0% found this document useful (0 votes)
26 views1 page

CC Test 30-10-24

Uploaded by

ssetrdhvr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views1 page

CC Test 30-10-24

Uploaded by

ssetrdhvr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SOUTH WESTERN RAILWAY

office of the Sr. Section Engineer


ElectricalTraction
Arasikere
No. Y/ET.A/CC Test Date: 30.10.2024

TPC/MYS

Sub: Carrying out Current collection test from SPGR-KJGsection of MYS Division

With respect to above , as per Sr.DEE/TR/MYS it is required to carry out Current Collection test in
from SPGR-KJG section by AC loco hauled train No 16535(Golgumbaz Express), as per following plan:
SI No Section TRD Staff as per Depot
1 SPGR-RRB SSE/TRD/ASK+3 TRD staff
2 RRB-JRU JE/TRD/RRB+3 TRD staff
JRU-DVG SSE/TRD/JRU+3 TRD staff
DVG-HVR SSE/TRD/DVG+3 TRD staff
5 HVR-KJG SSE/TRD/HVR+3 TRD Staff

Hence reguested to convey this message to cCRC/MYS PRC/MYS, TPC/SBC and TPC/UBL suitably for
coordination please and required Permission for the above TRD Staff to travel in Rear AC loco cab of their
corresponding jurisdiction while conducting test.

SSE/TRD/MYS

Sr.Section Engineer Electric Traction


Copy To-ADEE/TRD/ASK- For Information Please
Sr.DEE/TR/ASK-- For Information Please South Western Railway, Arsikere