NGC-NGE - 076-340 Op.M. R22, R407, R410,50Hz MP 23-5-000
NGC-NGE - 076-340 Op.M. R22, R407, R410,50Hz MP 23-5-000
www.coolex.com.kw
50 Hz
TABLE OF CONTENTS
General………………………………………………………………… 03
Warranty………….…………………………………………………… 05
Safety Considerations……………..………………………………… 06
Nomenclature ………………………………………………………… 07
Installation & Commissioning ………………………………….…… 08
Service Space............. ……………………………………………… 13
Electrical Data ……………………………………………………...… 14
Supply Air Performance ………………………………………...… 17
Unit Dimensions …………………………………………………...… 20
Load Distribution ………………………………………………..…… 33
Typical Wiring Diagram …………………………………………...… 37
Trouble Shooting ………………………………………………..…… 39
Maintenance ...................…………………………………………… 42
Commissioning Report ……………………………………………… 44
COOLEX Distributors ....………………………………..…………… 46
2
OPERATION MANUAL
GENERAL
3
OPERATION MANUAL
DEAR CUSTOMER
Thanks for choosing COOLEX Ducted Split Air Conditioning Unit. Please take time
to go through this manual since it contains valuable information on installation,
operation and maintenance of the unit. This will ensure a longer life time for the unit.
Receiving
On arrival, inspect the unit before signing the delivery note. Specify any damage on
the delivery note and send a letter of protest to the last carrier of the goods.
Inspection
Check the shipment received according to the shipment list, to make sure the
shipment is complete. After inspecting the unit, protect properly during storage
or while moving it to the actual installation site, this step is important to maintain
warranty and protect unit against adverse weather, theft or vandalism on job-site.
Damage to Units
Be sure to inspect the unit upon receipt for damage. If the unit has been damaged
in transit, file a claim with transportation Company immediately and check your
insurance company immediately.
4
OPERATION MANUAL
WARRANTY
Refrigeration Industries & Storage Co. warrants this product to be free from
defects in factory workmanship and material under normal use and service.
And will repair or replace parts proved to have such a defects as per the
following:
EXCLUSIONS
The following are not manufacturing defects and not covered by COOLEX
warranty:
1- Damage resulting from handling during transportation, transit,installation and
servicing of the product by others.
2- Damage or malfunction resulting from abrupt electrical power supply to the
unit (± 10% from the rated voltage) and electrical hazards.
3- Damage resulting from a different application that it’s designed for.
4- Damage or malfunction resulting from improper supply and return air
distribution from and to the product.
5- Damage resulting from malfunctioning of thermostat or usage of wrong
thermostat or wrong connection of thermostat.
6- Damage of malfunction resulting from improper maintenance of unit.
Improper electrical and/or control wiring connection and room thermostat location.
7- Installing of Concealed Ducted Split units with other brands.
8- Installation of non-recommended pipe connection and failure to install
“oil trap or U-trap” – for central split units.
9- Damage resulting from accident, abuse, fire, unauthorized modification,
improper storage, lightning and natural disasters.
10-Damage or malfunction resulting from installing electrical or mechanical
components external to the unit.
11-Damage or malfunction resulting from installation of under size or over
capacity air –conditioning unit by others.
5
OPERATION MANUAL
SAFETY CONSIDERATION
Installation, start-up and service of air conditioning equipment can be hazardous
due to system pressures, electrical components and equipment location.
Therefore only trained and qualified installation and service technicians should
install, start up and service this equipment.
6
OPERATION MANUAL
NOMENCLATURE
NGC F 175 C 2
Code Description
A First Series
B Second Series
C Third Series
Refrigerant
F : R410A
C : R407C
Blank : R22
7
OPERATION MANUAL
To create the refrigerant lines you will need refrigeration quality annealed copper
tubing. These tubes are available on the local market together with the insulation
and mounting equipment.
Electrical connections
Use insulated copper wire. The section of the core varies depending on the length
required. Refer to Electrical data for the recommended sections. The wiring and
electrical connections must comply with national electricity regulations. Check that
the electrical characteristics on the nameplate correspond to those of the national
grid. The electrical installation shall include a disconnect switch in compliance with
local electrical regulations.
8
OPERATION MANUAL
NGCC/NGEC Suction Liquid Suction Liquid Suction Liquid Suction Liquid Suction Liquid Suction Liquid
076 7/8 1/2 7/8 1/2 7/8 1/2 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8
090 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8
100 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8
120 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-3/8 7/8 1-3/8 7/8
135 7/8 1/2 7/8 1/2 7/8 1/2 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8
150 7/8 1/2 7/8 1/2 7/8 1/2 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8
175 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8
200 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8
240 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-3/8 7/8 1-3/8 7/8
270 1-3/8 5/8 1-3/8 5/8 1-3/8 5/8 1-3/8 7/8 1-3/8 7/8 1-3/8 7/8
300 1-3/8 5/8 1-3/8 5/8 1-3/8 7/8 1-3/8 7/8 1-3/8 7/8 1-3/8 7/8
340 1-1/8 1/2 1 1/8 1/2 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8
076 7/8 1/2 7/8 1/2 7/8 1/2 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8
090 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8
100 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8
120 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-3/8 7/8 1-3/8 7/8
130 1-3/8 5/8 1-3/8 5/8 1-3/8 5/8 1-3/8 7/8 1-3/8 7/8 1-3/8 7/8
150 7/8 1/2 7/8 1/2 7/8 1/2 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8
175 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8
200 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8
240 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-3/8 7/8 1-3/8 7/8
270 1-3/8 5/8 1-3/8 5/8 1-3/8 5/8 1-3/8 7/8 1-3/8 7/8 1-3/8 7/8
300 1-3/8 5/8 1-3/8 5/8 1-3/8 7/8 1-3/8 7/8 1-3/8 7/8 1-3/8 7/8
320 1-3/8 5/8 1-3/8 5/8 1-3/8 7/8 1-3/8 7/8 1-3/8 7/8 1-3/8 7/8
340 1-3/8 5/8 1-3/8 5/8 1-3/8 7/8 1-3/8 7/8 1-3/8 7/8 1-3/8 7/8
9
OPERATION MANUAL
For different piping installation than mentioned above, Kindly consult Factory.
10
OPERATION MANUAL
OUTDOOR UNIT
11
OPERATION MANUAL
INDOOR UNIT
12
OPERATION MANUAL
SERVICE SPACE
13
OPERATION MANUAL
ELECTRICAL DATA
Volt 415
Unit Power
Phase 3
Supply 50
Hz
V - Ph - Hz 415-3-50
Compressor RLA 12.1 16.4 17.3 19.2 10 each 12.1 each
LRA 101 95 111 118 74 each 101 each
V - Ph - Hz 415-3-50
Condenser
kW (hp) 0.56 (3/4) 0.56 (3/4) 0.75 (1) 1.12 (1.5) 2x0.56 (3/4) 2x0.56 (3/4)
Fan Motor
FLA 1.6 1.6 2 3 1.6 each 1.6 each
Unit Ampacity, Ampere 16.4 22 24 27 26 31
Max. Fuse Size, Ampere 25 35 40 45 36 43
Minimum Wire Size, mm² 4 4 6 10 10 16
Volt 415
Unit Power
Phase 3
Supply
Hz 50
V - Ph - Hz 415-3-50
Blower Motor kW (hp) 0.75 (1) 1.5 (2) 1.5 (2) 1.5 (2) 1.5 (2) 2.24 (3)
FLA 2.4 4.3 4.3 4.3 4.3 4.6
Max. Fuse Size, Ampere 5 10 10 10 10 10
Minimum Wire Size, mm² 1.6 2.5 2.5 2.5 2.5 2.5
Volt 415
Unit Power Phase 3
Supply Hz 50
V - Ph - Hz 415-3-50
Compressor RLA 16.4 each 17.3 each 19.2 each 22.1 each 22.1 each 16.4 each
LRA 95 each 111 each 118 each 118 each 140 each 95 each
V - Ph - Hz 415-3-50
Condenser
kW (hp) 2x 1.10(1.5) 2x 1.10(1.5) 2x 1.10(1.5) 2x 1.10(1.5) 2x 1.10(1.5) 4x 1.10(1.5)
Fan Motor
FLA 3 each 3 each 3 each 3 each 3 each 3 each
Unit Ampacity, Ampere 43 45 49.5 56 56 86
Max. Fuse Size, Ampere 60 63 69 78 78 100
Minimum Wire Size, mm² 16 16 16 25 25 35
Volt 415
Unit Power
Phase 3
Supply
Hz 50
V - Ph - Hz 415-3-50
Blower Motor kW (hp) 3.7 (5) 3.7 (5) 3.7 (5) 3.7 (5) 3.7 (5) 3.7 (5)
FLA 7.2 7.2 7.2 7.2 7.2 7.2
Max. Fuse Size, Ampere 16 16 16 16 16 16
Minimum Wire Size, mm² 2.5 2.5 2.5 2.5 2.5 2.5
LEGEND:
14
OPERATION MANUAL
ELECTRICAL DATA
Volt 415
Unit Power Phase 3
Supply Hz 50
V - Ph - Hz 415-3-50
Compressor RLA-1 12.1 16.4 17.3 19.2 10 12.1
LRA-1 101 95 111 118 74 101
RLA-2 - - - - 10 12.1
LRA-2 - - - - 74 101
Condenser V - Ph - Hz 415-1-50 415-3-50 415-1-50
Fan Motor kW (hp) 0.56(3/4) 0.75(1) 0.75(1) 1.12(1.5) 2x0.75(1) 2x0.75(1)
FLA 1.6 2.4 2.4 3 3.2 3.2
Unit Ampacity, Ampere 16.7 22.9 24 27 28.9 33.6
Max. Fuse Size, Ampere 25 35 40 45 35 45
Minimum Wire Size, mm² 4 6 6 10 10 16
Volt 415
Unit Power
Phase 3
Supply
Hz 50
V - Ph - Hz 415-3-50
Blower Motor kW (hp) 0.75 (1) 1.5 (2) 1.5 (2) 1.5 (2) 1.5 (2) 2.2 (3)
FLA 2.4 4.3 4.3 4.3 4.3 4.6
Max. Fuse Size, Ampere 5 10 10 10 10 10
Minimum Wire Size, mm² 1.5 2.5 2.5 2.5 2.5 2.5
Volt 415
Unit Power Phase 3
Supply Hz 50
V - Ph - Hz 415-3-50
Compressor RLA-1 16.4 17.3 17.3 19.2 22.1 12.1
LRA-1 95 111 111 118 118 101
RLA-2 16.4 17.3 19.2 22.1 22.9 16.4
LRA-2 95 111 118 118 140 95
Condenser V - Ph - Hz 415-3-50
Fan Motor kW (hp) 2x1.12(1.5) 2x1.12(1.5) 2x1.12(1.5) 2x1.12(1.5) 2x1.5(2) 2x1.5(4)
FLA 3 3 3 3 3.8 3.8
Unit Ampacity, Ampere 42.9 44.9 47.3 52.8 58.3 72
Max. Fuse Size, Ampere 50 60 60 70 80 80
Minimum Wire Size, mm² 16 16 16 25 25 35
Volt 415
Unit Power
Phase 3
Supply
Hz 50
V - Ph - Hz 415-3-50
Blower Motor kW (hp) 3.7 (5) 3.7 (5) 3.7 (5) 3.7 (5) 3.7 (5) 3.7 (5)
FLA 7.2 7.2 7.2 7.2 7.2 7.2
Max. Fuse Size, Ampere 15 15 15 15 15 15
Minimum Wire Size, mm² 2.5 2.5 2.5 2.5 2.5 2.5
LEGEND:
FLA: Full Load Amps RLA : Rated Load Amps LRA: Locked Rotor Amps
15
OPERATION MANUAL
ELECTRICAL DATA
Volt 415
Unit Power
Phase 3
Supply 50
Hz
V - Ph - Hz 415-3-50
Compressor RLA 13.6 14.5 16.4 17.9 20.8 13.6 each
LRA 100 100 128 139 144 100 each
V - Ph - Hz 415-3-50
Condenser
kW (hp) 0.75 (1) 0.75 (1) 0.75 (1) 1.12 (1.5) 2x0.56 (3/4) 2x1.12 (1.5)
Fan Motor
FLA 2.43 2.43 2.43 3 1.6 each 3 each
Unit Ampacity, Ampere 19.4 20.6 22.9 25.4 29.2 36.6
Max. Fuse Size, Ampere 30 35 35 40 50 50
Minimum Wire Size, mm² 4 6 6 6 10 16
Volt 415
Unit Power
Phase 3
Supply
Hz 50
V - Ph - Hz 415-3-50
Blower Motor kW (hp) 0.75 (1) 1.5 (2) 1.5 (2) 1.5 (2) 1.5 (2) 2.24 (3)
FLA 2.4 4.3 4.3 4.3 4.3 4.6
Max. Fuse Size, Ampere 5 10 10 10 10 10
Minimum Wire Size, mm² 2.5 2.5 2.5 2.5 2.5 2.5
Volt 415
Unit Power Phase 3
Supply Hz 50
V - Ph - Hz 415-3-50
Compressor RLA 14.5 / 13.6 14.5 each 17.9 each 20.8 / 17.9 20.8 each 24.3 each 27.9 / 24.3
LRA 101 / 100 100 each 139 each 144 / 139 144 each 140 each 173 / 140
V - Ph - Hz 415-3-50
Condenser
kW (hp) 2x 1.12(1.5) 2x 1.12(1.5) 2x 1.10(1.5) 2x 1.10(1.5) 2x 1.10(1.5) 2x 1.10(1.5) 2x 1.5(2.0)
Fan Motor
FLA 3 each 3 each 3 each 3 each 3 each 3 each 3.8 each
Unit Ampacity, Ampere 37.7 38.6 46.3 49.9 52.8 60.7 66.8
Max. Fuse Size, Ampere 50 50 60 70 70 80 90
Minimum Wire Size, mm² 16 16 16 16 25 25 30
Volt 415
Unit Power
Phase 3
Supply
Hz 50
V - Ph - Hz 415-3-50
Blower Motor kW (hp) 3.7(5.0) 3.7(5.0) 3.7(5.0) 3.7(5.0) 3.7(5.0) 3.7(5.0) 3.7(5.0)
FLA 7.2 7.2 7.2 7.2 7.2 7.2 7.2
Max. Fuse Size, Ampere 15 15 16 16 16 16 16
Minimum Wire Size, mm² 2.5 2.5 2.5 2.5 2.5 2.5 2.5
LEGEND:
16
OPERATION MANUAL
17
OPERATION MANUAL
18
OPERATION MANUAL
19
OPERATION MANUAL
UNIT DIMENSIONS
Indoor Unit
Outdoor Unit
20
OPERATION MANUAL
UNIT DIMENSIONS
Outdoor Units
Indoor Unit
21
OPERATION MANUAL
UNIT DIMENSIONS
Indoor Units
Outdoor Unit
22
OPERATION MANUAL
UNIT DIMENSIONS
Outdoor Units
Outdoor Unit
23
OPERATION MANUAL
UNIT DIMENSIONS
Indoor Units
Outdoor Unit
24
OPERATION MANUAL
UNIT DIMENSIONS
Indoor Units
Outdoor Unit
25
OPERATION MANUAL
UNIT DIMENSIONS
Indoor Units
Outdoor Unit
26
OPERATION MANUAL
UNIT DIMENSIONS
Indoor Units
Indoor Unit
27
OPERATION MANUAL
UNIT DIMENSIONS
Outdoor Unit
Outdoor Units
28
OPERATION MANUAL
UNIT DIMENSIONS
Indoor Unit
Outdoor Unit
29
OPERATION MANUAL
UNIT DIMENSIONS
Indoor Units
Outdoor Unit
30
OPERATION MANUAL
UNIT DIMENSIONS
Outdoor Units
Indoor Unit
31
OPERATION MANUAL
UNIT DIMENSIONS
Outdoor Units
Outdoor Unit
32
OPERATION MANUAL
LOAD DISTRIBUTION
LOAD DISTRIBUTION
MODEL A (mm) X1 (kg) X2 (kg)
NGE-076 75 50 57
NGEC-076 75 50 57
NGEF-076 75 50 57
NGE-090 75 58 66
NGEC-090 75 55 63
NGEF-090 75 55 63
NGE-100 75 58 66
NGEC-100 75 58 66
NGEF-100 75 58 66
NGE-120 75 60 68
NGEC-120 75 60 68
NGEF-120 75 60 68
NGE-135 75 63 70
NGEC-135 75 63 70
NGEF-130 75 63 70
NGE-150 75 65 72
NGEC-150 75 65 72
NGEF-150 75 65 72
NGE-175 75 71 77
NGEC-175 75 71 77
NGEF-175 75 71 77
NGE-200 75 72 79
NGEC-200 75 72 79
NGEF-200 75 72 79
33
OPERATION MANUAL
LOAD DISTRIBUTION
LOAD DISTRIBUTION
MODEL A (mm) X1 (kg) X2 (kg)
NGE-240 75 93 101
NGEC-240 75 93 101
NGEF-240 75 93 101
NGE-270 75 98 106
NGEC-270 75 98 106
NGEF-270 75 98 106
NGE-300 75 111 121
NGEC-300 75 111 121
NGEF-300 75 111 121
NGEF-320 75 115 124
NGE-340 75 122 132
NGEC-340 75 122 132
NGEF-340 75 122 132
34
OPERATION MANUAL
LOAD DISTRIBUTION
LOAD DISTRIBUTION
MODEL A (mm) X1 (kg) X2 (kg)
NGC-076 75 85 78
NGCC-076 75 91 84
NGCF-076 75 91 84
NGC-090 75 87 80
NGCC-090 75 93 86
NGCF-090 75 93 86
NGC-100 75 108 99
NGCC-100 75 108 99
NGCF-100 75 108 99
NGC-120 75 113 104
NGCC-120 75 113 104
NGCF-120 75 116 107
NGC-135 75 123 113
NGCC-135 75 123 113
NGCF-130 75 123 113
NGC-150 75 125 116
NGCC-150 75 125 116
NGCF-150 75 130 141
NGE-175 75 132 143
NGCC-175 75 132 143
NGCF-175 75 132 143
NGC-200 75 133 145
NGCC-200 75 168 183
NGCF-200 75 133 145
35
OPERATION MANUAL
LOAD DISTRIBUTION
LOAD DISTRIBUTION
MODEL A (mm) X1 (kg) X2 (kg)
NGC-240 75 172 187
NGCC-240 75 172 187
NGCF-240 75 172 187
NGC-270 75 182 197
NGCC-270 75 182 197
NGCF-270 75 182 197
NGC-300 75 207 224
NGCC-300 75 207 224
NGCF-300 75 207 224
NGCF-320 75 217 234
NGC-340 75 226 245
NGCC-340 75 226 245
NGCF-340 75 222 239
36
OPERATION MANUAL
37
OPERATION MANUAL
38
OPERATION MANUAL
TROUBLE SHOOTING
Use the table in this section to assist and help you in indentifying the cause or causes
of any malfunctions in the unit’s operation. The column headed RECOMMENDED
ACTION will suggest repair procedures.
Disconnect electrical power connection before servicing the unit and allow the
rotating equipment to stop completely. Failure to do so may result in personal
injury or death from electrical shock or entanglement in moving parts.
39
OPERATION MANUAL
7- Excessive suction 1- High heat load Check for source and eliminate
40
OPERATION MANUAL
41
OPERATION MANUAL
MAINTENANCE
Routine maintenance by owner
Regular scheduled maintenance and upkeep to be performed by the user includes
for example: change of the one-time dust filter, clean casing, wash condenser, as
well as testing of the equipment.
You can do some of the periodic maintenance functions for your unit yourself; this
includes cleaning the permanent air filters, cleaning the unit cabinet, cleaning the
condenser coil, and conducting a general unit inspection on a regular basis.
Cleaning the air filter
1. Dismantle the air filter.
2. Clean the air filter (Vacuum cleaner or pure water may be used to clean the
air filter. If the dust accumulation is too heavy, please use soft brush and mild
detergent to clean it and dry out.)
• The air-in side should face up when using vacuum cleaner.
• The air-in side should face down when using water.
3. Re-install the air filter
Maintenance performed by serviceman-cooling season
To keep your unit operating safely and efficiently, the manufacturer recommends
that a qualified serviceman check the entire system at least once each year and
any other time that you feel one is needed. Your serviceman should examine these
areas of your unit:
SR. PREVENTIVE MAINTENANCE INSTRUCTIONS PREVENTIVE ACTIONS
1 Wash Air-Filters Every two months or sooner
2 Wash evaporator coil with water pressure pump Once every year
3 Wash Condenser coil with water pressure pump Once every year
4 Check any abnormal sound from condenser motor Once every year
5 Check any abnormal sound from blower motor Once every year
6 Check and clean electrical box and blower wheel with air blower Once every year
8 Check gas pressure and any oil traces due to leaks Once every year
9 Check for any loose connection in power supply and in safety controls Once every year
Caution: Do not operate the unit without the evaporator fan access panel in place. Reinstall the access panel
after performing any maintenance procedures on the fan. Operating the unit without the access panel properly
installed may result in severe personal injury or death.
42
OPERATION MANUAL
MAINTENANCE
Evaporator’s Side
• Easy access to the evaporator
side with removable panels for
maintenance purpose for the fan,
motor, belt, pulleys, and expansion
device
• Easy access to drain pan for
cleaning
Compressor’s Side
• Easy access to the compressor
side with removable coil guard or
panel for maintenance purpose
for the compressor
• Easy access to condenser fans,
and motors
Electrical Panel
• Easy access to the electri-
cal panels with removable
panel for microprocessor
access and electrical parts
43
OPERATION MANUAL
Group
Block Plot
(Include all
Technicians
Street House #
Names)
Avenue Tel. # Commissioning Date
Unit Details
YES YES
PRE - START CHECKS: NO (Explain)
CHC CHE
1. Clearances as per RIC's specifications
7. Replaced All Panels and Screws Trained Owner About Unit Operation
Materials Consumed:
Time Left RIC Time Arrived RIC Time Arrived Site Time Left Site
Copy # 1: Customer
Copy # 2: A/C Maintenance File
Copy # 3: QC (if Coolex Machine)
44
OPERATION MANUAL
NOTES
45
OPERATION MANUAL
COOLEX DISTRIBUTORS
Sultanate of Oman United Arab Emirates UAE Kingdom of Bahrain
Al Noor Projects Engineering & Trading Obaid Humaid Al-Tayer Engineering Y.K. Almoayyed & Sons
Company Division - Al Tayer Group Address : EHAD – Project Department, Sehla
Address: Third Floor, Oman House Address : Dubai – UAE, PO Box 2623 Workshop P.O. Box 143, Manama,
P.O. Box: 1047, P.C: 114 Hay Tel : +971 4 2011272 Kingdom of Bahrain
Fax : +971 4 2825008 Tel : +973 17 400 444, Extn. 205
Al Mina - Muscat
Mobile : +971 50 3500747 Direct : +973 17 405 250
Tel : +968 24709402/403 Email : [email protected] Fax : +973 17 400 388
Fax : +968 24709401 Website : www.altayer.com Email : [email protected]
Email : [email protected] Email : [email protected]
Email : [email protected] Website : www.almoayyed.com
Website : www.alnoorprojects.com
Please contact Sales and Marketing Department CENTRAL AIR CONDITIONING AND SPLIT UNIT
[email protected] for specific information on the Coolex continuously works towards the improvement of
current design and specifications.
its products. Hence, the design and specifications of the
Ref no.: MP 23-5-000
ordered product may vary without prior notice.
COOLEX is a subsidiary of the RIC Group
46
دليل الرتكيب و الت�شغيل و ال�صيانة
46
دليل الرتكيب و الت�شغيل و ال�صيانة
املالحظات
45
دليل الرتكيب و الت�شغيل و ال�صيانة
Group
Block Plot
(Include all
Technicians
Street House #
Names)
Avenue Tel. # Commissioning Date
Unit Details
YES YES
PRE - START CHECKS: NO (Explain)
CHC CHE
1. Clearances as per RIC's specifications
7. Replaced All Panels and Screws Trained Owner About Unit Operation
Materials Consumed:
Time Left RIC Time Arrived RIC Time Arrived Site Time Left Site
Copy # 1: Customer
Copy # 2: A/C Maintenance File
Copy # 3: QC (if Coolex Machine)
44
دليل الرتكيب و الت�شغيل و ال�صيانة
ال�صيانة
جانب املبخر
• �سهولة الو�صول �إىل جانب املبخر مع لوحات قابلة
للإزالة لأغرا�ض ال�صيانة للمروحة واملحرك واحلزام
والبكرات وجهاز التمديد
• �سهولة الو�صول �إىل ا�ستنزاف عموم للتنظيف
جانب ال�ضاغط
• �سهولة الو�صول �إىل جانب ال�ضاغط مع واقي �أو لوحة
ملف قابل للإزالة لغر�ض ال�صيانة لل�ضاغط
• �سهولة الو�صول �إىل مراوح املكثف ،واملحركات
اللوحة الكهربائية
• �سهولة الو�صول �إىل اللوحات الكهربائية مع لوحة
قابلة للإزالة للو�صول �إىل املعاجلات الدقيقة والأجزاء
الكهربائية
43
دليل الرتكيب و الت�شغيل و ال�صيانة
ال�صيانة
ال�صيانة الدورية من امل�ستخدم
ال�صيانة املنتظمة وال�صيانة التي يتعني القيام بها من قبل امل�ستخدم وي�شمل تغيري فلرت الغبار ملرة واحدة،
وتنظيف الوحدة ،وغ�سل املكثف ،وكذلك اختبار املعدات .ميكنك القيام ببع�ض وظائف ال�صيانة الدورية للوحدة
بنف�سك .وهذا ي�شمل تنظيف مر�شحات الهواء دائمة ،وتنظيف وحدة ،وتنظيف ملف املكثف ،و�إجراء تفتي�ش عام
علي الوحدة بانتظام.
ال تقم بت�شغيل الوحدة قبل التاكد من احكام اغالق جميع ابوابها لتفادي حدوث اي ا�صابات او وفاة
لال�شخا�ص
42
دليل الرتكيب و الت�شغيل و ال�صيانة
41
دليل الرتكيب و الت�شغيل و ال�صيانة
40
دليل الرتكيب و الت�شغيل و ال�صيانة
حتديد االعطال
ت�أكد من ف�صل التيار الكهربائي قبل عمل اي �صيانة للوحدة لتفادي حدوث �أي ا�صابة او وفاة ناجت من
ال�صدمة الكهربائية.
طريق اال�صالح ال�سبب العطل
تاكد من تو�صيل م�صدر الكهرباء - 1ال يوجد كهرباء وا�صلة للوحدة
39
دليل الرتكيب و الت�شغيل و ال�صيانة
38
دليل الرتكيب و الت�شغيل و ال�صيانة
37
دليل الرتكيب و الت�شغيل و ال�صيانة
توزيع الأحمال
توزيع االحمال
)X2 (kg )X1 (kg )A (mm املوديل
187 172 75 NGC-240
187 172 75 NGCC-240
187 172 75 NGCF-240
197 182 75 NGC-270
197 182 75 NGCC-270
197 182 75 NGCF-270
224 207 75 NGC-300
224 207 75 NGCC-300
224 207 75 NGCF-300
234 217 75 NGCF-320
245 226 75 NGC-340
245 226 75 NGCC-340
239 222 75 NGCF-340
36
دليل الرتكيب و الت�شغيل و ال�صيانة
توزيع الأحمال
توزيع االحمال
X2 (kg) X1 (kg) A (mm) املوديل
78 85 75 NGC-076
84 91 75 NGCC-076
84 91 75 NGCF-076
80 87 75 NGC-090
86 93 75 NGCC-090
86 93 75 NGCF-090
99 108 75 NGC-100
99 108 75 NGCC-100
99 108 75 NGCF-100
104 113 75 NGC-120
104 113 75 NGCC-120
107 116 75 NGCF-120
113 123 75 NGC-135
113 123 75 NGCC-135
113 123 75 NGCF-130
116 125 75 NGC-150
116 125 75 NGCC-150
141 130 75 NGCF-150
143 132 75 NGE-175
143 132 75 NGCC-175
143 132 75 NGCF-175
145 133 75 NGC-200
183 168 75 NGCC-200
145 133 75 NGCF-200
35
دليل الرتكيب و الت�شغيل و ال�صيانة
توزيع الأحمال
توزيع االحمال
)X2 (kg )X1 (kg )A (mm املوديل
101 93 75 NGE-240
101 93 75 NGEC-240
101 93 75 NGEF-240
106 98 75 NGE-270
106 98 75 NGEC-270
106 98 75 NGEF-270
121 111 75 NGE-300
121 111 75 NGEC-300
121 111 75 NGEF-300
124 115 75 NGEF-320
132 122 75 NGE-340
132 122 75 NGEC-340
132 122 75 NGEF-340
34
دليل الرتكيب و الت�شغيل و ال�صيانة
توزيع الأحمال
توزيع االحمال
X2 (kg) X1 (kg) A (mm) املوديل
57 50 75 NGE-076
57 50 75 NGEC-076
57 50 75 NGEF-076
66 58 75 NGE-090
63 55 75 NGEC-090
63 55 75 NGEF-090
66 58 75 NGE-100
66 58 75 NGEC-100
66 58 75 NGEF-100
68 60 75 NGE-120
68 60 75 NGEC-120
68 60 75 NGEF-120
70 63 75 NGE-135
70 63 75 NGEC-135
70 63 75 NGEF-130
72 65 75 NGE-150
72 65 75 NGEC-150
72 65 75 NGEF-150
77 71 75 NGE-175
77 71 75 NGEC-175
77 71 75 NGEF-175
79 72 75 NGE-200
79 72 75 NGEC-200
79 72 75 NGEF-200
33
دليل الرتكيب و الت�شغيل و ال�صيانة
ابعاد الوحدات
الوحدة اخلارجية
الوحدة اخلارجية
32
دليل الرتكيب و الت�شغيل و ال�صيانة
ابعاد الوحدات
الوحدة الداخلية
الوحدة اخلارجية
31
دليل الرتكيب و الت�شغيل و ال�صيانة
ابعاد الوحدات
الوحدة اخلارجية
الوحدة اخلارجية
30
دليل الرتكيب و الت�شغيل و ال�صيانة
ابعاد الوحدات
الوحدة اخلارجية
الوحدة الداخلية
29
دليل الرتكيب و الت�شغيل و ال�صيانة
ابعاد الوحدات
الوحدة اخلارجية
الوحدة الداخلية
28
دليل الرتكيب و الت�شغيل و ال�صيانة
ابعاد الوحدات
الوحدة الداخلية
الوحدة اخلارجية
27
دليل الرتكيب و الت�شغيل و ال�صيانة
ابعاد الوحدات
الوحدة اخلارجية
الوحدة الداخلية
26
دليل الرتكيب و الت�شغيل و ال�صيانة
ابعاد الوحدات
الوحدة اخلارجية
الوحدة الداخلية
25
دليل الرتكيب و الت�شغيل و ال�صيانة
ابعاد الوحدات
الوحدة اخلارجية
الوحدة الداخلية
24
دليل الرتكيب و الت�شغيل و ال�صيانة
ابعاد الوحدات
الوحدة اخلارجية
الوحدة الداخلية
23
دليل الرتكيب و الت�شغيل و ال�صيانة
ابعاد الوحدات
الوحدة اخلارجية
الوحدة اخلارجية
22
دليل الرتكيب و الت�شغيل و ال�صيانة
ابعاد الوحدات
الوحدة الداخلية
الوحدة الداخلية
21
دليل الرتكيب و الت�شغيل و ال�صيانة
ابعاد الوحدات
الوحدة الداخلية
الوحدة اخلارجية
20
دليل الرتكيب و الت�شغيل و ال�صيانة
19
دليل الرتكيب و الت�شغيل و ال�صيانة
18
دليل الرتكيب و الت�شغيل و ال�صيانة
17
دليل الرتكيب و الت�شغيل و ال�صيانة
البيانات الكهربائية
NGCF-150 NGCF-130 NGCF-120 NGCF-100 NGCF-090 NGCF-076 الوحدة اخلارجية
415 اجلهد و�صالت الكهرباء
3 الطور
50 الرتدد الرئي�سة
415-3-50 فولت-طور-هرتز
13.6 each 20.8 17.9 16.4 14.5 13.6 امبري حمل الت�شغيل ال�ضاغط
100 each 144 139 128 100 100 امبري حب�س الدوار
415-3-50 فولت-طور-هرتز حمرك مروحة
)2x1.12 (1.5 )2x0.56 (3/4 )1.12 (1.5 )0.75 (1 )0.75 (1 )0.75 (1 الطاقة امل�ستهلكة (كيلو واط)
3 each 1.6 each 3 2.43 2.43 2.43 امبري احلمل الكامل املكثف
36.6 29.2 25.4 22.9 20.6 19.4 ال�سعة االمبريية للوحدة (امبري)
50 50 40 35 35 30 اكرب حجم للفيوز (امبري)
16 10 6 6 6 4 اقل م�ساحة مقطع لل�سلك (مم)2
NGEF-150 NGEF-130 NGEF-120 NGEF-100 NGEF-090 NGEF-076 الوحدة الداخلية
415 اجلهد و�صالت الكهرباء
3 الطور
50 الرتدد الرئي�سة
415-3-50 فولت-طور-هرتز
)2.24 (3 )1.5 (2 )1.5 (2 )1.5 (2 )1.5 (2 )0.75 (1 الطاقة امل�ستهلكة (كيلو واط) مروحة املحرك
4.6 4.3 4.3 4.3 4.3 2.4 امبري احلمل الكامل
10 10 10 10 10 5 اكرب حجم للفيوز (امبري)
2.5 2.5 2.5 2.5 2.5 2.5 اقل م�ساحة مقطع لل�سلك (مم)2
LEGEND:
16
دليل الرتكيب و الت�شغيل و ال�صيانة
البيانات الكهربائية
NGCC-150 NGCC-135 NGCC-120 NGCC-100 NGCC-090 NGCC-076 الوحدة اخلارجية
415 اجلهد و�صالت الكهرباء
3 الطور
50 الرتدد الرئي�سة
415-3-50 فولت-طور-هرتز
12.1 10 19.2 17.3 16.4 12.1 امبري حمل الت�شغيل1
101 74 118 111 95 101 امبري حب�س الدوار1 ال�ضاغط
12.1 10 - - - - امبري حمل الت�شغيل2
101 74 - - - - امبري حب�س الدوار2
415-1-50 415-3-50 415-1-50 فولت-طور-هرتز حمرك مروحة
)2x0.75(1 )2x0.75(1 )1.12(1.5 )0.75(1 )0.75(1 )0.56(3/4 الطاقة امل�ستهلكة (كيلو واط)
3.2 3.2 3 2.4 2.4 1.6 امبري احلمل الكامل املكثف
33.6 28.9 27 24 22.9 16.7 ال�سعة االمبريية للوحدة (امبري)
45 35 45 40 35 25 اكرب حجم للفيوز (امبري)
16 10 10 6 6 4 اقل م�ساحة مقطع لل�سلك (مم)2
LEGEND:
FLA: Full Load Amps RLA : Rated Load Amps RLA: Rated Load Amps
15
دليل الرتكيب و الت�شغيل و ال�صيانة
البيانات الكهربائية
NGC-150 C2 NGC-135 C2 NGC-120 C2 NGC-100 C2 NGC-090 C2 NGC-076 A2 الوحدة اخلارجية
415 اجلهد و�صالت الكهرباء
3 الطور
50 الرتدد الرئي�سة
415-3-50 فولت-طور-هرتز
12.1 each 10 each 19.2 17.3 16.4 12.1 امبري حمل الت�شغيل ال�ضاغط
101 each 74 each 118 111 95 101 امبري حب�س الدوار
415-3-50 فولت-طور-هرتز حمرك مروحة
)2x0.56 (3/4 )2x0.56 (3/4 )1.12 (1.5 )0.75 (1 )0.56 (3/4 )0.56 (3/4 الطاقة امل�ستهلكة (كيلو واط)
1.6 each 1.6 each 3 2 1.6 1.6 امبري احلمل الكامل املكثف
31 26 27 24 22 16.4 ال�سعة االمبريية للوحدة (امبري)
43 36 45 40 35 25 اكرب حجم للفيوز (امبري)
16 10 10 6 4 4 اقل م�ساحة مقطع لل�سلك (مم)2
NGE-150 C2 NGE-135 C2 NGE-120 C2 NGE-100 C2 NGE-090 C2 NGE-076 A2 الوحدة الداخلية
415 اجلهد و�صالت الكهرباء
3 الطور
50 الرتدد الرئي�سة
415-3-50 فولت-طور-هرتز
)2.24 (3 )1.5 (2 )1.5 (2 )1.5 (2 )1.5 (2 )0.75 (1 الطاقة امل�ستهلكة (كيلو واط) مروحة املحرك
4.6 4.3 4.3 4.3 4.3 2.4 امبري احلمل الكامل
10 10 10 10 10 5 اكرب حجم للفيوز (امبري)
2.5 2.5 2.5 2.5 2.5 1.6 اقل م�ساحة مقطع لل�سلك (مم)2
NGC-340 C2 NGC-300 C2 NGC-270 A2 NGC-240 A2 NGC-200 A2 NGC-175 A2 الوحدة اخلارجية
415 Volt
Phase Unit Power
3
50 Hz Supply
415-3-50 V - Ph - Hz
16.4 each 22.1 each 22.1 each 19.2 each 17.3 each 16.4 each RLA Compressor
95 each 140 each 118 each 118 each 111 each 95 each LRA
415-3-50 V - Ph - Hz
Condenser
)4x 1.10(1.5 )2x 1.10(1.5 )2x 1.10(1.5 )2x 1.10(1.5 )2x 1.10(1.5 )2x 1.10(1.5 )kW (hp
Fan Motor
3 each 3 each 3 each 3 each 3 each 3 each FLA
86 56 56 49.5 45 43 Unit Ampacity, Ampere
100 78 78 69 63 60 Max. Fuse Size, Ampere
35 25 25 16 16 16 Minimum Wire Size, mm²
NGE-340 C2 NGE-300 C2 NGE-270 A2 NGE-240 A2 NGE-200 A2 NGE-175 A2 الوحدة الداخلية
415 اجلهد و�صالت الكهرباء
3 الطور
50 الرتدد الرئي�سة
415-3-50 فولت-طور-هرتز
)3.7 (5 )3.7 (5 )3.7 (5 )3.7 (5 )3.7 (5 )3.7 (5 الطاقة امل�ستهلكة (كيلو واط) مروحة املحرك
7.2 7.2 7.2 7.2 7.2 7.2 امبري احلمل الكامل
16 16 16 16 16 16 اكرب حجم للفيوز (امبري)
2.5 2.5 2.5 2.5 2.5 2.5 اقل م�ساحة مقطع لل�سلك (مم)2
LEGEND:
14
دليل الرتكيب و الت�شغيل و ال�صيانة
م�ساحات اخلدمة
م�ساحة اخلدمة
كل الأبعاد باملم
• تثبيت قواعد مطاط �أ�سفل وحدة التكييف تعمل على �إمت�صا�ص الأهتزاز الناجت من الوحدة .
• تثبيت وحدة التكييف يف مكان م�ستقيم و �صلب يدعم وزن الوحدة .
• عمل م�صيدة للماء �إذا كان ماء الت�صريف �أطول من � 2أن�ش.
• جميع الأ�سالك الكهربائية يجب �أن تكون وفقا للمقاي�س العاملية
• م�ساحة اخلدمة يجب �أن تقدم كما يف ال�شكل �أعاله � .أي عائق امام �أو جنب وحدة التكييف ي�سبب م�شاكل يف
الفح�ص او عمل الوحدة بالو�ضع الطبيعي �أ عدم التمكن من �صيانة الوحدة �أو ما �شابه.
13
دليل الرتكيب و الت�شغيل و ال�صيانة
الرتكيب والت�شغيل
الوحدة اخلارجية
12
دليل الرتكيب و الت�شغيل و ال�صيانة
الرتكيب والت�شغيل
جتهيز ال�سقف للرتكيب
-ثقب فتحات التثبيت بال�سقف طبقا البعاد الوحدات املعطاة.
-يجب ترك م�سافة كافية من جانب املاكينة لل�سماح بتو�صيل خطوط غاز التربيد.
-يجب ا�ستخدام عدد 4ق�ضبان تثبيت بقطر ال يقل عن 8مم للتثبني مع التاكد من قوة و�سالمة التثبيت بال�سقف
والوحدة.
-تاكد من و�ضع ما�ص لل�صدمات مع ملحقات التثبيت الالزمة للتاكد من �صحة تثبيت الوحدة.
-يجب التاكد من اعداد م�ستوي تثبيت الوحدة جيدا لل�سماح بت�صريف املياه املكثفة من الهواء املربد.
-عند وجود م�سافة كافية ميكن و�ضع لوح عازل بني ال�سقف والوحدة.
خطوات الرتكيب
-تاكد من �سالمة م�سارات خطوط الغاز
-تاكد من تقليل الفقد يف ال�ضغط عن طريق مراعاة ا�ستقامة خطوط الغاز وقلة عدد امللحقات بها
-قم بامالة خط ال�سحب اخلارج من الوحدة لت�سهيل عودة الزيت ايل الوحدة اخلارجية
-تاكد من �سالمة خطوط الغاز من اي عوائق ل�سريان الزيت
-قبل احلفر باحلوائط لتثبيت خطوط الغاز تاكد من خلو امل�سارات من اية انابيب او و�صالت كهرباء اخرى
و�صالت اللحام
-تتم و�صالت اللحام يف موقع الرتكيب مع مراعاة اتباعها لكافة املوا�صفات القيا�سية للرتكيب
-قم بازالة ال�سدادات من و�صالت االنابيب بالوحدة بعد التاكد من جهازية خطوط الغاز واالنتهاء منها
جميعا حلماية اخلطوط من تكون الرطوبة بداخلها.
-ا�ستخدم انابيب نحا�سية جافة للرتكيب
-ا�ستخدم حلام الف�ضة وجتنب الت�سخني الزائد لو�صالت االنابيب مع مراعاة ا�ستخدام النيرتوجني اثناء اللحام
لتجنب حدوث االك�سدة
عزل خط الغاز
-ملنع فقد احلرارة وتكثيف بخار املاء يجب عزل جميع خطوط الغاز
11
دليل الرتكيب و الت�شغيل و ال�صيانة
الرتكيب والت�شغيل
10
دليل الرتكيب و الت�شغيل و ال�صيانة
الرتكيب والت�شغيل
5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 1/2 7/8 1/2 7/8 1/2 7/8 076
5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 090
5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 100
7/8 1-3/8 7/8 1-3/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 120
5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 1/2 7/8 1/2 7/8 1/2 7/8 135
5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 1/2 7/8 1/2 7/8 1/2 7/8 150
5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 175
5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 200
7/8 1-3/8 7/8 1-3/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 240
7/8 1-3/8 7/8 1-3/8 7/8 1-3/8 5/8 1-3/8 5/8 1-3/8 5/8 1-3/8 270
7/8 1-3/8 7/8 1-3/8 7/8 1-3/8 7/8 1-3/8 5/8 1-3/8 5/8 1-3/8 300
5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 1/2 1 1/8 1/2 1-1/8 340
5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 090
5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 100
7/8 1-3/8 7/8 1-3/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 120
7/8 1-3/8 7/8 1-3/8 7/8 1-3/8 5/8 1-3/8 5/8 1-3/8 5/8 1-3/8 130
5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 1/2 7/8 1/2 7/8 1/2 7/8 150
5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 175
5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 200
7/8 1-3/8 7/8 1-3/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 5/8 1-1/8 240
7/8 1-3/8 7/8 1-3/8 7/8 1-3/8 5/8 1-3/8 5/8 1-3/8 5/8 1-3/8 270
7/8 1-3/8 7/8 1-3/8 7/8 1-3/8 7/8 1-3/8 5/8 1-3/8 5/8 1-3/8 300
7/8 1-3/8 7/8 1-3/8 7/8 1-3/8 7/8 1-3/8 5/8 1-3/8 5/8 1-3/8 320
7/8 1-3/8 7/8 1-3/8 7/8 1-3/8 7/8 1-3/8 5/8 1-3/8 5/8 1-3/8 340
9
دليل الرتكيب و الت�شغيل و ال�صيانة
الرتكيب والت�شغيل
التو�صيالت الكهربائية
ا�ستخدم اال�سالك النحا�سية املعزولة .مقطع اال�سالك املطلوبة يتغري طبقا الطوال اال�سالك .يجب ان تتطابق
و�صالت الكهرباء واخلامات امل�ستخدمة مع متطلبات وتعليمات الكهرباء ببلد الرتكيب .تاكد من مطابقة
موا�صفات الوحدةالكهربائية مع املتطلبات املحلية تركيبات الكهرباء يجب ان تت�ضمن مفتاح ف�صل الكهرباء طبقا
للموا�صفات املحلية
8
دليل الرتكيب و الت�شغيل و ال�صيانة
الت�سميات
NGC F 175 C 2
Code Description
A First Series
B Second Series
C Third Series
Refrigerant
F : R410A
C : R407C
Blank : R22
7
دليل الرتكيب و الت�شغيل و ال�صيانة
اعتبارات ال�سالمة
الرتكيب وبدء الت�شغيل و�صيانة معدات تكييف الهواء ميكن �أن تكون خطرة ب�سبب �ضغوط النظام،
واملكونات الكهربائية و موقع املعدات.فقط فنيي الرتكيب والت�شغيل املدربني وامل�ؤهلني هم من ي�سمح
لهم تركيب و ت�شغيل الوحدة.
عند العمل مع املعدات ،راقب االحتياطات يف الدليل و كذلك العالمات ،واملل�صقات والعالمات على
الوحدة.
�إبقاء جميع الأبواب وامل�سامري املثبتة بالوحدة اثناء نقل الوحدة وتركيب جماري الهواء .وهذا
�سي�ساعد على �ضمان �أن تبقى مكونات الوحدة متما�سكة لت�سهيل فتح ابواب الوحدة بعد تركيب
جماري الهواء.
اتبع جميع قوانني ال�سالمة.
قبل الت�شغيل ،ت�أكد من ت�أري�ض الوحدة ب�شكل �صحيح ملنع الإ�صابة �أو املوت من �صدمة كهربائية.
ال تقم بتنفي�س �صمامات تخفيف �ضغط غازات التربيد داخل املبنى� .صمامات تخفيف ال�ضغط يجب
ان يتم تنفي�سها يف الهواء الطلق.
عند اللحام تاكد من وجود قما�ش التربيد وطفايات احلريق بالقرب منك.
ال ت�ضع الوحدات علي جانبها اثناء النقل والرتكيب لتاليف حدوث تلف مبكونات الوحدات.
عند تركيب م�سامري التثبيت بالوحدة تاكد اوال من داخل الوحدة ان امل�سامري لن ت�صيب خطوط
الكهرباء او انابيب غاز التربيد.
يجب �أال تعمل وحدة خارج حدود الت�صميم املحددة يف هذا الدليل.
ال�شركة امل�صنعة لن تكون م�س�ؤولة عن �أي �إ�صابة �أو �ضرر ناجم عن تركيب وت�شغيل �أو �صيانة غري
�صحيحة الناجتة عن عدم اتباع الإجراءات والتعليمات املف�صلة يف هذا الدليل.
6
دليل الرتكيب و الت�شغيل و ال�صيانة
ال�ضمان
ت�ضمن �شركة �صناعات التربيد والتخزين خلو هذا املنتج من العيوب يف �صنعة امل�صنع واملواد يف ظل اال�ستخدام
العادي واخلدمة .و�سوف تقوم با�صالح �أو ا�ستبدال الأجزاء التي ثبت وجود عيوب فيها كما يلي:
.١خم�س �سنوات لل�ضواغط املحكمة
� .٢سنة واحدة جلميع الأجزاء الأخرى
يتم قيا�س الفرتات الزمنية من تاريخ بدء التثبيت � ،أو ثالثة �أ�شهر من تاريخ الإر�سال �أيهما ي�أتي �أو ًال .ما مل يكن
ال�ضمان املمتد متفق عليه كجزء من العقد.
اال�ستثناءات
العنا�صر التالية لي�ست عيو ًبا يف الت�صنيع وال يغطيها �ضمان :COOLEX
.1الأ�ضرار الناجتة عن املناولة �أثناء النقل والعبور والرتكيب و خدمة املنتج من قبل الآخرين.
.2التلف �أو العطل الناجت عن انقطاع التيار الكهربائي عن الوحدة ( ٪10 ±من الفولتية املقدرة) واملخاطر
الكهربائية.
.3ال�ضرر الناجت عن تطبيق خمتلف مت ت�صميمه من �أجله.
.4ال�ضرر �أو العطل الناجت عن الإمداد غري ال�سليم و توزيع الهواء العائد من و�إىل املنتج.
.5الأ�ضرار الناجتة عن خلل يف الرتمو�ستات �أو اال�ستخدام اخلاطئ �أو االت�صال اخلاطئ بالرثمو�ستات.
.٦تلف الأعطال الناجتة عن ال�صيانة غري ال�سليمة للوحدة.
تو�صيالت �أ�سالك كهربائية و � /أو حتكم غري �صحيح وموقع ترمو�ستات الغرفة.
.٧تركيب وحدات التغليف من ماركات �أخرى.
.٨تركيب و�صلة �أنابيب غري مو�صى بها وف�شل تركيب «م�صيدة الزيت» �أو -« U-trapلوحدات االنق�سام املركزية.
.٩الأ�ضرار الناجتة عن حادث � ،إ�ساءة ،حريق ،تعديل غري م�صرح به ،التخزين غري ال�سليم وال�صواعق والكوارث
الطبيعية.
.١٠التلف �أو العطل الناجت عن الرتكيبات الكهربائية �أو امليكانيكية للمكونات اخلارجية للوحدة.
.١١التلف �أو العطل الناجت عن الرتكيب بحجم �أقل �أو �أكرث قدرة لوحدة تكييف الهواء من قبل الآخرين.
5
دليل الرتكيب و الت�شغيل و ال�صيانة
عزيزي العميل
�شكرا الختيارك وحدات تكييف كولك�س املدجمة رجاء ت�صفح الدليل بعناية الحتوائه علي معلومات هامة خا�صة
بالرتكيب والت�شغيل وال�صيانة للوحدات ل�ضمان اطول فرتة خدمة للوحدة.
اال�ستالم
عند و�صول الوحدة وقبل التوقيع علي اوراق اال�ستالم يرجي التحقق من �سالمة الوحدة وت�سجيل اي �ضرر حلق
بالوحدة باوراق اال�ستالم وار�سلها ايل اخر من قام بنقل الوحدات
التفتي�ش
يرجي التحقق من ال�شحنة امل�ستلمة طبقا لقائمة ال�شحن امللحقة بعد التحقق من الوحدة يرجي التاكد من
حماية الوحدة ب�شكل �صحيح اثناء التخزين او النقل ايل موقع الرتكيب .هذه اخلطوة مهمة للحفاظ على
�ضمان وحماية الوحدة �ضد الأحوال اجلوية ال�سيئة �أو ال�سرقة �أو التخريب يف موقع العمل.
تلف بالوحدات
قم بفح�ص الوحدة عند اال�ستالم للتاكد من خلوها من اي تلف .يف حالة وجود اي تلف او �ضرر بالوحدة قم
برفع �شكوي فورا �ضد �شركة النقل وحتقق من �شركة التامني اخلا�صة بك
4
دليل الرتكيب و الت�شغيل و ال�صيانة
عام
مالحظة :لت�سليط ال�ضوء على البيانات الإ�ضافية التي قد تكون مفيدة لك.
حتذير :ي�ستخدم لتحديد املخاطر التي ميكن �أن ت�ؤدي �إىل الوفاة او تدمري او تلف املاكينة.
تنبيه:وي�ستخدم لتحديد املخاطر التي ميكن �أن ت�ؤدي �إىل �إ�صابة �شخ�صية او خلل باملاكينة.
هذا الدليل �سوف ي�ضمن الت�شغيل ال�سليم و اطول عمر ت�شغيلي للوحدة
جميع الإجراءات الواردة يف هذا الدليل ،مثل تركيب وت�شغيل وال�صيانة يجب �أن يقوم بها �شخ�ص
مدرب وم�ؤهل.
ملزيد من املعلومات يرجي االت�صال باملوزع املعتمد لكولك�س ببلدك او االت�صال بامل�صنع.
3
دليل الرتكيب و الت�شغيل و ال�صيانة
الفهر�س
05 ال�ضمان................................................................................................................
07 الت�سميات..............................................................................................................
42 ال�صيانة................................................................................................................
45 املالحظات..............................................................................................................
2
دليل الرتكيب و الت�شغيل و ال�صيانة
www.coolex.com.kw
50 Hz