PPR FORM
PPR FORM
DEPARTMENT OF ECE
SIGNATURE OF INTERNAL GUIDE WITH DATE SIGNATURE OF THE PANEL MEMBER WITH DATE
II REVIEW Date: PRESENT/ABSENT
Percentage of work completed: _______
SIGNATURE OF INTERNAL GUIDE WITH DATE SIGNATURE OF THE PANEL MEMBER WITH DATE
III REVIEW Date: PRESENT/ABSENT
SIGNATURE OF INTERNAL GUIDE WITH DATE SIGNATURE OF THE PANEL MEMBER WITH DATE
KEY-IN/SUBMISSION OF ROUGH DRAFT Date:
APPROVED/NOT APPROVED