From TO Sludge Line / Awtp East To Eto Pit Sludge Box (Pipeline #26-E)
From TO Sludge Line / Awtp East To Eto Pit Sludge Box (Pipeline #26-E)
KEY PLAN
AWTP
00 ESTE
A 8+1 A
9+400
9+30
9+500
10+400
EL THIS DRAWING
00
6"
00
10+600
10+
10+700
10+8
10+5
9+6
EL
10+200
0
00
300
6" +90
00
10
9 +7
9+2
00
PLANO N°26442-ST3-R2-16025-00030s6
0
80
10
9+
10+00
+1
EL
0
9+90
00
6"
EL
0
6"
PLAN ETO PIT
0
+ 10
9
0
00
STA. 11+000
9+
B B
s4
030
8+900
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
-00
EL EL LEGEND
800 025
6" 6"
. 8+ 2-16
PROPOSED PIPELINE
EXISTING PIPELINES
STA T3-R
POWER LINES
-S
MAJOR CONTOUR
442
°26
EDGE OF ROAD
N
EXISTING GRADE
NO
PLA
Confidential. c 2025 Bechtel Chile Ltda. This document, prepared under Contract 26280 between Bechtel Chile Ltda. and Yanacocha., contains information confidential and/or proprietary
to Bechtel that is not to be used,disclosed, or reproduced in any form by any person or entity other than Bechtel or Yanacocha. without Bechtel s prior written permission. All rights reserved
10+411 P.C.
10+457 P.C.
10+522 P.C.
10+562 P.C.
10+656 P.C.
10+695 P.C.
10+712 P.C.
10+744 P.C.
10+768 P.C.
10+418 P.T.
10+460 P.T.
10+525 P.T.
10+565 P.T.
10+658 P.T.
10+698 P.T.
10+718 P.T.
10+750 P.T.
10+784 P.T.
9+069 P.C.
9+131 P.C.
9+305 P.C.
9+322 P.C.
9+343 P.C.
9+355 P.C.
9+360 P.C.
9+372 P.C.
9+388 P.C.
9+726 P.C.
9+779 P.C.
9+823 P.C.
9+856 P.C.
9+879 P.C.
9+900 P.C.
9+956 P.C.
9+982 P.C.
9+087 P.T.
9+174 P.T.
9+312 P.T.
9+329 P.T.
9+345 P.T.
9+358 P.T.
9+369 P.T.
9+379 P.T.
9+729 P.T.
9+782 P.T.
9+824 P.T.
9+858 P.T.
9+883 P.T.
9+919 P.T.
9+965 P.T.
9+995 P.T.
BG BELOW GRADE
VSP AIR VALVE
VBF BUTTERFLY VALVE
F FLANGE
3820 3820
EL ELBOW
3770 3770 VICC VICTAULIC COUPLING
CON RED CONCENTRIC REDUCER
D D
3720 EXISTING GRADE 3720 ECC RED ECCENTRIC REDUCER
TP OD/DR_OD/DR OF TRANSITION PIECE
PROFILE 3670 3670
FE FLOW METER
3620 3620
REFERENCES
3570 3570
REF-1 TYPICAL MAIN ROAD CROSSING 26442-ST3-R1-06025-00001
3520 3520 REF-2 TYPICAL SECONDARY ROAD CROSSING
26442-ST3-R1-06025-00002
EL 45°
EL 45°
EL 45°
10+958 EL 45°
10+971 EL 45°
VICC
VICC
10+017 VICC
10+023 VICC
10+189 VICC
10+204 VICC
10+911 VICC
10+957 VICC
10+970 VICC
REF-9 TYPICAL TIE-IN 26442-ST3-R1-06025-00011
OTHER MATERIAL REF-10 TYPICAL TRENCHES 26442-ST3-R1-06025-00005
8+885
8+902
9+267
9+292
9+268
9+291
REF-14
REF-14
REF-14
REF-14
REF-14
REF-14
REF-14
REF-2
REF-2
REF-2
REF-2
REF-13 PIPELINE KEY MAP 26442-ST3-R0-06025-00010
REFERENCE
DRAWING REF-14 VICTAULIC COUPLING 26442-ST3-R0-06025-00012
REF-15 CHOKE STATION LAYOUT 26442-ST3-P1-36020-00011
CONSTRUCTION AG
AG BG AG BG AG BG AG BG
METHOD
CROSSING ID (REF-13) RC2-3304 RC2-3307 RC2-3308 RC2-3314
PIPELINE 26 EAST - STEADY STATE AND TRANSIENT ANALYSIS 26442-ST3-K0C-16025-000011. ALL DIMENSIONS IN METERS UNLESS OTHERWISE NOTED
PIPING & INSTRUMENTATION DIAGRAM PUMPING STATIONS - OESTE ETO PIT 26442-ST3-M6-36020-070042. START/END/ELEVATION TO ALIGN WITH PIPING.
P&ID AWTP - ESTE REACTOR A SLUDGE RECYCLE AND PURGE PUMPS 26442-ST3-M6-16045-040103. CONTRACTOR TO FIELD VERIFY ALL UTILITY CROSSINGS. YANACOCHA
F YANACOCHA APPROVALDATE SCALE H: 1:4000 V: 1:4000 DATE YANACOCHA WATER TREATMENT PROJECT - STAGE 3 F
BECHTEL
AWTP ESTE - PIPELINES CONNECTIOS 26442-ST3-R0-16025-000014. THE REFERENCE COORDINATE SYSTEM USED IS WGS84 ZONE 17 SOUTH. DESIGNED Lobo Digitally signed by:
Lobo Guillen, Omar
DRAWN:
Guillen,
Lobo
Digitally signed by:
Lobo Guillen, Omar
(OLOBOGU)
Guillen,
O. LOBO 25-OCT-2023
(OLOBOGU) DN: CN = Lobo
DN: CN = Lobo Guillen,
Omar
Guillen, Omar
O. Omar Omar(OLOBOGU) C =
LOBOMiller,
SLUDGE LINE / AWTP EAST
(OLOBOGU) C =
Vichitra,
EGS:
Digitally signed by:
Digitally signed
Corporation
Date: 2025.03.31
GU) by: Miller, Timothy
10:52:36 -05'00'
DN: CN = Miller,
Timoth
Vichitra, Noon
Timothy C = US O
T. MILLER 25-OCT-2023
(NVICHITR)
Bustos Noon Digitally signed by: Bustos
DN: CN = Vichitra, Noon
= Bechtel
BY:A. BUSTOS/N. VICHITRA
Valenzuela, Alejandro
(NVICHITR) C = US O =
Valenzuela, (AIBUSTOS)
y
Alejandro(AIBUSTOS) C = US O Date: 2025.03.31 16:40:
PIPING & INSTRUMENTATION DIAGRAM PIPELINES (ESTE) 26442-ST3-M6-16025-08002 MARCH AND NOVEMBER 2023. (FOR THIS AREA SEE DOCUMENTS:
= Bechtel Corporation
R)
(AIBUSTOS) Date: 2025.03.31 13:05:39 -03'00'
30 -05'00'
Date: 2025.03.31
18:15:00 -05'00'
Vichitra, PROJ. MANAGER: P. ENG: Zambrano Hernandez, Cesar(CGZAMBRA)
Digitally signed by: Zambrano
C. ZAMBRANO 1-Abr-2025
DN: CN = Zambrano
Hernandez, Hernandez, Cesar(CGZAMBRA)
Moya,
C = US O = Bechtel
Lobo
Digitally signed by: Lobo Miller, Timothy Hernandez, (CGZAMBRA) 03'00'
Patricio
Guillen, Omar(OLOBOGU) Valenzuela,
(NVICHITR) DN: CN = Miller,
Moya,
Digitally signed by: Moya,
Timoth
26442-ST3-P1-16045-00001 N°26442-320-CYR-6025-00001/00009/00019/00029/00040).
DN: CN = Lobo Guillen, Alejandro
P. MOYA 1-Abr-2025
Bechtel Corporation
(NVICHITR) C = US O = Bechtel Corporation Date: 2025.04.01 09:01:38 -03'00'
US O = Bechtel Corporation
Date: 2025.03.31 13:05:54 -03'00'
-05'00' Date: 2025.04.01 07:59:18 -03'00'
Patricio
Date: 2025.03.31 16:40:15 -
05'00'
Date: 2025.04.01 09:01:51 -
03'00'
000 1-Abr-2025 ISSUED FOR CONSTRUCTION OL AB/NV TM CZ\PM III MODIFICACION ESTUDIO IMPACTO AMBIENTAL PYR-DWG-06005-0-29-2001_06. SEE 26442-ST3-3PS-PB00-07001@07030 FOR PIPELINE MATERIAL CLASSES. DRAWING N°: REV.
Rev. DATE REVISION BY CHK. EGS PE/PEM REFERENCE DOCUMENTS NUMBER NOTES Job No. 26442 26442-ST3-R2-16025-00029s5 000
No.
This document has been prepared by Bechtel Chile Ltda. exclusively for Yanacocha. under Contract 26280 and is not to be relied upon by any person or entity other than Yanacocha. or used in conjuntion with any other project
Este documento ha sido preparado por Bechtel Chile Ltda. exclusivamente para Yanacocha. bajo el Contrato 26280 y no debe ser considerado como válido por ninguna persona o entidad distinta a Yanacocha o utilizado en relación con cualquier otro proyecto.
Level 3 - Bechtel Internal and Selected External Distribution. The paper size for the specified scale is A1 (594 x 841 mm).