T-402-S13-DWG-CV06-01024-B - S13 - Diaphragm Wall - Reinforcement - Cage No (P-024)
T-402-S13-DWG-CV06-01024-B - S13 - Diaphragm Wall - Reinforcement - Cage No (P-024)
S-025 S-023
REINFORCEMENT :-
1. STEEL TYPES :-
a. STRUCTURE MILD STEEL BARS (R) WITH Fyk= 240 MPa
b. HIGH YIELD DEFORMED BARS (T) WITH Fyk= 500 MPa
2. COUPLERS TYPES :-
a. COUPLERS TYPE ( C1 ) CORRESPOND TO SIMPLE THREADING.
b. COUPLERS TYPE ( C2 ) CORRESPOND TO DOUBLE THREADING.
* ALL USED COUPLERS ARE (C1) UNLESS OTHERWISE MENTIONED.
3. REINFORCEMENT ANCHORAGE AND LAP LENGTH .
RFT Bar Dia. (Ф)
SECTION A1 - A1
C40/50 20 mm 22 mm 25 mm 32 mm 40 mm
Scale -1:25
Anchorage Length 30 Ф 30 Ф 30 Ф 30 Ф 32 Ф
mm 600 660 750 960 1280
44 Ф 44 Ф 44 Ф 44 Ф 48 Ф
Lap Length mm
880 968 1100 1408 1920
S-025 S-023
FIRST ELEMENT
BAR MARK KEY:-
BAR DIAMETER BAR SPACING
NUMBER OF BARS
NUMBER OF LAYERS 2x5-T12 @280 BAR MARK NUMBER
006
EACH FACE
BAR LOCATION
REFERENCES DOCUMENTS:-
1.TENDER GENERAL NOTES FOR STATION
CM4P1-TD-DR-ALL-UGA-100701 to 100901-JDC-S02
SECTION B1 - B1 2. TENDER DETAILS OF DIAPHRAGM WALL TYPE F
Scale -1:25 CM4P1-TD-DR-STN-S13-UDW-116101 AND 116202-JDC-S03
3.TENDER ELEVATION AT
CM4P1-TD-DR-STN-S13-UDL-111301-JDC-S03
4. TENDER INTERMEDIATE (B3) PLAN REINFORCEMENT DETAILS
TOP RFT CM4P1-TD-DR-STN-S13-URD-146100 TO 146501-JDC-S03
BOTTOM RFT CM4P1-TD-DR-STN-S13-URD-146600 TO 147001-JDC-S03
5. TENDER CONCOURSE INTERMEDIATE(B2) PLAN REINFORCEMENT DETAILS
TOP RFT CM4P1-TD-DR-STN-S13-URD-148100 TO 148501-JDC-S03
BOTTOM RFT CM4P1-TD-DR-STN-S13-URD-148600 TO 149001-JDC-S03.
6. TENDER (B1) LEVEL PLAN REINFORCEMENT DETAILS
TOP RFT CM4P1-TD-DR-STN-S13-URD-150100 TO 150601-JDC-S03
BOTTOM RFT CM4P1-TD-DR-STN-S13-URD-150700 TO 151201-JDC-S03.
S-025 S-023 7. TENDER ROOF PLAN REINFORCEMENT DETAILS
TOP RFT CM4P1-TD-DR-STN-S13-URD-152100 TO 152401-JDC-S03
BOTTOM RFT CM4P1-TD-DR-STN-S13-URD-152500 TO 152801-JDC-S03.
8. PANELING DRAWINGS:-
T-402-S13-DWG-CV06-00103 TO 00106- PANELING LAYOUT
T-402-S13-DWG-CV06-00107 TO 00110- CAGES LAYOUT
P.YOUSSEF DIMITRIOS
TUNNELS (NAT) Format: A1 Scale(s): 1:50 1:25 Pages: 1 /4 1st Issue Date: 24-10-2024
B 12/11/2024 B.FAYEK SAYED ALI ISSUED FOR APPROVAL
RIZOS File Name:
P.YOUSSEF DIMITRIOS T-402-S13-DWG-CV06-01024-B
A 24/10/2024 B.FAYEK SAYED ALI
RIZOS
ISSUED FOR APPROVAL B GREATER CAIRO METRO
THE ISSUER: PROJECT CONTRACT SUB SUB DOC
LINE 4PHASE 1 - NEW CP 402 ORASCOM CONSTRUCTION PHASE NO.
AREA
-TYPE DISCIPLINE NUMBER REV.
REV. DATE PREPARED CHECKED APPROVED REASON FOR ISSUE STATUS
BY BY BY CONTRACT Nº125 /METRO T 402 S13 DWG CV06 01024 B
The top level of handling bars
should be adjust with the level of
Guide wall to avoid miss location of
D-wall level.
S-025 S-023
SECOND ELEMENT
SECTION B2*- B2*
Scale -1:25
S-025 S-023
SECTION B2 - B2
Scale -1:25 ELEVATION STATION SIDE SECTION ELEVATION EARTH SIDE
Scale -1:50 Scale -1:50 Scale -1:50
S-025 S-023
01/12/2024
SECTION A2 - A2
Scale -1:25 POSITION OF HANDLING BARS
SCALE 1:25
P.YOUSSEF DIMITRIOS
TUNNELS (NAT) Format: A1 Scale(s): 1:50 1:25 Pages: 2 /4 1st Issue Date: 24-10-2024
B 12/11/2024 B.FAYEK SAYED ALI ISSUED FOR APPROVAL
RIZOS File Name:
P.YOUSSEF DIMITRIOS T-402-S13-DWG-CV06-01024-B
A 24/10/2024 B.FAYEK SAYED ALI
RIZOS
ISSUED FOR APPROVAL B GREATER CAIRO METRO
THE ISSUER: PROJECT CONTRACT SUB SUB DOC
LINE 4PHASE 1 - NEW CP 402 ORASCOM CONSTRUCTION PHASE NO.
AREA
-TYPE DISCIPLINE NUMBER REV.
REV. DATE PREPARED CHECKED APPROVED REASON FOR ISSUE STATUS
BY BY BY CONTRACT Nº125 /METRO T 402 S13 DWG CV06 01024 B
COUPLERS DETAILS
Scale 1:25
S-025 S-023
S-025 S-023
P-060 S-023
01/12/2024
P.YOUSSEF DIMITRIOS
TUNNELS (NAT) Format: A1 Scale(s): 1:50 1:25 Pages: 3 /4 1st Issue Date: 24-10-2024
B 12/11/2024 B.FAYEK SAYED ALI ISSUED FOR APPROVAL
RIZOS File Name:
P.YOUSSEF DIMITRIOS T-402-S13-DWG-CV06-01024-B
A 24/10/2024 B.FAYEK SAYED ALI
RIZOS
ISSUED FOR APPROVAL B GREATER CAIRO METRO
THE ISSUER: PROJECT CONTRACT SUB SUB DOC
LINE 4PHASE 1 - NEW CP 402 ORASCOM CONSTRUCTION PHASE NO.
AREA
-TYPE DISCIPLINE NUMBER REV.
REV. DATE PREPARED CHECKED APPROVED REASON FOR ISSUE STATUS
BY BY BY CONTRACT Nº125 /METRO T 402 S13 DWG CV06 01024 B
a a a
a a
A E
a4
a1
D
B
a3
01/12/2024
a2
P.YOUSSEF DIMITRIOS
TUNNELS (NAT) Format: A1 Scale(s): 1:50 1:25 Pages: 4/4 1st Issue Date: 24-10-2024
B 12/11/2024 B.FAYEK SAYED ALI ISSUED FOR APPROVAL
RIZOS File Name:
P.YOUSSEF DIMITRIOS T-402-S13-DWG-CV06-01024-B
A 24/10/2024 B.FAYEK SAYED ALI
RIZOS
ISSUED FOR APPROVAL B GREATER CAIRO METRO
THE ISSUER: PROJECT CONTRACT SUB SUB DOC
LINE 4PHASE 1 - NEW CP 402 ORASCOM CONSTRUCTION PHASE NO.
AREA
-TYPE DISCIPLINE NUMBER REV.
REV. DATE PREPARED CHECKED APPROVED REASON FOR ISSUE STATUS
BY BY BY CONTRACT Nº125 /METRO T 402 S13 DWG CV06 01024 B