65MWp ARECO SOLAR PV POWER PLANT PROJECT
subcontractor:
REQUEST FOR INSPECTION
RFI VA-APCC-QA-RFI-EE-0046
INSPECTION DATE/LOCATION Date: February 22, 2025 Time: 1:00PM
Area:PV Farm Array 08
REVIEW(R) SURY(S) WITNESS(W) HOLD(H) SUBCONTRACTOR CONTRACTOR Owner/OE
Owner/OE
Name: CLINT Name: Name:
Contractor MOSENABRE
Signature: Signature:
Signature:
Item No: DESCRIPTION OF INSPECTION/TEST ACTIVITIES
Inspection for Backfilling LV trench at PV Farm Array 08
NA
Contact Person Clint E. Mosenabre Position Electrical Engineer
REMARKS:
ACKNOWLEGEMENT
RESULTS
(See remarks if any)
CONTRACTOR OWNER/OE
Acceptable
Name: Name:
Acceptable with comments
Signature: Signature:
Not acceptable (see NCR.)
Date: Date:
INSPECTION REPORT
ELECTRICAL INSTALLATION
WORKS
PROJECT: 65MWp ARECO SOLAR PV POWER
Report No.:
PLANT PROJECT
Data:
Location: PV Farm Array 08 Sheet 1 of
Drawing No.:VA-EE-PP-DW-002-4
QCR No.:
VA-EE-PP-DW-004
Reference No.: VA-APCC-QA-RFI-EE-0046
Verification and Approval Remark
No. Inspection Description
Yes No N/A
Verify cable route according to approved
1
relevant drawings.
Verify the width and depth measurements against
2
the approved relevant drawings.
Ensure that the soil bedding is free from stones
3
and does not contain loose soil.
Check HDPE spacing according to approved
4
relevant drawings.
Verify the number of wires inside the HDPE
5 containment according to approved relevant
drawings.
Verify the diameter of HDPE pipes according to
6
approved relevant drawings.
Check that the HDPE connections are properly
7
sealed according to the required specifications.
Verify HDPE spacing according to relevant
8
approved drawings.
Check if the backfilling materials for DC, LV,
9
and MV cable pipes are free of stones.
Ensure the warning tape is properly installed
10
before the final backfilling.
Check the cable bending radius and protection
11
from any sharp object.
Check if the end of the cable is protected and
12
sealed.
Check if the cables and HDPE pipes are properly
13
dressed and secured.
Check that both ends of the HDPE pipes are
14
properly sealed.
Verify that the connections and both ends of the
15 concrete pipes are sealed according to the
required specifications.
Check that the cable ladder is properly installed
16
at the large river crossing.
REMARKS:
Items Sub-Contractor Contractor OWNER/OE
Signature
Full name Clint E. Mosenabre
Date
28WAC37
REVISION
REV DESCRIPTION DATE
A Cable Route and Cable List(4)
OWNER NAME
B.Grimm Power Public Company Limited
OWNER'S ENGINEER NAME
AFRY Philippines, Inc.
EPC CONTRACT NO. EPC CONTRACTOR NAME
China Energy Engineering CO.Ltd
Shanxi Electrical Power Engineering Co.,LTD
PROJECT TITLE
65MWp Areco Solar PV Power Plant Project
ORIGINATOR DOCUMENT TITLE, SUBTITLE REVISION DATE
LANGUAGE SCALE
DESIGNED Cable Route and Cable DOCUMENT STATUS DOCUMENT TYPE
List(4) FORMAT PROJECTION
CHECKED
PROJECT DOCUMENT CODE SHEET ORIGINATOR DOCUMENT CODE
APPROVED
Soil Backfill without rocks
Soil Backfill without rocks
Warning Tape
Warning Tape
(D40,minimum compressive strength 320N,
minimum dielectric strength 2000V) minimum dielectric strength 2000V)
D100 HDPE corrugated conduit(Cable filling 28.1%) D100 HDPE corrugated conduit(Cable filling 28.1%)
(D100,minimum compressive strength 320N,
minimum dielectric strength 2000V) minimum dielectric strength 2000V)
Type 1:Typical Detail Underground Conduit Type 3:Typical Detail Underground Conduit
(For LV AC Cable & Solar Cable) (For LV AC Cable & Solar Cable)
Soil Backfill without rocks Soil Backfill without rocks
REVISION
Warning Tape Warning Tape REV DESCRIPTION DATE
A Typical Details LV Cable
B Typical Details LV Cable
(D40,minimum compressive strength 320N,
minimum dielectric strength 2000V) minimum dielectric strength 2000V)
OWNER NAME
D100 HDPE corrugated conduit(Cable filling 28.1%)
(D100,minimum compressive strength 320N,
B.Grimm Power Public Company Limited
minimum dielectric strength 2000V) minimum dielectric strength 2000V)
OWNER'S ENGINEER NAME
AFRY Philippines, Inc.
EPC CONTRACT NO. EPC CONTRACTOR NAME
China Energy Engineering CO.Ltd
Shanxi Electrical Power Engineering Co.,LTD
Type 2:Typical Detail Underground Conduit PROJECT TITLE
Type 4:Typical Detail Underground Conduit 65MWp Areco Solar PV Power Plant Project
(For LV AC Cable & Solar Cable)
(For LV AC Cable & Solar Cable)
ORIGINATOR DOCUMENT TITLE, SUBTITLE REVISION DATE
LANGUAGE SCALE
DOCUMENT STATUS DOCUMENT TYPE
DESIGNED Typical Details LV Cable
FORMAT PROJECTION
CHECKED
PROJECT DOCUMENT CODE SHEET ORIGINATOR DOCUMENT CODE
APPROVED
Soil Backfill without rocks
Warning Tape
(D40,minimum compressive strength 320N,
minimum dielectric strength 2000V)
D100 HDPE corrugated conduit(Cable filling 28.1%)
(D100,minimum compressive strength 320N,
minimum dielectric strength 2000V)
Type 2:Typical Detail Underground Conduit
(For LV AC Cable & Solar Cable)
Soil Backfill without rocks
REVISION
REV DESCRIPTION DATE
Warning Tape Typical Details LV Cable
A
B Typical Details LV Cable
(D40,minimum compressive strength 320N,
minimum dielectric strength 2000V)
OWNER NAME
D100 HDPE corrugated conduit(Cable filling 28.1%)
(D100,minimum compressive strength 320N, B.Grimm Power Public Company Limited
minimum dielectric strength 2000V)
OWNER'S ENGINEER NAME
AFRY Philippines, Inc.
EPC CONTRACT NO. EPC CONTRACTOR NAME
China Energy Engineering CO.Ltd
Shanxi Electrical Power Engineering Co.,LTD
PROJECT TITLE
Type 1:Typical Detail Underground Conduit 65MWp Areco Solar PV Power Plant Project
(For LV AC Cable & Solar Cable)
ORIGINATOR DOCUMENT TITLE, SUBTITLE REVISION DATE
LANGUAGE SCALE
DOCUMENT STATUS DOCUMENT TYPE
DESIGNED Typical Details LV Cable
FORMAT PROJECTION
CHECKED
PROJECT DOCUMENT CODE SHEET ORIGINATOR DOCUMENT CODE
APPROVED