She PZ El 05868 0 B
She PZ El 05868 0 B
Zone: 7 From To
IR Type: BMS
33A, 33D, 43A, 43B,
Location
Area:
Level
43C & 44C
SBF N/A
Subcontractor MTTS Axes: PB4 - PB16/C63 - CL70
ali al saadi
Name: …………………...………….
Description of work
12-04-2023
Date: ………………….…………… Date: 15-Apr-2023
Reference Documents
Time: 7:03 AM
FCU CONTROL PANELS FULL INSTALLATION WITHOUT Design Dwg.: AS PER ATTACHED DRAWING LIST
TERMINATION.
(FCU/SHZ-BU-07-269, 292, 293, 294, 295, 296, 297, 298, 316 Shop Dwg.: AS PER ATTACHED DRAWING LIST
& 322).
QUANTITY: Rfi No.: N/A
PANELS: (10) PCS
3/4" LS0H LIQUID TIGHT FLEXIBLE CONDUIT: (40) MTR Checklist Ref No.: ICL-1150-EL-041-00
1" EMT CONDUIT: (100) MTR
Inspection and test plan : ITP-1150-EL-041-00
SHE-SD-BM-E03-00-0120-03
Other Doc.: SHE-HR-MIR-MTTS-EL-55-00
A B C D
INSP. BANDR ALSHAREEF Date: / / 2023
SURV.
A B C D
Date: / / 2023
A B C D
C.E.
Date: / / 2023
FAZAL AHMAD A B C D
E.E.
MOHAMMED HANOUSH Sayed Meslhy Date: 20-04-2023 / / 2023
M.E. A B C D
Date: / / 2023
ARCH.
A B C D
Date: / / 2023
GEO.
A B C D
Date: / / 2023
R&E
A B C D
Date: / / 2023
A B C D
Other
Date: / / 2023
STATUS
Sayed Meslhy
Resident Eng. ……………………………………………………………………………………………. Date:- / /
……………………………………………………………………………………………. 20-04-2023
Received by Contractor :
1- Approval shall not relieve the Contractor of its obligations and liabilities under the Contract or constitute authorization of any change to Contract Documents, and therefore shall not imply any recognition whatsoever of additional time and/ or cost.
3- IR shall be closed within 48 hours from the above mentioned Date of Inspection.
Comments:
Name of the
Sr No. Discipline Comments
Engineer
Sayed Meslhy LC & Control
1-Main contractor is fully responsible for saving installations & changing any damaged material
2- Contractor shall provide BMS T&C plan for review and approval
3- earthing , labeling , end cab for c-hcannels shall be checked with the next stage
Approval shall not relieve the Contractor of its obligations and liabilities under the Contract or constitute authorization of any change to Contract Documents, and therefore
shall not imply any recognition whatsoever of additional time and/ or cost.
Form No. QMPF-45-CC-R01
Contractor:
THIRD SAUDI EXPANSION OF THE HOLY
MOSQUE & SURROUNDING AREAS
Project Ref:1150 Issue Date: 12-Apr-2023
LIST OF DRAWINGS (LOD)
DESIGN DRAWING
No. Drawing Reference Rev. No.
1 N/A
2
3
4
5
6
7
8
9
10
11
12
13
15
SHOP DRAWING
No. Drawing Reference Rev. No.
1 SHZ-SD-BM-E02-B2-033A-03 03
2 SHZ-SD-BM-E02-B2-033D-03 03
3 SHZ-SD-BM-E02-B2-043A-03 03
4 SHZ-SD-BM-E02-B2-043B-03 03
5 SHZ-SD-BM-E02-B2-043C-03 03
6 SHZ-SD-BM-E02-B2-044C-03 03
7
8
9
10
11
12
13
14
15
16
17
18
19
Consultant Engineer Q.C Engineer BANDR ALSHAREEF
Name: ……………………………………………………………. Name:
Sayed Meslhy
Sign. : ……………………………………………………………. Sign. : …………………………………………………………….
Approval shall not relieve the Contractor of its obligations and liabilities under the Contract or constitute authorization of any change to
Contract Documents, and therefore shall not imply any recognition whatsoever of additional time and/ or cost.
Form No. QMPF-04-LOD-R00
Consultant: Contractor:
THIRD SAUDI EXPANSION OF THE HOLY MOSQUE &
SURROUNDING AREAS
A BMS SYSTEM
B1
Outlet boxes are installed at exact locations and levels as
per specification and approved shop dwg. P
B2
Conduits will be terminated with locknuts and bushings or
any approved fittings to boxes ,or boards . P
B3
Approved Pull boxes are provided for every two bend or
every straight runs exceeding 15 meters. P
Openings in Walls & floors for cable Tray crossing are
B4 sealed using fire proof sealant or other sealant as per
Approval/Dwg
P
B5
Conduits, trunks crossing expansion joint provided with
expansion coupler P
B6
Flexible conduit is used for final connection to field devices
. P
B7
Check that separate conduits for BMS are not shared with
other systems. P
B8
Check that Bending radius as per specs and manufacturer
recommendation. P
B9
Installed raceways have no more than 2 quarter bends , field
bends don't hinder cable pulling P
1/5
ICL-1150-EL-041-00
Consultant: Contractor:
THIRD SAUDI EXPANSION OF THE HOLY MOSQUE &
SURROUNDING AREAS
C1
Check cables for twisting & damage in outer insulation
sheath. P
C2
Check the size, type, rating and color coding of cables
installation as per latest approved shop drawings / specs. P
Check the cables tags , identification as per project
C3 specification along the route and at every change in
direction and both ends, each side of duct etc.
P
C4 Check cables according to cable test plan
P
C5
Check the permissible length of control cable according to
material submittal approval P
C6
Check that all cables are secured At ends to avoid
excessive tension and protected from dust. P
2/5
ICL-1150-EL-041-00
Consultant: Contractor:
THIRD SAUDI EXPANSION OF THE HOLY MOSQUE &
SURROUNDING AREAS
C7
Check that Filling ratio of pulling cables in raceways is
accepted P
C8
Check that the cables segregation and spacing are as per
specification and Manufacturer’s recommendations. P
C9
Check the sealing of Pipe/pvc duct /openings in route of
cable installed. P
Check that Protective sleeves are provided as per
C10 specification, and location such as road crossing, passing
from wall etc.
P
C11
Check glanding of cables installed secured and correctly
with accessories, no sharp bends. P
C12
Check termination, jointing as per procedure &
identification of joints, its boxes etc. P
C13 Check cable for its supports & clamping at termination end.
P
C14
Check the tightness of connection of terminals, screw and
supports .. etc. P
C15 LAN cable shall not share conduit with any other cable
P
C16
Check for adequate length of free conductors in boxes and
at both the ends of termination. P
C17 Check that Continuity Test is done and accepted.
P
C18
Check that Insulation Resistance/Capacitance Test for
max acceptable length is done and accepted. P
C19 Check for cable labeling at both ends,
P
C20 Check for cable ties
P
D SECTION 3 - THIRD FIX WORKS
ICL-1150-EL-041-00
Consultant: Contractor:
THIRD SAUDI EXPANSION OF THE HOLY MOSQUE &
SURROUNDING AREAS
D14
Check that BMS panels shall be positioned to allow doors
to be fully opened for easy access to wiring and component P
D15
Check that all control and monitoring cables shall not share
any cable carrying voltages in excess of 48V P
D16
Check That Field Device Installed as per approved Shop
Drawing. P
D17
Check That Equipment and field device properly Installed
and accessible for operation and Maintanence . P
D18
Check That VAV cable Termination done as per approved
shop drawings. P
Check That Damper Aqtuator Termination as per
D19 coordinated with fire alarm control modules as per
approved detail.
P
4/5
ICL-1150-EL-041-00
Consultant: Contractor:
THIRD SAUDI EXPANSION OF THE HOLY MOSQUE &
SURROUNDING AREAS
D20
Check all input & output point according to the I/O LIST
APPROVAL P
D21
Check That Air Flow Station Installation And cable
Termination done as per approve shop drawings. P
D22
Chek That Valve Actuator Termination done as per approve
shop drawings. P
D23 Functional operation tests are done and accepted .
P
check that Testing and commissioning as per approved
D24
testing and commissioning plan for all of the system
components as well interfacing with the other related
systems are done and accepted .
P
Comments :
5/5
ICL-1150-EL-041-00
Refer to comments on DWG# SHZ-SD-BM-E02-B2-032B-03
Elect. (B)
refer to all comments on DWG# SHZ-SD-BM-E02-B2-032B-03
A.A 30/6/2020
Elect. (B)
refer to all comments on DWG# SHZ-SD-BM-E02-B2-032B-03
A.A 30/6/2020
Refer to comments on drawing no.
SHZ-SD-BM-E02-B2-040A-03.
T.A 30/6/2020
Elect. (B)
refer to all comments on the DWG# SHZ-SD-BM-E02-B2-023B-03
Low Current: Code "B"
Refer to the comments on dwg no. SHZ-SD-BM-E02-B2-040A-03
FCU thermostats
are missing.
T.A 30/6/2020
Elect.(B)
refer to all comments on DWG# SHZ-SD-BM-E02-B2-023B-03
Missing
FCUs
Elect. (B)
refer to all comments on DWG# SHZ-SD-BM-E02-B2-032B-03
T.A 30/6/2020
Pump control panel
shall be connected
to BMS.
T.A 30/6/2020
Elect. (B)
refer to all comments on DWG# SHZ-SD-BM-E02-B2-032B-03