WEEK03

The document outlines a student profile and a company profile for ROCK WILLIAN CONSTRUCTION AND SUPPLY, detailing the student's activities and supervisor's remarks during an internship from June 26 to July 05, 2023. It includes specific tasks such as site visits, discussions on construction terminology, and observations of ongoing projects. The document confirms compliance with the work schedule and includes signatures from both the student and supervisor.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views2 pages

WEEK03

The document outlines a student profile and a company profile for ROCK WILLIAN CONSTRUCTION AND SUPPLY, detailing the student's activities and supervisor's remarks during an internship from June 26 to July 05, 2023. It includes specific tasks such as site visits, discussions on construction terminology, and observations of ongoing projects. The document confirms compliance with the work schedule and includes signatures from both the student and supervisor.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

ANNEX “D”

• •

STUDENT PROFILE
Name of Student Contact Number
Program of Study E-mail
Address
COMPANY PROFILE
Company Name ROCK WILLIAN CONSTRUCTION AND SUPPLY Contact Number 708- 17717
Company Address DAHLIA ST. PATRICIA HOMES SUBD., BRGY. GRANADA BACOLOD CITY, NEGROS OCCIDENTAL 6100
Name of Supervisor ENGR. JOEL DELA LUNA LUCES Contact Number 0922 835 2441
Designation Department CONSTRUCTION

02 June 26, 2023 June 30, 2023


COMPLIANT
WITH WORK SUPERVISOR’
DATE TIME ACTIVITIES SCHEDULE SREMARKS
(YES/NO)
July 03, 2023 • Time in
• Discussing building layout or Residential
house
• Site visiting the on-going project at Fountain NO
Grove with Eng. Joel Dela Luna Luces
• Group Discussion
• Site observation the on-going projects and
discussing the different project layouts at
Fountain Grove.
1. Ashlyn House
2. Brielle House
3. Charlotte House
4. Dalton House
• Time out

June 04,2023
• Time in
• Discussing about the terminologies in
Construction Field
• Site visiting the on-going project at Fountain
Grove with Eng. Joel Dela Luna Luces
• Group Discussion
• Site observation the on-going project in
Fountain Grove.
1. Soil Treatment
• Group Discussion with Engr. Joel Luces
regarding the soil treatment
• Time out

July 05, 2023 • Time in


• Discussing about the Construction works
• Site visiting the on-going project at Fountain
Grove with Eng. Joel Dela Luna Luces
• Group Discussion
• Site observation the on-going project in
Fountain Grove.
• Group Discussion
• Time out
ANNEX “D”
COMPLIANT
WITH WORK SUPERVISOR’
DATE TIME ACTIVITIES SCHEDULE SREMARKS
(YES/NO)

Conforme:

Student’s Signature overprinted name Supervisor’s Signature overprinted