETS BEFORE GENERATING SHOP DRAWINGS FOR FABRICATION, INSTALLATION,
PROCUREMENT OF PRODUCTS, AND/OR CONSTRUCTION. 3- ALL WET AREAS SUCH AS TOILETS, JANITORS, KITCHENS, MECHANICAL ROOMS, ...ETC SHALL BE PROVIDED
Issue:
6- ALL PIPES RUN SHOWN ARE ABOVE FALSE CEILING LEVEL UNLESS OTHERWISE MENTIONED.
1- PROVIDE ISOLATING VALVE OR ANGLE VALVE AT ALL BRANCH PIPES CONNECTION /RISER.
7- CONNECTION OF HORIZONTAL DRAINAGE LINES WITH OTHER HORIZONTAL DRAINAGE LINES SHALL BE MADE
2- ALL JOINTS IN PIPE WORK AND JOINTS OF PIPE WORK TO APPLIANCES SHALL BE AIRTIGHT AND WATERTIGHT USING 45 DEGREE "Y" BRANCHES, COMBINATION "Y" AND 1/8 BEND BRANCHES OR OTHER APPROVED FITTINGS
AND SHALL REMAIN SO DURING USE. CARE SHALL BE TAKEN TO ENSURE THAT NO JOINING MATERIAL OF EQUIVALENT SWEEP, UNLESS SPECIFIED OTHERWISE.
PROJECTS INSIDE THE CORE OF THE PIPE. SOME FLEXIBILITY IS DESIRABLE WHERE THERE IS A POSSIBILITY
OF MOVEMENT IN A PIPELINE OR BETWEEN THE PIPE AND THE APPLIANCE AND PROVISION SHALL BE MADE 8- INSTALL PIPING PARALLEL TO BUILDING WALLS AT SUCH HIGHS AS NOT TO OBSTRUCT ANY PORTION OF
IN ASSEMBLY OF SANITARY PIPE WORK TO ACCOMMODATE AND CONTROL THERMAL MOVEMENT. WINDOWS, DOOR WAYS, STAIR WAYS OR PASSAGE WAYS.
3- ALL PIPE SIZE SHOWN ARE NOMINAL PIPE DIAMETER IN INCHES. 9- CONNECTION OF VERTICAL DRAINAGE LINES WITH HORIZONTAL DRAINAGE LINES SHALL BE MADE USING 45
DEGREE BRANCHES OR OTHER APPROVED FITTINGS OF EQUIVALENT SWEEP.60 DEGREE BRANCHES OR
4- REFER TO AREA PLANS FOR DETAILED PIPING LAYOUT OF WATER SUPPLY PIPING NETWORK. OFFSETS MAY BE USED ONLY WHEN INSTALLED IN A TRUE VERTICAL POSITION.
5 ALL PIPE PENETRATION THROUGH ROOF AND EXTERIOR WALLS SHALL BE FULLY WATERPROOFED.
10- CHANGES IN DIRECTION OF DRAINAGE PIPING SHALL BE MADE BY THE APPROPRIATE USE OF APPROVED
6- EXACT ROUTE AND LOCATION OF EACH PIPELINE SHALL BE DETERMINED IN COORDINATION WITH OTHER FITTINGS AND SHALL BE OF THE ANGLES PRESENTED BY 1/16 BEND, 1/8 BEND OR 1/6 BEND OR OTHER
TRADES PRIOR TO INSTALLATION. APPROVED FITTINGS OF EQUIVALENT SWEEP.
7- PROVIDE UNIONS AT THE FINAL CONNECTION TO EACH PIECE OF EQUIPMENT OR PLUMBING FIXTURE HAVING 2 11- HORIZONTAL PIPING SHALL BE SUPPORTED AT SUFFICIENTLY CLOSE INTERVALS TO MAINTAIN PIPE ALIGNMENT
INCHES AND SMALLER CONNECTIONS. AND PREVENT SAGGING.
8- PROVIDE FLANGES ON ALL VALVES, APPARATUS AND EQUIPMENT HAVING 2-1/2 INCHES AND LARGER CONNECTIONS. 12- PROVIDE ESCUTCHEONS ON ALL EXPOSED PIPING PASSING THROUGH WALLS, FLOORS, PARTITIONS AND
9- PROVIDE PIPE SLEEVE WITH CAULKING FOR ALL PIPES PENETRATING THROUGH CONCRETE STRUCTURES. CEILINGS HELD IN PLACE BY INTERNAL SPRING TENSION OR SET SLEEVES.
10- THE CONTRACTOR MUST FOLLOW MANUFACTURER'S RECOMMENDATIONS FOR FIXTURES PRE-INSTALLATION. 13- RODDING ACCESS TO BE LOCATED ON WALL OF DUCT SHAFTS AND COORDINATED WITH ARCHITECT (TYPICAL
TO ALL DUCT SHAFTS).
11- ALL MATERIALS TO BE USED SHALL GENERALLY CONFORM TO SASO, AMERICAN OR BRITISH STANDARDS.
14- TRAP ALL FIXTURES AS REQUIRED BY CODES & STANDARDS
12- COMPLETED PLUMBING SYSTEM INSTALLATIONS SHALL BE TESTED IN ACCORDANCE WITH ACCEPTED CODES
AND STANDARD TESTING PROCEDURE. 15- EXACT ROUTE AND LOCATION OF EACH PIPELINE SHALL BE DETERMINED IN COORDINATION WITH OTHER
TRADES PRIOR TO INSTALLATION.
Title:
13- ALL IMPORTANT ITEMS LIKE VALVES, ETC. SHALL HAVE A REPRESENTATIVE SAMPLE & CATALOG TO BE
16- PROVIDE PIPE SLEEVE WITH CAULKING FOR ALL PIPES PENETRATING THROUGH CONCRETE STRUCTURES.
SUBMITTED TO THE CONSULTANT FOR APPROVAL.
18- FLOOR DRAINS AND / OR FLOOR SINKS WILL BE FLUSH WITH FINISHED FLOOR, MINIMUM 2 INCHES OUTLET. 22- LONG RADIUS BEND SHALL BE USED AT THE FOOT OF VERTICAL SOIL / WASTE STACKS.
19- SEISMIC RESTRAINTS WILL BE PER THE REFERENCED BUILDING CODE 23- COMPLETED PLUMBING SYSTEM INSTALLATIONS SHALL BE TESTED IN ACCORDANCE WITH ACCEPTED CODES
AND STANDARD TESTING PROCEDURE.
20- SBC, UPC AND IPC IS TO BE FOLLOWED DURING WORK IN PROGRESS.
24- ALL ITEMS TO BE INSTALLED SHALL IN ACCORDANCE WITH THE APPROVED SHOP DRAWINGS.
21- POLYPROPYLYNE PIPES ARE TO BE PROVIDED FOR WATER SUPPLY PIPING
LEGEND:
IMPORTANT NOTES :-
COLD WATER PIPE (C.W)
1- ALL DRAWINGS ARE DIAGRAMMATIC IN NATURE AND INTENDED TO DEMONSTRATE THE INTENT OF THE DESIGN
HOT WATER PIPE (H.W)
AND SHALL NOT BE USED DIRECTLY FOR FABRICATION AND/OR INSTALLATION. THE CONTRACTOR SHALL USE
THE INFORMATION SHOWN AS START POINT TO DEVELOP DETAILED SHOP DRAWINGS NECESSARY FOR
GATE VALVE
FABRICATION & INSTALLATION, THE CONTRACTOR SHALL SUBMIT THESE SHOP DRAWINGS, & CATALOG CUTS GV
FOR CLIENT APPROVAL PRIOR TO PROCUREMENT, FABRICATION AND INSTALLATION.
CHECK VALVE
NRV
2- THE CONTRACTOR PERFORMING THE PROCESS WILL CONSIDER & CHECK THE LATEST UPDATE OF
ARCHITECTURAL, INTERIOR DESIGN, REQUIREMENTS OF MEDICAL GASES INSIDE THE ROOMS & LABS, THE PRESSURE REGULATING VALVE
PRV
SELECTION OF APPROPRIATE SYSTEMS TO FIGHT THE FIRE INSIDE THE SPECIAL ROOMS IN ACCORDANCE
WITH NFPA WASTE PIPE
3- THE COORDINATION BETWEEN ALL TRADES IS THE CONTRACTOR RESPONSIBILITY SOIL PIPE
4- SHOP DRAWING REQUIRED FROM THE CONTRACTOR TO CONSULTANT APROVAL RAIN WATER PIPE
5- WHERE THERE IS CONFLICT BETWEEN ANY LOCAL AUTHORITY REQUIREMENTS AND THE DRAWINGS OR VENT PIPE
SPECIFICATIONS, REQUIREMENTS OF LOCAL AUTHORITIES SHALL GOVERN.
WITH P- TRAP FD
6- IT IS THE CONTRACTOR RESPONSIBILITY AND LIABILITY TO SYSTEMATICALLY, ACCURATELY, AND DILIGENTLY
Project:
Client:
MULTI FLOOR TRAP MFT
COORDINATE ALL WORKS OF ALL TRADES, AS DEPICTED ON EACH TRADE DRAWING, WITH EACH OTHERS AND
WITH ALL PRODUCTS DATA SHEETS BEFORE GENERATING SHOP DRAWINGS FOR FABRICATION, INSTALLATION, CLEAN OUT CO
PROCUREMENT OF PRODUCTS, AND/OR CONSTRUCTION.
FLOOR CLEAN OUT FCO
7- REFER TO DRAWINGS FOR EQUIPMENTS CAPACITIES & POWER REQUIRED ACCORDING TO DESIGN STAGE ONLY
Email: [email protected].
8- CONTRACTOR IS RESPONSIBLE FOR CONNECTION OF MAIN NETWORK WITH EXISTING LINES IN CO-ORDINATION WITH CLIENT
TO VANITY
25Ø H.W PIPE
25Ø C.W PIPE
PIPE
PIPE
11'-6"
40Ø C.W PIPE F/A
63Ø C.W FILLING PIPE T/A
CONNECT TO MAIN SUPPLY LINE
63Ø C.W FILLING PIPE
I.G I.G
VOID
GV
32Ø 32Ø
BATH
6'-6" X 5'-5"
UP
21'-421" X 11'
STAIR AREA
OR FLUSH TANK
OR FLUSH TANK
MUSLIM SHOWER
MUSLIM SHOWER
14'-9" X 11'
HORTICULTURE
Voice: 042-3569-0747
Cell:0322-56-55666
GROUND FLOOR ADMIN-BLOCK JUNE 2,2023
Issue:
DRAINAGE LAYOUT FOR LOWER
6"Ø SEWER PIPE
CONNECT MANHOLE
MH
6"Ø SEWER PIPE MH
1:200 GRADIENT
4"Ø SOIL PIPE &
3"Ø WASTE PIPE 3"Ø uPVC FORCE MAIN PIPE UP
PIPE FROM ABOVE 2"Ø VENT PIPE UP
FD
Title:
5' WIDE PASSAGE
Project:
Client:
HVAC, Plumbing, Mechanical & Electrical
INNOVATIVE ENGINEERING
Email: [email protected].
407-4th Floor, Land Mark Plaza,
Lahore -54000 Pakistan.
Ph: +92 323 4933171
SOLUTIONS.
REINFORCED CONCRETE
E-Mail: [email protected]
NEWAGE CONCEPTS
EXPANSION BOLT
OR CMU WALL ASSEMBLY(TYPICAL)
Voice: 042-3569-0747
FINISHED WALL 15mm | COLD
Cell:0322-56-55666
GA.20 x 40MM
WATER SUUPLY GALVANIZED SHEET
METAL STRAP
METAL
LATH
CMU
FAUCET
25Ø CW SWING SPOUT CEMENT
PLASTER
50Ø VENT
STAINLESS SINK
JUNE 2,2023
SCALE: N.T.S - -
F.F.L
SELECTED BACKFILL
MATERIAL
Issue:
FIN. GRADE
GENERAL BACKFILL
MATERIAL
110Ø
50Ø
NOTES:
100
SLOPE
1. BASE DIMENSIONS ON MANUFACTURER'S DATA & RECOMMENDATIONS.
SAND
300
2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE NOTED. SEWER OR WATER PIPE
COARSE
SECTION
MAIN SEWER LINE
STANDARD DETAIL - 01
UNDISTURBED SOIL OR
ACCEPTABLE COMPACTED FILL
150
- -
SCALE: N.T.S - -
NOT TO SCALE
200 PIPE 200
DIA
UNDISTURBED PLUG
SANITARY TEE SOIL
Title:
P-TRAP
PIPE
Ø32mm W/S
50mmØ DRAIN
CLEAN OUT PIPE
PIPE SLEEVE
SCALE: N.T.S - -
SCALE: N.T.S - -
Project:
Client:
HVAC, Plumbing, Mechanical & Electrical
INNOVATIVE ENGINEERING
Email: [email protected].
407-4th Floor, Land Mark Plaza,
Lahore -54000 Pakistan.
SCALE: N.T.S - -
Voice: 042-3569-0747
Cell:0322-56-55666
JUNE 2,2023
SCALE: N.T.S
Issue:
STANDARD DETAIL - 02
SCALE: N.T.S - -
HOLDING SPRING
PRE-GALVANIZED 12 GA.
STREET CHANNEL END CAPS MILD STEEL SPRING NUT
ELECTRO-GALVANIZED
CLEVIS / TYPE HANGER
CONC. SLAB
HANGER ROD
200
8mmØ THREADED
GA 24x25mm GI ROD (TYP)
SHEET METAL
STRAP (TYP) NEOPRENE GASKET
(TYP)
EXPANION BOLT (TYP) COPPER PIPES
(TYP) BOLT & NUT (TYP)
U-BOLT
100
25mmx3mm THK. GI
Title:
PIPE FORMED FLAT BAR NUT (TYP)
U-BOLT
32x32x3m GI ANGLE
COPPER PIPE BAR
ANGLE BRACKET
COPPER PIPE
EXPANSION BOLT U-BOLT
75 75
SCALE: N.T.S - -
ROOF LEVEL
2"Ø VENT PIPE
DRAIN PIPE
MANHOLE
(2' x 2')
Project:
Client:
SCALE: N.T.S - - SCALE: N.T.S - -
Email: [email protected].
SCALE: N.T.S
VOID
BATH
6'-6" X 5'-5"
UP
21'-421" X 11'
STAIR AREA
14'-9" X 11'
HORTICULTURE
40 70
430
TOP VIEW
FRONT VIEW
70 40
610
40
70
70
40
250
700
830
250
FIRE EXTINGUISHER INSTALLATION
SIDE VIEW
FINISHED FLOOR