WEEK01

The document outlines the student profile and company profile for an internship at Rock Willian Construction and Supply, detailing the student's contact information and the supervisor's details. It includes a log of activities from June 19 to June 23, 2023, highlighting various construction fundamentals, site visits, and group discussions. Each day's activities are marked as compliant with the work schedule, indicating successful completion of tasks assigned.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views3 pages

WEEK01

The document outlines the student profile and company profile for an internship at Rock Willian Construction and Supply, detailing the student's contact information and the supervisor's details. It includes a log of activities from June 19 to June 23, 2023, highlighting various construction fundamentals, site visits, and group discussions. Each day's activities are marked as compliant with the work schedule, indicating successful completion of tasks assigned.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

ANNEX “D”

• •

STUDENT PROFILE
Name of Student Contact Number
Program of Study E-mail
Address
COMPANY PROFILE
Company Name ROCK WILLIAN CONSTRUCTION AND SUPPLY Contact Number 708- 17717
Company Address DAHLIA ST. PATRICIA HOMES SUBD., BRGY. GRANADA BACOLOD CITY, NEGROS OCCIDENTAL 6100
Name of Supervisor ENGR. JOEL DELA LUNA LUCES Contact Number 0922 835 2441
Designation Department CONSTRUCTION

01 June 19, 2023 June 23, 2023


COMPLIANT
WITH WORK SUPERVISOR’
DATE TIME ACTIVITIES SCHEDULE SREMARKS
(YES/NO)
June 19, 2023 • Time in
• Orientation about the Company
• Overview about Building Construction
1. Fundamentals of Building Construction NO
2. Estimating Project
3. Checklist of Starting a Project
4. Rule of C.E. for Building Prep/ Permits
5. Bidding Process
• Discussing the different measurements of
Reinforcement bars and Concrete used in
Constructions
• Site visiting the on-going projects and
discussing the different project layouts at
Fountain Grove.
1. Ashlyn House
2. Brielle House
3. Charlotte House
4. Dalton House
• Introducing OJT students in Fountain Grove
Staffs
• Time out

• Time in
June 20,2023 • Discussing the Fundamentals of Building
Construction
• Materials in Ceiling Plan
1. Wall angle
2. Metal Furring
3. Carrying Channel
4. Furring Clip
• Site visiting at Fountain Grove with Engr. Joel
Dela Luna Luces
• Group Discussion about the task being
assigned
• Measuring the elevation of doors, windows,
stairs and floors of the on-going project.
ANNEX “D”
COMPLIANT
WITH WORK SUPERVISOR’
DATE TIME ACTIVITIES SCHEDULE SREMARKS
(YES/NO)
• Group discussion after the task assigned.
• Site observation in another on-going project
at Fountain Grove
• Time out

June 21, 2023 • Time in


• Reporting about yesterday observation in o-
going project
• Discussing the Fundamentals of Building
Construction
• Materials and Component of Concrete
1. Ratio of Mortar Mix
2. Ratio of Plastering
3. Measurement of 1 cubic of Concrete
4. Capacity of concrete
• Site visiting at Fountain Grove with Engr. Joel
Dela Luna Luces
• Group Discussion about the task being
assigned
• Site observation in on-going charlotte house
and another on-going project at Fountain
Grove
• Group Discussion about the task being
assigned
• Time out

June 22, 2023


• Time in
• Reporting about yesterday observation in o-
going project
• Discussing the Fundamentals of Building
Construction
• Site visiting at Fountain Grove with Engr. Joel
Dela Luna Luces
• Group Discussion about the task being
assigned
• Site observation on-going project at Fountain
Grove
• Group Discussion about the task being
assigned
• Time out

June 23, 2023 • Time in


• Reporting about yesterday observation in o-
going project
• Discussing the Fundamentals of Building
Construction
1. Manpower
2. Equipment/ tools used in Construction
3. Estimates
• Group Discussion about the task being
assigned
• Estimates the column and footing
• Going to Material Testing Concrete
1. Footing
2. Column footing
3.
ANNEX “D”

COMPLIANT
WITH WORK SUPERVISOR’
DATE TIME ACTIVITIES SCHEDULE SREMARKS
(YES/NO)
• Discussion about the compressive strength
test of concrete in specified curing period (7
days, 14 days, 21 days, 27 days)
• Observing on how the concrete being test in
compression testing machine.

Conforme:

Student’s Signature overprinted name Supervisor’s Signature overprinted