0% found this document useful (0 votes)
154 views4 pages

T-402-S13-DWG-CV06-01024-B - S13 - Diaphragm Wall - Reinforcement - Cage No (P-024)

The document outlines specifications for diaphragm wall construction at El Giza Station, including dimensions, concrete strength, and reinforcement details. It specifies the types of steel and couplers to be used, along with anchorage and lap lengths for reinforcement bars. Additionally, it includes general comments and responsibilities for the contractor regarding safety, testing, and construction practices.

Uploaded by

aliaamustafa65
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
154 views4 pages

T-402-S13-DWG-CV06-01024-B - S13 - Diaphragm Wall - Reinforcement - Cage No (P-024)

The document outlines specifications for diaphragm wall construction at El Giza Station, including dimensions, concrete strength, and reinforcement details. It specifies the types of steel and couplers to be used, along with anchorage and lap lengths for reinforcement bars. Additionally, it includes general comments and responsibilities for the contractor regarding safety, testing, and construction practices.

Uploaded by

aliaamustafa65
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

NOTES:-

1. ALL DIMENSIONS IN MILLIMETER (mm) UNLESS OTHERWISE NOTED.


2. ALL LEVELS AND SURVEY POINTS COORDINATES ARE IN METER.
3. NO DIMENSIONS TO BE MEASURE FROM SCALING DRAWING.
4. D-WALL CONCRETE CHARACTERISTIC STRENGTH C40/50.
5. MINIMUM CONCRETE COVER IS 100 mm .

S-025 S-023
REINFORCEMENT :-
1. STEEL TYPES :-
a. STRUCTURE MILD STEEL BARS (R) WITH Fyk= 240 MPa
b. HIGH YIELD DEFORMED BARS (T) WITH Fyk= 500 MPa
2. COUPLERS TYPES :-
a. COUPLERS TYPE ( C1 ) CORRESPOND TO SIMPLE THREADING.
b. COUPLERS TYPE ( C2 ) CORRESPOND TO DOUBLE THREADING.
* ALL USED COUPLERS ARE (C1) UNLESS OTHERWISE MENTIONED.
3. REINFORCEMENT ANCHORAGE AND LAP LENGTH .
RFT Bar Dia. (Ф)
SECTION A1 - A1
C40/50 20 mm 22 mm 25 mm 32 mm 40 mm
Scale -1:25
Anchorage Length 30 Ф 30 Ф 30 Ф 30 Ф 32 Ф
mm 600 660 750 960 1280
44 Ф 44 Ф 44 Ф 44 Ф 48 Ф
Lap Length mm
880 968 1100 1408 1920

* DIAPHRAGM WALL BARS ARE IN GOOD CONDITIONS AND 100% LAPPED.


-DENSITY OF REINFORCEMENT ARE CALCULATED BASED ON CAGES WIDTH
PLUS THE TWICE OF HALF DISTANCE BETWEEN CAGES.

S-025 S-023

FIRST ELEMENT
BAR MARK KEY:-
BAR DIAMETER BAR SPACING
NUMBER OF BARS
NUMBER OF LAYERS 2x5-T12 @280 BAR MARK NUMBER
006
EACH FACE
BAR LOCATION
REFERENCES DOCUMENTS:-
1.TENDER GENERAL NOTES FOR STATION
CM4P1-TD-DR-ALL-UGA-100701 to 100901-JDC-S02
SECTION B1 - B1 2. TENDER DETAILS OF DIAPHRAGM WALL TYPE F
Scale -1:25 CM4P1-TD-DR-STN-S13-UDW-116101 AND 116202-JDC-S03
3.TENDER ELEVATION AT
CM4P1-TD-DR-STN-S13-UDL-111301-JDC-S03
4. TENDER INTERMEDIATE (B3) PLAN REINFORCEMENT DETAILS
TOP RFT CM4P1-TD-DR-STN-S13-URD-146100 TO 146501-JDC-S03
BOTTOM RFT CM4P1-TD-DR-STN-S13-URD-146600 TO 147001-JDC-S03
5. TENDER CONCOURSE INTERMEDIATE(B2) PLAN REINFORCEMENT DETAILS
TOP RFT CM4P1-TD-DR-STN-S13-URD-148100 TO 148501-JDC-S03
BOTTOM RFT CM4P1-TD-DR-STN-S13-URD-148600 TO 149001-JDC-S03.
6. TENDER (B1) LEVEL PLAN REINFORCEMENT DETAILS
TOP RFT CM4P1-TD-DR-STN-S13-URD-150100 TO 150601-JDC-S03
BOTTOM RFT CM4P1-TD-DR-STN-S13-URD-150700 TO 151201-JDC-S03.
S-025 S-023 7. TENDER ROOF PLAN REINFORCEMENT DETAILS
TOP RFT CM4P1-TD-DR-STN-S13-URD-152100 TO 152401-JDC-S03
BOTTOM RFT CM4P1-TD-DR-STN-S13-URD-152500 TO 152801-JDC-S03.
8. PANELING DRAWINGS:-
T-402-S13-DWG-CV06-00103 TO 00106- PANELING LAYOUT
T-402-S13-DWG-CV06-00107 TO 00110- CAGES LAYOUT

SECTION B1*- B1* General Comments:


Scale -1:25 1- The contractor doesn't provide the earthing system.
2-All construction aids are contractor responsibility and subject to the
contract.
3- The rate of casting concrete should be suitable to ensure the concrete of
D-wall is sound concrete.
4- The traffic area around open trench should not more than 5kN/m2.
5- It should insure the distance between bars similar to the drawing spacing
as it is a critical matter.
6- The cutter Crawler should be parallel to Trench.
7- Couplers density does not achieve the required area, hence it should be
compensate area with drilled bars in the slab.
SECTION 8. Contractor has not submit the required inserts for strutting system.
ELEVATION STATION SIDE ELEVATION EARTH SIDE
Scale -1:50 Scale -1:50
9. Contractor shall make all necessary precautions to maintain safety and
Scale -1:50
integrity of nearby buildings or facilities structures close to large panel.
10. Contractor shall ensure there is no effect on the existing building and
The proposal for change from Stop-End to over cutting method is technically hence the resulted displacement values can be adopted without any risk on
approved, however the contractor should get the approval for the commercial the neighboring structures.
before proceeding with this method. 11. The contractor shall carry out the necessary tests to ensure that the
01/12/2024 concrete of diaphragm wall is sound and does not contain cavities.
12. Any extra quantities even if used for construction purpose will be on
Contractor cost.
KEY PLAN: OWNER: ENGINEER: MAIN CONTRACTOR: Document Title:
ARAB REPUBLIC OF EGYPT NATIONAL AUTHORITY FOR TUNNELS ENGINEERING CONSULTANTS' CONSORTIUM EL GIZA STATION
MINISTRY OF TRANSPORT (NOCE) (STATION NO.13)
WORKSHOP DRAWINGS
NATIONAL AUTHORITY FOR DIAPHRAGM WALLS - TYPE F-PANEL (P-022)-STEEL CAGE (P-024)

P.YOUSSEF DIMITRIOS
TUNNELS (NAT) Format: A1 Scale(s): 1:50 1:25 Pages: 1 /4 1st Issue Date: 24-10-2024
B 12/11/2024 B.FAYEK SAYED ALI ISSUED FOR APPROVAL
RIZOS File Name:
P.YOUSSEF DIMITRIOS T-402-S13-DWG-CV06-01024-B
A 24/10/2024 B.FAYEK SAYED ALI
RIZOS
ISSUED FOR APPROVAL B GREATER CAIRO METRO
THE ISSUER: PROJECT CONTRACT SUB SUB DOC
LINE 4PHASE 1 - NEW CP 402 ORASCOM CONSTRUCTION PHASE NO.
AREA
-TYPE DISCIPLINE NUMBER REV.
REV. DATE PREPARED CHECKED APPROVED REASON FOR ISSUE STATUS
BY BY BY CONTRACT Nº125 /METRO T 402 S13 DWG CV06 01024 B
The top level of handling bars
should be adjust with the level of
Guide wall to avoid miss location of
D-wall level.

S-025 S-023

SECOND ELEMENT
SECTION B2*- B2*
Scale -1:25

S-025 S-023

SECTION B2 - B2
Scale -1:25 ELEVATION STATION SIDE SECTION ELEVATION EARTH SIDE
Scale -1:50 Scale -1:50 Scale -1:50

S-025 S-023

01/12/2024

SECTION A2 - A2
Scale -1:25 POSITION OF HANDLING BARS
SCALE 1:25

Please refer to the Engineer comments at


first page.

Handling and stiffeners bars are contractor responsibility


to ensure the integrity of cage during installation.
DETAIL FOR LIFTING & HANDLING
LIFTING DETAIL FOR ELEMENTS
Scale -1:25 TYPICAL COUPLER HEAD DETAIL
STIFFENER DETAIL SCALE -1:10
Scale -1:25
SCALE 1:25

KEY PLAN: OWNER: ENGINEER: MAIN CONTRACTOR: Document Title:


ARAB REPUBLIC OF EGYPT NATIONAL AUTHORITY FOR TUNNELS ENGINEERING CONSULTANTS' CONSORTIUM EL GIZA STATION
MINISTRY OF TRANSPORT (NOCE) (STATION NO.13)
WORKSHOP DRAWINGS
NATIONAL AUTHORITY FOR DIAPHRAGM WALLS - TYPE F-PANEL (P-022)-STEEL CAGE (P-024)

P.YOUSSEF DIMITRIOS
TUNNELS (NAT) Format: A1 Scale(s): 1:50 1:25 Pages: 2 /4 1st Issue Date: 24-10-2024
B 12/11/2024 B.FAYEK SAYED ALI ISSUED FOR APPROVAL
RIZOS File Name:
P.YOUSSEF DIMITRIOS T-402-S13-DWG-CV06-01024-B
A 24/10/2024 B.FAYEK SAYED ALI
RIZOS
ISSUED FOR APPROVAL B GREATER CAIRO METRO
THE ISSUER: PROJECT CONTRACT SUB SUB DOC
LINE 4PHASE 1 - NEW CP 402 ORASCOM CONSTRUCTION PHASE NO.
AREA
-TYPE DISCIPLINE NUMBER REV.
REV. DATE PREPARED CHECKED APPROVED REASON FOR ISSUE STATUS
BY BY BY CONTRACT Nº125 /METRO T 402 S13 DWG CV06 01024 B
COUPLERS DETAILS
Scale 1:25

Maintain spacing between couplers layer


to be the maximum bar diameter.

S-025 S-023

S-025 S-023

Coupler Elevation at B1 Slab


Scale 1:25
S-025 S-023
Coupler Elevation at B2 Slab
Scale 1:25

Coupler Elevation at B3 Slab


Scale 1:25

P-060 S-023

01/12/2024

Please refer to the Engineer comments at


first page.
Coupler Elevation at ROOF Slab
Scale 1:25
KEY PLAN: OWNER: ENGINEER: MAIN CONTRACTOR: Document Title:
ARAB REPUBLIC OF EGYPT NATIONAL AUTHORITY FOR TUNNELS ENGINEERING CONSULTANTS' CONSORTIUM EL GIZA STATION
MINISTRY OF TRANSPORT (NOCE) (STATION NO.13)
WORKSHOP DRAWINGS
NATIONAL AUTHORITY FOR DIAPHRAGM WALLS - TYPE F-PANEL (P-022)-STEEL CAGE (P-024)

P.YOUSSEF DIMITRIOS
TUNNELS (NAT) Format: A1 Scale(s): 1:50 1:25 Pages: 3 /4 1st Issue Date: 24-10-2024
B 12/11/2024 B.FAYEK SAYED ALI ISSUED FOR APPROVAL
RIZOS File Name:
P.YOUSSEF DIMITRIOS T-402-S13-DWG-CV06-01024-B
A 24/10/2024 B.FAYEK SAYED ALI
RIZOS
ISSUED FOR APPROVAL B GREATER CAIRO METRO
THE ISSUER: PROJECT CONTRACT SUB SUB DOC
LINE 4PHASE 1 - NEW CP 402 ORASCOM CONSTRUCTION PHASE NO.
AREA
-TYPE DISCIPLINE NUMBER REV.
REV. DATE PREPARED CHECKED APPROVED REASON FOR ISSUE STATUS
BY BY BY CONTRACT Nº125 /METRO T 402 S13 DWG CV06 01024 B
a a a

a a

The bar bending and re-bar weight schedules


are not for approval.

Please refer to the Engineer comments at


first page.

A E
a4
a1

D
B

a3
01/12/2024
a2

KEY PLAN: OWNER: ENGINEER: MAIN CONTRACTOR: Document Title:


ARAB REPUBLIC OF EGYPT NATIONAL AUTHORITY FOR TUNNELS ENGINEERING CONSULTANTS' CONSORTIUM EL GIZA STATION
MINISTRY OF TRANSPORT (NOCE) (STATION NO.13)
WORKSHOP DRAWINGS
NATIONAL AUTHORITY FOR DIAPHRAGM WALLS - TYPE F-PANEL (P-022)-STEEL CAGE (P-024)

P.YOUSSEF DIMITRIOS
TUNNELS (NAT) Format: A1 Scale(s): 1:50 1:25 Pages: 4/4 1st Issue Date: 24-10-2024
B 12/11/2024 B.FAYEK SAYED ALI ISSUED FOR APPROVAL
RIZOS File Name:
P.YOUSSEF DIMITRIOS T-402-S13-DWG-CV06-01024-B
A 24/10/2024 B.FAYEK SAYED ALI
RIZOS
ISSUED FOR APPROVAL B GREATER CAIRO METRO
THE ISSUER: PROJECT CONTRACT SUB SUB DOC
LINE 4PHASE 1 - NEW CP 402 ORASCOM CONSTRUCTION PHASE NO.
AREA
-TYPE DISCIPLINE NUMBER REV.
REV. DATE PREPARED CHECKED APPROVED REASON FOR ISSUE STATUS
BY BY BY CONTRACT Nº125 /METRO T 402 S13 DWG CV06 01024 B

You might also like