0% found this document useful (0 votes)
8 views1 page

From TO Sludge Line / Awtp East To Eto Pit Sludge Box (Pipeline #26-E)

The document is a key plan for a proposed pipeline project, detailing various stationing points and existing infrastructure. It includes information on proposed and existing pipelines, power lines, and major contours, along with abbreviations for different trench types. The document is marked as confidential and proprietary to Bechtel Chile Ltda. and Yanacocha.

Uploaded by

oscar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views1 page

From TO Sludge Line / Awtp East To Eto Pit Sludge Box (Pipeline #26-E)

The document is a key plan for a proposed pipeline project, detailing various stationing points and existing infrastructure. It includes information on proposed and existing pipelines, power lines, and major contours, along with abbreviations for different trench types. The document is marked as confidential and proprietary to Bechtel Chile Ltda. and Yanacocha.

Uploaded by

oscar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3 4 5 6 7 8 9 10

KEY PLAN

AWTP
00 ESTE
A 8+1 A

9+400
9+30

9+500

10+400
EL THIS DRAWING

00
6"

00

10+600
10+

10+700

10+8
10+5
9+6
EL

10+200
0

00

300
6" +90

00
10

9 +7
9+2
00

PLANO N°26442-ST3-R2-16025-00030s6
0
80

10
9+

10+00

+1
EL

0
9+90

00
6"
EL

0
6"
PLAN ETO PIT
0
+ 10
9

0
00

STA. 11+000
9+
B B

s4
030
8+900
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS

-00
EL EL LEGEND

800 025
6" 6"

. 8+ 2-16
PROPOSED PIPELINE
EXISTING PIPELINES
STA T3-R
POWER LINES
-S

MAJOR CONTOUR
442
°26

EDGE OF ROAD
N

EXISTING GRADE
NO
PLA
Confidential. c 2025 Bechtel Chile Ltda. This document, prepared under Contract 26280 between Bechtel Chile Ltda. and Yanacocha., contains information confidential and/or proprietary
to Bechtel that is not to be used,disclosed, or reproduced in any form by any person or entity other than Bechtel or Yanacocha. without Bechtel s prior written permission. All rights reserved

C HORIZONTAL SCALE: 1:4000 ABBREVIATIONS C


NT NEW TRENCH
ET EXISTING TRENCH (FIELD VERIFY)

10+148 P.C. < 25°42'50" RT.

10+866 P.C. < 47°04'13" RT.


WT

10+175 P.T. < 25°42'50" RT.

10+907 P.T. < 47°04'13" RT.


10+085 P.C. < 10°43'45" LT.
10+098 P.T. < 10°43'45" LT.
WIDENED TRENCH (FIELD VERIFY)
< 10°13'07" RT.

< 24°00'08" RT.

10+349 P.C. < 9°10'17" RT.

< 6°46'30" RT.

< 2°56'11" RT.

< 2°20'40" RT.

< 3°30'00" RT.

10+952 P.I. < 45°00'00" LT.


< 10°13'07" RT.

< 24°00'08" RT.

10+359 P.T. < 9°10'17" RT.

< 6°46'30" RT.

< 2°56'11" RT.

< 2°20'40" RT.

< 3°30'00" RT.


8+852 P.C. < 13°48'38" LT.

8+907 P.C. < 22°39'37" LT.

< 11°26'00" LT.

10+032 P.C. < 3°30'57" LT.

10+132 P.C. < 9°29'52" LT.

10+254 P.C. < 7°45'11" LT.

< 3°10'53" LT.

< 2°06'40" LT.

< 1°53'28" LT.

< 3°31'49" LT.

< 9°30'43" LT.

10+940 P.C. < 4°29'28" LT.


8+868 P.T. < 13°48'38" LT.

8+934 P.T. < 22°39'37" LT.

< 11°26'00" LT.

10+038 P.T. < 3°30'57" LT.

10+143 P.T. < 9°29'52" LT.

10+265 P.T. < 7°45'11" LT.

< 3°10'53" LT.

< 2°06'40" LT.

< 1°53'28" LT.

< 3°31'49" LT.

< 9°30'43" LT.

10+944 P.T. < 4°29'28" LT.


9+263 P.I. < 45°00'00" RT.

9+288 P.I. < 45°00'00" RT.


9+252 P.C. < 7°03'29" RT.

< 1°44'59" RT.

< 6°45'55" RT.

< 4°52'55" RT.

9+517 P.C. < 4°33'11" RT.

9+618 P.C. < 0°45'06" RT.

< 1°50'58" RT.

< 2°35'23" RT.

< 0°34'41" RT.

< 5°09'50" RT.


8+881 P.I. < 45°00'00" LT.

8+899 P.I. < 45°00'00" LT.

9+261 P.T. < 7°03'29" RT.

< 1°44'59" RT.

< 6°45'55" RT.

< 4°52'55" RT.

9+523 P.T. < 4°33'11" RT.

9+619 P.T. < 0°45'06" RT.

< 1°50'58" RT.

< 2°35'23" RT.

< 0°34'41" RT.

< 5°09'50" RT.


8+818 P.C. < 0°39'46" LT.

9+224 P.C. < 8°30'08" LT.

< 5°11'50" LT.

< 5°02'47" LT.

< 1°48'57" LT.

< 3°10'39" LT.

9+419 P.C. < 0°56'35" LT.

< 2°54'46" LT.

< 4°26'14" LT.

< 7°22'52" LT.


8+820 P.T. < 0°39'46" LT.

9+238 P.T. < 8°30'08" LT.

< 5°11'50" LT.

< 5°02'47" LT.

< 1°48'57" LT.

9+393 P.T. < 3°10'39" LT.

9+420 P.T. < 0°56'35" LT.

< 2°54'46" LT.

< 4°26'14" LT.

< 7°22'52" LT.

10+017 EXISTING ROAD


10+023 EXISTING ROAD

10+169 EXISTING ROAD


10+204 EXISTING ROAD

10+958 EXISTING ROAD


10+970 EXISTING ROAD
9+268 EXISTING ROAD
9+291 EXISTING ROAD

EOC EXISTING OTHER CONTAINMENT


STATIONING PIP PIPE IN PIPE
AG ABOVE GRADE

10+411 P.C.

10+457 P.C.

10+522 P.C.

10+562 P.C.

10+656 P.C.

10+695 P.C.

10+712 P.C.

10+744 P.C.

10+768 P.C.
10+418 P.T.

10+460 P.T.

10+525 P.T.

10+565 P.T.

10+658 P.T.

10+698 P.T.

10+718 P.T.

10+750 P.T.

10+784 P.T.
9+069 P.C.

9+131 P.C.

9+305 P.C.

9+322 P.C.

9+343 P.C.

9+355 P.C.

9+360 P.C.

9+372 P.C.

9+388 P.C.

9+726 P.C.

9+779 P.C.

9+823 P.C.

9+856 P.C.

9+879 P.C.

9+900 P.C.

9+956 P.C.

9+982 P.C.
9+087 P.T.

9+174 P.T.

9+312 P.T.

9+329 P.T.

9+345 P.T.

9+358 P.T.

9+369 P.T.

9+379 P.T.

9+729 P.T.

9+782 P.T.

9+824 P.T.

9+858 P.T.

9+883 P.T.

9+919 P.T.

9+965 P.T.

9+995 P.T.
BG BELOW GRADE
VSP AIR VALVE
VBF BUTTERFLY VALVE
F FLANGE
3820 3820
EL ELBOW
3770 3770 VICC VICTAULIC COUPLING
CON RED CONCENTRIC REDUCER
D D
3720 EXISTING GRADE 3720 ECC RED ECCENTRIC REDUCER
TP OD/DR_OD/DR OF TRANSITION PIECE
PROFILE 3670 3670
FE FLOW METER

3620 3620
REFERENCES
3570 3570
REF-1 TYPICAL MAIN ROAD CROSSING 26442-ST3-R1-06025-00001
3520 3520 REF-2 TYPICAL SECONDARY ROAD CROSSING
26442-ST3-R1-06025-00002

VERTICAL SCALE: 1:4000


8+800 8+900 9+000 9+100 9+200 9+300 9+400 9+500 9+600 9+700 9+800 9+900 10+000 10+100 10+200 10+300 10+400 10+500 10+600 10+700 10+800 10+900 11+000 REF-3 TYPICAL PIPELINE CROSSING 26442-ST3-R1-06025-00006
REF-4 TYPICAL PIPELINE SUPPORTS 26442-ST3-R1-06025-00007
MATERIAL CS 6" API 5L-X52N-PSL2 , SMLS , BE , SCH 120
REF-5 TYPICAL AIR VALVES 26442-ST3-R1-06025-00009
PIPE LENGTH 2200 m REF-6 TYPICAL CREEK CROSSING 26442-ST3-R1-06025-00004
CLASS (NOTE 6) C3J6EX1 REF-7 TYPICAL POND DISCHARGE 26442-ST3-R1-06025-00008
E REF-8 TYPICAL PIPE IN PIPE 26442-ST3-R1-06025-00010 E
EL 45°

EL 45°

EL 45°

EL 45°

10+958 EL 45°

10+971 EL 45°
VICC
VICC

10+017 VICC

10+023 VICC

10+189 VICC
10+204 VICC

10+911 VICC
10+957 VICC

10+970 VICC
REF-9 TYPICAL TIE-IN 26442-ST3-R1-06025-00011
OTHER MATERIAL REF-10 TYPICAL TRENCHES 26442-ST3-R1-06025-00005
8+885

8+902

9+267

9+292
9+268
9+291

REF-11 TYPICAL PIPELINE VALVE 26442-ST3-R1-06025-00012


REF-12 TYPICAL FLOW METER ON PIPELINE 26442-ST3-R1-06025-00013
REF-14
REF-14

REF-14
REF-14

REF-14
REF-14

REF-14
REF-14
REF-14
REF-2

REF-2

REF-2

REF-2
REF-13 PIPELINE KEY MAP 26442-ST3-R0-06025-00010
REFERENCE
DRAWING REF-14 VICTAULIC COUPLING 26442-ST3-R0-06025-00012
REF-15 CHOKE STATION LAYOUT 26442-ST3-P1-36020-00011
CONSTRUCTION AG
AG BG AG BG AG BG AG BG
METHOD
CROSSING ID (REF-13) RC2-3304 RC2-3307 RC2-3308 RC2-3314
PIPELINE 26 EAST - STEADY STATE AND TRANSIENT ANALYSIS 26442-ST3-K0C-16025-000011. ALL DIMENSIONS IN METERS UNLESS OTHERWISE NOTED
PIPING & INSTRUMENTATION DIAGRAM PUMPING STATIONS - OESTE ETO PIT 26442-ST3-M6-36020-070042. START/END/ELEVATION TO ALIGN WITH PIPING.
P&ID AWTP - ESTE REACTOR A SLUDGE RECYCLE AND PURGE PUMPS 26442-ST3-M6-16045-040103. CONTRACTOR TO FIELD VERIFY ALL UTILITY CROSSINGS. YANACOCHA
F YANACOCHA APPROVALDATE SCALE H: 1:4000 V: 1:4000 DATE YANACOCHA WATER TREATMENT PROJECT - STAGE 3 F

BECHTEL
AWTP ESTE - PIPELINES CONNECTIOS 26442-ST3-R0-16025-000014. THE REFERENCE COORDINATE SYSTEM USED IS WGS84 ZONE 17 SOUTH. DESIGNED Lobo Digitally signed by:
Lobo Guillen, Omar
DRAWN:
Guillen,
Lobo
Digitally signed by:
Lobo Guillen, Omar
(OLOBOGU)
Guillen,
O. LOBO 25-OCT-2023
(OLOBOGU) DN: CN = Lobo
DN: CN = Lobo Guillen,
Omar
Guillen, Omar

O. Omar Omar(OLOBOGU) C =

LOBOMiller,
SLUDGE LINE / AWTP EAST
(OLOBOGU) C =

26442-ST3-R2-16025-000015. TOPOGRAPHY BASED ON A SURVEY CONDUCTED BY BECHTEL BETWEENENG. MANAGER:


BY: US O = Bechtel
(OLOBOGU Corporation (OLOBO
US O = Bechtel

PIPELINE GENERAL ARRANGEMENT PLAN - AWTP ESTE CHECKED


)
Date: 2025.03.31 10:52:
24 -05'00'

Vichitra,
EGS:
Digitally signed by:
Digitally signed
Corporation
Date: 2025.03.31
GU) by: Miller, Timothy
10:52:36 -05'00'

DN: CN = Miller,

Timoth
Vichitra, Noon
Timothy C = US O

T. MILLER 25-OCT-2023
(NVICHITR)
Bustos Noon Digitally signed by: Bustos
DN: CN = Vichitra, Noon
= Bechtel
BY:A. BUSTOS/N. VICHITRA
Valenzuela, Alejandro
(NVICHITR) C = US O =
Valenzuela, (AIBUSTOS)

(NVICHIT DN: CN = Bustos Valenzuela, Bechtel Corporation


Corporation

TO ETO PIT SLUDGE BOX (PIPELINE #26-E)


Alejandro

y
Alejandro(AIBUSTOS) C = US O Date: 2025.03.31 16:40:

PIPING & INSTRUMENTATION DIAGRAM PIPELINES (ESTE) 26442-ST3-M6-16025-08002 MARCH AND NOVEMBER 2023. (FOR THIS AREA SEE DOCUMENTS:
= Bechtel Corporation
R)
(AIBUSTOS) Date: 2025.03.31 13:05:39 -03'00'
30 -05'00'
Date: 2025.03.31
18:15:00 -05'00'
Vichitra, PROJ. MANAGER: P. ENG: Zambrano Hernandez, Cesar(CGZAMBRA)
Digitally signed by: Zambrano

C. ZAMBRANO 1-Abr-2025
DN: CN = Zambrano
Hernandez, Hernandez, Cesar(CGZAMBRA)

Moya,
C = US O = Bechtel

Bustos Noon Miller,


Digitally signed by: Zambrano Cesar Corporation
Date: 2025.04.01 07:59:40 -

Lobo
Digitally signed by: Lobo Miller, Timothy Hernandez, (CGZAMBRA) 03'00'
Patricio
Guillen, Omar(OLOBOGU) Valenzuela,
(NVICHITR) DN: CN = Miller,

PLOT PLAN ACID WATER TREATMENT PLANT AWTP EAST


Cesar

Moya,
Digitally signed by: Moya,
Timoth
26442-ST3-P1-16045-00001 N°26442-320-CYR-6025-00001/00009/00019/00029/00040).
DN: CN = Lobo Guillen, Alejandro

FROMSTA. 8+800 TO STA. 11+000


Timothy C = US O =
Guillen, Omar(OLOBOGU) C = US (AIBUSTOS) Digitally signed by: Vichitra, Bechtel Corporation
(CGZAMBRA)
Digitally signed by: Moya, Patricio Patricio
ENG. MANAGER:
Digitally signed by: Bustos Digitally signed by: Zambrano

O = Bechtel Corporation Noon(NVICHITR) Hernandez, Cesar(CGZAMBRA) DN: CN = Moya, Patricio C = US


Date: 2025.03.31
Valenzuela, Alejandro(AIBUSTOS)

Omar y DN: CN = Moya, Patricio C =


DN: CN = Bustos Valenzuela, DN: CN = Zambrano Hernandez,
DN: CN = Vichitra, Noon O = Bechtel Corporation
Date: 2025.03.31 10:52:09
Alejandro(AIBUSTOS) C = US O =
18:14:46 -05'00' Cesar(CGZAMBRA) C = US O =

P. MOYA 1-Abr-2025
Bechtel Corporation
(NVICHITR) C = US O = Bechtel Corporation Date: 2025.04.01 09:01:38 -03'00'
US O = Bechtel Corporation
Date: 2025.03.31 13:05:54 -03'00'
-05'00' Date: 2025.04.01 07:59:18 -03'00'

(OLOBOGU) Bechtel Corporation

Patricio
Date: 2025.03.31 16:40:15 -
05'00'
Date: 2025.04.01 09:01:51 -
03'00'

000 1-Abr-2025 ISSUED FOR CONSTRUCTION OL AB/NV TM CZ\PM III MODIFICACION ESTUDIO IMPACTO AMBIENTAL PYR-DWG-06005-0-29-2001_06. SEE 26442-ST3-3PS-PB00-07001@07030 FOR PIPELINE MATERIAL CLASSES. DRAWING N°: REV.
Rev. DATE REVISION BY CHK. EGS PE/PEM REFERENCE DOCUMENTS NUMBER NOTES Job No. 26442 26442-ST3-R2-16025-00029s5 000
No.
This document has been prepared by Bechtel Chile Ltda. exclusively for Yanacocha. under Contract 26280 and is not to be relied upon by any person or entity other than Yanacocha. or used in conjuntion with any other project
Este documento ha sido preparado por Bechtel Chile Ltda. exclusivamente para Yanacocha. bajo el Contrato 26280 y no debe ser considerado como válido por ninguna persona o entidad distinta a Yanacocha o utilizado en relación con cualquier otro proyecto.
Level 3 - Bechtel Internal and Selected External Distribution. The paper size for the specified scale is A1 (594 x 841 mm).

You might also like