0% found this document useful (0 votes)
10 views1 page

Plastering_Material_Calculation

Uploaded by

hanose
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views1 page

Plastering_Material_Calculation

Uploaded by

hanose
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

LAKE/ 041 Plastering Material Calculation Report

Project: Exterior + interior Second Coat Plastering

Area: 462 m²

Thickness: 2.5 cm

Mix Ratio: 1:3 (Cement:Sand)

1. Plaster Volume Calculation


Thickness: 2 cm = 0.02 m

Wet Volume = Area × Thickness

462 m² × 0.02 m = 9.24 m³

Dry Volume = Wet Volume × 1.33 (for bulking and wastage)

9.24 × 1.33 = 12.29 m³

2. Cement Requirement (1:3 Mix)


Cement Share = 1 part of 4 total parts

Cement Volume = 1/4 × 12.29 = 3.07 m³

Cement Weight = 3.07 m³ × 1440 kg/m³ = 4424.4 kg

Cement Bags = 4424.4 ÷ 50 = 110.6 bags ≈ 88.48bags

Per m² Cement Usage = 4424.4 ÷ 462 ≈ 9.58 kg ≈ 0.19bags/m²

Summary
Material Total Quantity Per m²

Cement for plastering 4424.4 kg (≈ 89 bags) 9.58 kg (≈ 0.19 bags)

Cement for parapet HCB 74 m2 *0.18bags≈ 14bags


wall LAKE/041

BASEMENT floor concrete work finalizing 1.32m3 * 2.8Q ≈ 8bags (4Q)

TOTAL CEMENT CONSUMPTIONS FOR LISTED ACTIVITIES -= 111 BAGS