Chapter
Date Page No. Amendment Detail Reasons for Amendment
Rev. No. No.
01 27-09- 2.2.1 07 Delivery/receipt note: Line of For easy action of
2019 action and name of document warehouse personnel and
revised. understanding of all.
01 NA 2.2.3 21 GRN: Line of approval changes As per the approval
hierarchy required.
02 28-08-19 2.2.3 21 GRN: Additional info to be IGP number and cost to be
added. added as per identified
requirement.
03 27-10-19 2.2.3 21 GRN: Additional info to be Added PR number as per
added. requirement of
01 27-10- 6.1.1 17 Traceability of goods. procurement.
Addition made in terms of
2019 prefixes.
01 10-11- Appendix# 22 Process flow chart. Revised as per identified
2019 01 error in flow of inspection.
01 27-12- Appendix# 25 Goods Issuance requisition. Name changed as per easy
2019 04 understandability
requirement.
01 27-12- Appendix# 27 Personnel inventory card. Changes incorporated to
2019 06 manage returns in the
format.
00 27-12- Appendix# 28-29 Monthly inspection checklist. Reviewed and added to
2019 09 WPM accordingly.
Doc. No. I-PRO-SCM-WH-0001-00
Rev. No. 00
Doc. No. I-PRO-SCM-WH-0001-00
Rev. No. 00
TABLE OF CONTENTS
Rev. No. 00
4.1.1 Consumable........................................................................................................13
4.1.2 Non-consumable.................................................................................................13
4.2 Types of inventory items................................................................................................13
4.2.1 Technical.............................................................................................................13
4.2.2 Administrative....................................................................................................13
4.2.3 Packaging............................................................................................................13
4.2.4 Stock...................................................................................................................13
5.0 Setting up of inventory levels................................................................................13
5.1 Guidelines:......................................................................................................................14
6.0 Inventory tracking.................................................................................................14
APPENDICES
APPENDIX #1: Receiving Stamp - Store
APPENDIX #2: Process flow Chart – Stores
APPENDIX #3: Goods Receipt Note – Form
APPENDIX #4: Goods Issuance Note - Form
APPENDIX #5: Receipt Note - Form
APPENDIX #6: Personnel Inventory Card - Form
APPENDIX #7: Store Return Note - Form
APPENDIX #8: Daily POL and Chemical Issuance Form
APPENDIX #9: Inventory and Warehouse inspection checklists - Form
Page 2 of 35
Doc. No. I-PRO-SCM-WH-0001-00
Rev. No. 00
Page 3 of 35
Doc. No. I-PRO-SCM-WH-0001-00
Rev. No. 00
1.0 Introduction
A healthy inventory flow increases uptime of business operations, manage deliveries, produce insights to
cost management and helps to sped productive work of employees. Without this flow, risks of doing
business doubles, operations gets hampered and eventually the business dies. It should be no surprise to
find that in many industries, a firm's financial performance and position depend heavily on the firm's
ability to manage inventory effectively and efficiently. Inventory management is the art of making in-
demand products available when customers want them while keeping inventory costs low.
HAC Agri’s warehousing system will be based on computerized inventory management contour. Stores
will be managed centrally at any facility along with the hierarchical authority and operations. Store
policies and procedures to be approved by board of directors. Revisions will be approved as per the
same criteria.
The Main store will be established at facilities, as per the requirement to store and for material required
to be stacked under covered conditions. The building of store should cater good ventilation, safe
passages and accommodate all consumables, non-consumables, tools and other material. Other storage
requirements will be according to the types of material and will be managed using contemporary
methods of warehousing.
The storages of material inside the warehouse or in the open yard shall be done in a proper and safe
manner, according to the type / size of the items and as per manufacture’s storage recommendations.
Assistant
Manager
(Stores)
Stores
Store Keeper
Executive
Rev. No. 00
Responsible for Management and fixation of all warehouses operational and administrative
operations and issues subsequently.
Responsible for leading teams of inventory controlling.
To support the Management in effective inventory turnover strategies and logistics handling.
Ensuring the recycling process to minimize costs and scrap management with conducting timely
auctions.
To follow up on the tasks assigned to each employee in the store.
Responsible of maintaining adequate store supplies.
Responsible of all receiving and issuances in addition to handling damaged products, and
returns.
Responsible of documentation of all products listing and orders.
Responsible for the physical verification of the stores, biannually and annually.
To safeguard organizational control and interests using modern inventory management
techniques.
Responsible for warehouse inspections as per approved checklists.
Responsible for inventory reporting to help upper management in finalizing procurement and
inventory lag decisions.
Responsible for SOP’s formulation and revision as per the company policies and vision.
Page 5 of 35
Doc. No. I-PRO-SCM-WH-0001-00
Rev. No. 00
Rev. No. 00
Page 7 of 35
Doc. No. I-PRO-SCM-WH-0001-00
Rev. No. 00
Page 8 of 35
Doc. No. I-PRO-SCM-WH-0001-00
Rev. No. 00
Spare parts shall be issued on replacement basis on submission of used / damaged ones.
Quantity issued is then and there entered and to be signed and checked by the respective
issuing personnel.
Page 9 of 35
Doc. No. I-PRO-SCM-WH-0001-00
Rev. No. 00
authorized personnel. The Store will check the physical condition of the goods and mark the
condition accordingly at the SRN.
For NCA Items, store will check the physical condition of items/goods and will be taken back and
adjusted on Issue Register (Project Inventory) and Personnel inventory card.
Serviceable items will be stacked/kept for future use, whereas unserviceable items will be
recorded at scrap registers/file accordingly.
Serviceable/ Refurbish able inventory items.
A specimen of the store return note is given at appendix # 07.
Rev. No. 00
Page 11 of 35
Doc. No. I-PRO-SCM-WH-0001-00
Rev. No. 00
Page 12 of 35
Doc. No. I-PRO-SCM-WH-0001-00
Rev. No. 00
4.1.2 Non-consumable
Items that retain its identity by standing, working, mixing or installing will be termed as non-consumable.
If there is any such item that do not fall under aforementioned categories then, management will have
the right to establish about its classification.
4.2.2 Administrative
All the items to be used for administrative requirements such as stationery, furniture etc will be termed
as administrative inventory.
4.2.3 Packaging
All the materials to be used in packaging of the stock i.e boxes, crates, pallets etc will be termed as
packaging inventory.
4.2.4 Stock
All the commodities to be processed and/or to be held at the CA stores will be termed as stock
inventory.
Page 13 of 35
Doc. No. I-PRO-SCM-WH-0001-00
Rev. No. 00
5.1 Guidelines:
To calculate the reorder levels as per the frequency of usage, multiply the average daily usage
rate by the lead time in days for an inventory item.
Minimum and maximum inventory levels will be incorporated as per the frequency of use. Also,
these levels shall be maintained as per the requirements of Maintenance Team.
An input on the levels to be maintained will be sought from stakeholders initially and then input
on GRN’s will be maintained on reports accordingly. It is a time bound activity and usage reports
of store will be key in encircling of appropriate levels accordingly.
Feedback on the store reports by stakeholders, business unit heads will also be the key in
framing appropriate inventory levels. All the reports will incorporate input and reports will be
updated accordingly.
Safety stock against imported spares is to be maintained and incorporated in re-order levels.
Delivery challenges and lead time will also be kept in attention while preparing re order levels.
In actuality situation one never encounters a zero lead time. There is always a time lag from the
date of placing an order for goods and the date on which products are received therefore
instantaneous replenishment must be avoided in any case so that uptime of
plant/machinery/equipment may be maximized.
Inventory levels for spares/goods having fluctuating demand must be set in accordance with the
end users.
Page 14 of 35
Doc. No. I-PRO-SCM-WH-0001-00
Rev. No. 00
XX - XX - XX - XX - XX - XX - XX
Size/dimensions etc. (Thirteenth and fourteenth
digit)
To consolidate or authenticate the process of Item code allocation, all the item codes will be
generated through stores in consultation with technical resource from respective department.
Stores will manage parts and equipment references to ensure storage types (i.e. bins, drawers,
boxes) are identifiable and easily located in the onsite storage facilities
For easy traceability of a product, locations shall also be mentioned on the Bin card. For example,
location of any item placed in Rack No. 2, Shelf No. C shall be:
R2 C
Rack Shelf (Location R2-C)
Prefix of relevant space can be added to the shelves traceability according to the needs i.e M for
mezzanine, H for HO and C for chemicals store etc.
Page 15 of 35
Doc. No. I-PRO-SCM-WH-0001-00
Rev. No. 00
Page 16 of 35
Doc. No. I-PRO-SCM-WH-0001-00
Rev. No. 00
Page 17 of 35
Doc. No. I-PRO-SCM-WH-0001-00
Rev. No. 00
members along with the rep of senior management i.e. member of Board of directors/COO.
Decision of committee will be final in terms of disposal price and bidder.
Only the highest bids will be accepted by the committee and 50 percent of the total bid is to be
submitted in cash at the same time. Remaining will be paid before delivery.
Page 18 of 35
Doc. No. I-PRO-SCM-WH-0001-00
Rev. No. 00
Page 19 of 35
Doc. No. I-PRO-SCM-WH-0001-00
Rev. No. 00
Rev. 0
DEPARTMENTS
All Deptts/
Concerned STORES - Plant Procurement STORES - Plant Finance and Accounts
Department
GIN Processed.
Page 20 of 35
Doc. No. I-PRO-SCM-WH-0001-00
Rev. No. 00
1. Please be informed that following products/goods have been received in below mentioned quantity. Information is forwarded for inspection of the material at the Engg. Store's inspection area.
To be filled in By Indentor/Requisitioner
PO Pending Del. Status Min/Re- Material
Quantity Unit Total Date of
Sr No Product Code Product / Item Name Description/Size UoM Quantit Quantit (Partial order Accepted Remarks
Received Price Amount Expiry
y y /Complete) Levels /Rejected
10
Total Amount 0
Normal Storage AC Storage Packing Storage Other Head Office Store Rack: NA
Name
Designation
Page 21 of 35
Doc. No. I-PRO-SCM-WH-0001-00
Rev. No. 00
App
Rev No: 1
1. Following Goods/Items have been issued as per request from the indentor.
Signatue
Name
Desig.
Page 22 of 35
Doc. No. I-PRO-SCM-WH-0001-00
Rev. No. 00
Quantity
Sr No Product / Items Description / Size UOM Remarks
Received
1
2
3
4
5
6
7
8
9
10
No of Items: Only/-
Name
Desig.
Page 23 of 35
Doc. No. I-PRO-SCM-WH-0001-00
Rev. No. 00
Rev. 01
10
11
12
13
14
15
16
17
18
19
20
Page 24 of 35
Doc. No. I-PRO-SCM-WH-0001-00
Rev. No. 00
Signatue
Name
Desig.
Page 25 of 35
Doc. No. I-PRO-SCM-WH-0001-00
Rev. No. 00
Product/Item: Date:
10
11
12
13
14
15
Prepared by Checked By
Signatue
Name
Desig.
Page 26 of 35
Doc. No. I-PRO-SCM-WH-0001-00
Rev. No. 00
Rev No: 1
Compliant Score
Check
Sr No Activities /Non 1(min) to Observation/Remarks
For Compliant 5(max)
1 Floors, walls, stairs and surfaces are clear of dirt, oil and grease.
1 Cleaning instruction, shift incharge numbers, checklists are posted in the area.
Standardization
Signatue
Name
Desig.
Page 27 of 35
Doc. No. I-PRO-SCM-WH-0001-00
Rev. No. 00
Score
Compliant/
Check 1(min)
Sr. # Activities Non- Observation/Remarks
For Compliant
to
5(max)
Wall, ceiling & doors should be durable, impervious, smooth, clean, no
1
flaking of paint.
Floors should be smooth, clean, durable, no hole, free from litter &
2
stagnation of water.
Structure, Design and Maintenance
1
removed at regular interval to minimise contamination.
Containers used for waste are clearly identified, covered, leak-proof &
2
if feasible, internally lined with a plastic bag.
Toilet shall be adequately segregated & shall not open directly into
Staff Facilities
1
food storage area.
Toilet shall be provided with hand-washing facilities comprising of
2
water taps, liquid soap & appropriate hand drying facilities.
Toilets are clean & kept close; Toilet facilities are in good working
3
order.
Page 28 of 35
Doc. No. I-PRO-SCM-WH-0001-00
Rev. No. 00
Remarks:
Signature
Name
Designation
Page 29 of 35
Doc. No. I-PRO-SCM-WH-0001-00
Rev. No. 00
Page 30 of 35
Doc. No. I-PRO-SCM-WH-0001-00
Rev. No. 00
Page 31 of 35