BOQ G+0 L_Shaped Living Building
ITEM DESCRIPTION UNIT QTY.
A. SUPER STRUCTURE
1.ROOFIG WORK
C-30 Roof cover in corrigated galvanized iron sheet (CIS)),
fixed to wooden purlins with dome headed nails. Price
shall include ridge cap. (Purlins measured and roof
measured in horizontal projection with all acceessory).
1.1 m2 106.00
Supply and fix G-30 galvanized flat metal sheet gutter as
1.2 per the detail drawing. ml 11.50
1.3 down pipe fixed to RC column with metal strap
c/c 100cm ml 22.00
Total to Summary…………….Birr
2. CARPENTERY & JOINRY WORK
All structural members shall be paint 2 coats of
anti termite paint well seasoned and each truss
shall be fixed to RC beam with 0.6mm plain bar.
Truss spacing is shown in the drawing.
2.1 EUCALYPTUS TRUSS
a/12cm upper & lower chord. ml
b/ø10cm diagonal & vertical members. ml
c/ø5x7cm zigba wood purlin. ml
Total to Summary……………………………….Birr
3. METAL WORK
3.1 Fix metal door & window made of emitation
profile with Grill shall be fabricated from
manufactured tabular steel profile and aproved,
quality of cylindarical lock as per drawing
price includes all the necessary work.
DOORS
D1 Size 250cmx300cm pcs 1
w1 Size 120cmx180cm pcs 1
D1 Size 90cmx210cm pcs 3
WD Size 100cmx180cm pcs 2
Total to Summary…………… Birr
4. FINISHING WORK
Finishing work shall include all surface
pre-cleaning preparation application of finish,
polishing and cleaning at the end of finishing
work.
4.10 Apply three coats of plaster in cement mortar
mix 1:3 up to fine finish.to all internal surface,
exposed concret column ,fence wall and beam. m2 389.00
4.20 ditto but to external wall surface. m2 89.00
4.30 Edge work to door,windows and angular wall edges ml
Total to Summary……………… Birr
5. Glazing Work
5.1 Fix 6mm thick ordinary glass quality clear
sheet glass & glazing to metal casment with
putty ,material supply is from client m2 _
Total to Summary……………… Birr
6. Painting
Prepare the surface and apply three coats
of plastic emulsion paint of chosen type
and clour to:
6.1 Internal plastered surface and exposed m2 76
concret column and beam.
6.2 ditto but to external plastered wall surface. m2 134.64
6.3 ditto but to rendearing wall m2 156
6.4 ditto but to Qaurtize paint to external wall m2 336
6.5 ditto but synthtic paint to metal door & windaw. m2
Total to Summary……………… Birr
7. ELECTRICAL INSTALLATION
1. Distribution Board
3.1 Flush Mounted distribution board LPP-TF (the boar
name shall be identified using plastic engrayed
tags screw fastened) in sheet steel structure with
locable door & including bus bars of 63Amp 3phase
with all accessaries fixing & connecting
accessaries.material is supplied by the client
2pcs 10A MCB,1phase 6KA
6pcs 16A MCB,1phase 10KA
1pcs main 32A MCB,3phase 10KA
and with 25% reserve pitch. Nº
2.LIGHT POINTS
2.1 Light points fed through PVC insulated conductor
of.2 x 2.5 sq.mm.in thermoplastic conduit of diam
16mm in/under surface including junction boxes
screw type connectors with insulating caps and
cover including all accessories Nº
3.SWITCH
3.1 Flush mounted Legrand Suno range switch or
equivalent with non circular corresponding box:-
a. Single pole Nº
b. Double pole Nº
7.SOCKET OUTLET POINT
Total to Summary Birr
GRAND TOTAL
RATE AMOUNT
-
_ _