MMRDA has awarded DMRC the consultancy for preparing the Detailed Project Report (DPR) for Mumbai Metro Line-13 from Subash Chandra Bose Stadium to Global City, Virar. The report will include chapters on Signalling, Train Control, Telecommunication, and AFC systems, with specific technical specifications outlined for the project. The S&T department is requested to review the enclosed chapters and provide feedback.

Uploaded by

SAAGAR JHA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
386 views1 page

MMRDA DPR Note

MMRDA has awarded DMRC the consultancy for preparing the Detailed Project Report (DPR) for Mumbai Metro Line-13 from Subash Chandra Bose Stadium to Global City, Virar. The report will include chapters on Signalling, Train Control, Telecommunication, and AFC systems, with specific technical specifications outlined for the project. The S&T department is requested to review the enclosed chapters and provide feedback.

Uploaded by

SAAGAR JHA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Note # 1

NOTE
Sub: Preparation of Signal, Telecom & AFC Chapters for DPR for
Mumbai Metro Line-13 - Subash Chandra Bose Stadium (SCBS),
Bhayandar to Global City, Virar.
Ref: DMRC/GM(CS)/04/ ML-13/ DPR/2018/183 dated 06/05/2025
MMRDA has awarded LOA to DMRC for providing consultancy services
for preparation of Detailed Project Report (DPR) for Mumbai Metro Line-
13 - Subash Chandra Bose Stadium (SCBS), Bhayandar to Global City,
Virar.
In view of above, respective chapters need to be prepared for above
mentioned corridor. Depot for the corridor shall be planned near Global
City station. Technical specifications for the MRTS corridor are as
below: -

1. Traction System shall be 25 kV AC OHE


2. Maximum Design speed of the rolling stock is to be kept 90 kmph
3. Coach width shall be 3.2 m

In view of preparation of DPR, GM/ BD team requested S&T department


(cp2) to prepare chapters of (i) Signalling & Train Control system and (ii)
Telecommunication & AFC system for the proposed corridor.
Therefore, Signalling (cp19) & Telecom-AFC(cp35) chapters for the
proposed corridor are enclosed separately as requested.
AGM/S&T-2 is requested to review and provide comments, if any

20/05/2025 02:52 pm कशु क चतु व दी |KINSHOOK CHATURVEDI


जे जीएम (एस एं ड टी )|JGM (S&T)

Note # 2

20/05/2025 03:33 pm आर पी सह |R P SINGH


जे जीएम (एस एं ड टी )|JGM (S&T)

1
File No. U-G0G(G)/35/2025-CSTE/P-I (Computer No. 80595)
Generated from eOffice by SATYENDER KUMAR YADAV, MGR (S&T)-SKY, MGR (S&T), Delhi Metro Rail Corporation on 20/05/2025 04:41 pm