Method Statement Geotechnical Investigation
Method Statement Geotechnical Investigation
Contractor/ Equipment Supplier Transmittal TD-LT-CST-AMNT-C-01471 Submitted Date September 11th, 2024
Owner Transmittal Received Date
BATU HIJAU CCPP-1
10
11
12
13
14
15
16
1 of 1 11/09/2024
FOR CONSTRUCTION
OWNER:
OWNER’S PMC:
EPC CONSORTIUM:
PROJECT:
METHOD STATEMENT
GEOTECHNICAL INVESTIGATION
DOCUMENT TYPE:
RECORD OF REVISION
2 of 10
METHOD STATEMENT GEOTECHNICAL INVESTIGATION
C-TD-00AE-CLC050-105855
TABLE OF CONTENTS
Cover ....................................................................................................................................... 1
Record of Revisions ................................................................................................................. 2
Table of Contents .................................................................................................................... 3
Method Statement Geotechnical Investigation ..................................................................... 4
3 of 10
METHOD STATEMENT GEOTECHNICAL INVESTIGATION
C-TD-00AE-CLC050-105855
A. Scope of works:
Geo technical investigation to be carried out is to find the resistance value of the cone against the soil
that helps us to determine different mechanical properties of soil such as strength, bearing capacity, and
so on. The scope of work consists of two tests which are summarized as follows:
1. Cone Penetration Test (CPT) consisting of 46 points : 19 points for 150kV OHL and 17 points for 33kV
OHL. (See Attachment 1. CPT Location)
2. Standard Penetration Test (SPT)/boring test consisting of 10 points : 6 points for 150kV OHL and 4
points for 33kV OHL. (See Attachment 1. SPT Location)
3.1 Preparation:
a. Prepare a hole for inserting the cone for the first time, usually dug with a crowbar to a
depth of about 5 cm
b. Insert 4 pieces of anchor into the ground at the right position according to the location of
the loading frame;
4 of 10
METHOD STATEMENT GEOTECHNICAL INVESTIGATION
C-TD-00AE-CLC050-105855
c. Adjust the loading frame, so that the position of the frame is vertical;
d. Install manometers 0 MPa to 2 MPa and manometers 0 MPa to 5 MPa for testing soft soils,
or install manometers 0 MPa to 5 MPa and manometers 0 MPa to 25 MPa for testing hard
soils;
e. Check the hydraulic system by pressing the hydraulic piston using a piston lock, and if it is
insufficient, add oil and prevent air bubbles from forming in the system;
f. Place the load frame so that the hydraulic presses are directly above it;
g. Install the clamping beams on the anchors and tighten them by rotating the fixing bolts, so
that the load-bearing frames stand firmly and are firmly attached to the ground surface. If
it remains in motion during the test, add dead load on the clamp beams;
h. Connect the double cone with the inner rod and the head of the press pipe; in this position
the inner rod always protrudes about 8 cm above the nozzle head. If it is not long enough,
you can add a piece of steel with the same diameter as the inner rod.
5 of 10
METHOD STATEMENT GEOTECHNICAL INVESTIGATION
C-TD-00AE-CLC050-105855
3.3 Calculation
a. Perform calculations of the cone resistance (qc), shear resistance (fs), shear ratio (Rf), and
total shear (Tf) of the soil and describe the test results
b. Description of the results of the cone penetration test.
Draw a graph of the relationship between the variation of cone resistance (qc) and
depth (meters).
For the sondir test with double cones, describe the relationship between the shear
resistance (fs) and depth and the total shear (Tf) and depth.
If it is necessary to estimate the details of the soil from the data of the cone resistance
and shear resistance, draw a graph of the relationship between the shear ratio and the
depth.
6 of 10
METHOD STATEMENT GEOTECHNICAL INVESTIGATION
C-TD-00AE-CLC050-105855
CPT Workflow
START Preparation before testing Test preparation (Cone penetration) Reading of test result
Yes
Calculation and
graphing
FINISH
Safety Helmet
Safety glasses
Earplugs/Ear muffs
Coveralls
Hand gloves
Leg Wrap Chaps
Safety shoes
7 of 10
METHOD STATEMENT GEOTECHNICAL INVESTIGATION
C-TD-00AE-CLC050-105855
3. Sequence of operation:
Install the pipe handlebars along with the corebarell on the drilling machine, then drill soil
to a depth of 1.5 M then lift the pipe handlebars and corebarell back to remove the soil
sample from the corebarell.
Remove the soil sample from the corebarrel by pushing it using a water swiffel.
Shift the soil sample that had been taken into the corebox according to its depth.
Perform the SPT test, in the following way:
Insert the pipe handlebars along with the SPT tube to the ground floor
Install the 63,5 Kg hammer support by inserting it into the pipe handlebar.
Lift the hammer above the support.
Insert the pipe handlebar which has a length of 1.5 m into the hammer hole andattach it to
the support so that the hammer test does not miss out.
Mark the free fall height of the hammer as high as 76 cm, also mark the handlebar pipe as
high as 45 cm and divide it into 3 parts (each section is 15 cm)
8 of 10
METHOD STATEMENT GEOTECHNICAL INVESTIGATION
C-TD-00AE-CLC050-105855
Do the SPT test by stroking the hammer which makes the pipe handlebar inserting the soil
for 15 cm long. The first 15 cm movement of handlebar because of hammer stroke is
preliminary and not consider into the test calculation.
The number of hammer strokes is noted as (“N”) from the implementation of the SPT
formula. The “N” value shall be counting for the next 15 cm (2nd time and 3rd time
handlebar entering the soil after preliminary of first 15 cm stroke).
Remove the hammer and remove the pipe handlebar along with the SPT tube.
Repeat the SPT test every 1.5 m testing interval.
Insert the pipe handlebar along with the UDS tube to take soil samples
Lift up the pipe handlebar along with the UDS tube
Remove the UDS tube from the handlebar and store it in a safe place. Covering the sample
from direct sunlight and other foreign material
Perform UDS/DS sampling every 1,5 m interval.
Install the casing pipe in the borehole and continue to drill
Repeat the same procedure until reached required depth.
Groundwater samples will be taken from the borehole. Water samples were taken using a
bailer sampler as follows:
Groundwater level will be measured every day before drilling work started by using a water
level meter. The following step shall be taken to perform this activity:
The water level gauge is lowered into the borehole until the sensor hits the water and
produces a sound/signal. Record the depth as the groundwater level.
Repeat this action every day to get accurate result.
9 of 10
METHOD STATEMENT GEOTECHNICAL INVESTIGATION
C-TD-00AE-CLC050-105855
SPT Workflow
Demobilization
Drilling & Testing (Equipment &
Preparation Mobilization (Sampling, Manpower)
(Administration (Equipment & Site
START Groundwater
& Permiting) Manpower) Preparation
monitoring)
Lab.Test
Analysis &
Reporting
FINISH
10 of 10
T-36 Exis
T-35 Exis
N : 9006969.745
E : 479063.008
Z : 124.540
GANTRY
TOWER LILO T-2
X=479114.2331
Y=9006953.64
N : 9006984.474
E : 479029.059
Z : 134.405
150/33kV
future
125MVA
WIDTH)
(2M
1 TRENCH
TR CABLE
CUM
150/33kV
125MVA ROAD
WIDE
8M
2
TR
150/33kV
125MVA
3
TR
150/33kV
125MVA
1
A NGR
2 150/33kV4
TR
SLOPE 1:8
RAMP 125MVA
3
NGR
UP
B 4
NGR
5
C 6 NGR
=E02 =E01
=E03 7
LCP =E04 =E05 ACDB
LCP =E06
BUS-VT 8
=E07
ROOM
LCP LCP =E08 BATTERY-2 SWITCHGEAR
LCP LCP =E09 BATTERY-1
CH-1
LCP 8 9 10 DCDB UP
LCP
11
LCP 12 13 CH-1
PASSAGE
ROOM
1 2 4
3 RELAY 14
5 6 7 PASSAGE
ROOM
SAS
Y=9006909.2086
X=479067.0759
A
D
B
C
T-34 (New)
T-1 O
Z : 136 057.109
N : 9007766.071
R LIL
.342
TOWE
E : 478
TOWER LI T-1
N : 9007057.109
E : 478638.272
Z : 155.342
T-33 (New)
)
ew
(N
A
33
T-
N : 9007062.711
TOWER T-32
E : 478521.404
AA
Z : 155.848
E : 478 R T-31
Z : 125 7021.061
N : 900 283.008
.007
TOWE
T-31
Z : 118 6881.646
N : 900 86.123
TOWER
.989
E : 4779
E : 4776 R T-30
Z : 128 6759.558
N : 900 25.650
.380
TOWE
T-29
Z : 148 6670.918
N : 900 364.177
TOWER
.152
E : 477
E : 4769 T-28
Z : 161 6534.089
N : 900 61.823
TOWER
.333
7
Z : 135 674.074
R T-2
N : 9006729.011
.276
TOWE
E: 476
E : 4762 T-26
Z : 78.86965.004
N : 900 48.181
TOWER
63
AA
E : 475 R T-25
Z : 97.97240.873
831.563
50
TOWE
N : 900
T-241
WER .27
TO 475655 9.124
E : 90075002
N : 210.8
T-25
Z:
Z : 100 7253.354
N : 900 771.601
R
.593
TOWE
E : 475
T-231
WER .97
TO 475403 1.654
E : 90080609
N : 312.3
Z:
T-221
WER .94
TO 475278 6.564
E : 90083306
N : 340.1
Z:
T-217
WER .36
TO 475177560.406
:
E 90 08 64
N : 284.0
Z:
T-202
WER .75
TO 475005938.164
E : 9008
61
N : 188.6
Z:
T-19
48
WER .7
TO 474858261.136
E : 9009 78
N : 139.3
Z:
AA
T-187
WER .08
TO 474751 5.486
: 54
E 9009 3
N : 76.14
Z:
T-182
WER .67
TO 474435 0.882
E : 90101981
N : 127.4
Z:
6
R T-18
TOWE353.17
E : 474 0978.134 7 AA
N : 901 .520 R T-1
Z : 310 TOWE344.901
E : 474 0439.051
N : 901 .925
Z : 185
5
R T-1
TOWE162.26294
E : 474 1597.8
N : 901 .000
Z : 160
4
R T-1
TOWE092.46005
E : 474 2064.7 5 AA 7
N : 901 385 R T-1 R T-1
Z : 89. TOWE162.262 TOWE262.598
28
3 AA E : 474 1597.8
94 E : 474 0571.5
R T-1 N : 901 .365 N : 901 .989
TOWE014.757 Z : 285 Z : 219
E : 474 2397.615
N : 901583
Z : 89.
4 AA
R T-1
T-12
AA TOWE151.111
R E : 474 1804.361
TOWE903.178 N : 901 .742
E : 473 2724.910
Z : 142
N : 901 757
Z : 77.
1
R T-1
TOWE752.992
E : 473 3273.731 3
R T-1
N : 901482 TOWE936.368
Z : 12. 32
E : 473 2586.7
N : 901 .041
Z : 108
2
R T-11
TOWE819.79
E : 473 2880.712
N : 901 452
Z : 72.
0
T-141
N+ 9015138.880
ER .9 8
W 3592 8.34
E+ 473480.474
TO : 47 1368
E : 90 000
AA N : 8.
Z
T-945
ER .0 35
3
W 3532 2.
TO : 47 1390
AA E : 90 596
T-741 4 T-793 1 T-830 0 T-9 48 N : 8.
ER .1 52 ER .0 14 AA ER .3 9
Z
W 3439 2. W 3457 5. ER .8 81 T-801 W 3432 5.32
AA W 3435 8.
TO : 47 1475 TO : 47 1455 TO : 47 1442 ER .1 69
4 TO : 47 1410
T-6 00 9 E : 90 .113 E : 90 250 E : 90 750 W 3454 8. E : 90 808
ER 8.0 3 N : 12 N : 8. N : 6. TO : 47 1426 N : 7.
T-671 W 341 50.2 Z Z Z E : 90 696 Z
ER .5 4 TO : 47 014943 N : 6.
W 3359 0.09 E : 9 .4
Z
TO : 47 1513 N : 13
E : 90 .168 Z
N : 29
Z A
T-540
ER .8 31
3
W 3141 0.
TO : 47 1519
E : 90 .607
N : 77
Z
)
ED
IS 41 49
EV 9.7 .4
(R 72725288
T-5 E : 4 901 .365
:
ER N : 51
W Z
TO
ATTACHMENT 1
)
ED
IS
EV
(R
T-4 42
ER .1 4
W 13 2.49
TO : 47241517
E : 90 .500
N : 40
Z
AA
T-321 0
ER .7 88
W 2246 1.
TO : 47 1519
E : 90 .177
N : 33
Z
AA
T-2 07
ER .8 256
) W 1937 7.
D TO : 47 1533
SE E : 90 .668
PE N : 78
RO Z
(P
T-0 73
ER .1 2
W 1812 7.28
TO : 47 1570
E : 90 .678
N : 27
Z T-316
ER .7 213
W 2052 4.
TO : 47 1517
E : 90 .023
R9000
5.650
0.000
PN+48
N : 55
PE+49
GATE
ROAD
Z
MAIN
WIDE
R9000
6m
48 ROAD
TP-11
WIDE
6m
R9000
TOILET
STORE
GUARD ROOM
51
8.600
.300
PE+414
PN+49
R6000
LOG(TYP)
52
STOP
44
47
SCREEN
8.100
3.300
60
PN+48
PE+38
t)
46
68
98
25
an
20
8.100
5.300
ROAD
PN+48
WIDE
21
PE+36
ROAD
NOTE6
r Pl
4m
24 WIDE
70
4m
22 48
90
8.000
53
.000
96
we
29
PN+48
93
PE+340
95 R9000
ROAD
92 31
53
(N .879 89
Po
55 A
WIDE
NOTE5
23
TP-23
T-2 38
91
B
try 10 3.1
6m
25
0.000
FIRE PUMP
CONTROL PANEL
ELECTRIC
101
R9000
2.900
54 ST20
ew
94
PN+49
D
an 4718 1575
16000
.400
PE+32
19
JOCKEY PUMP
PANEL
CONTROL
CONTROL
DIESEL PANEL
PUMP
.000
57
GT23
24 TP-23
PN+303
ROAD
69 C
PE+476
ER .4 1
WIDE
90 45 TP-20
0.000
99
4.700
96
= 90
6m
100
NOTE5
PN+49
59 93
PE+30
18
49
92
95
56
W 1836 1.03
=
17
ROAD
16000 31
19
TP-22
23
WIDE
N
71
ROAD
GT22
ROAD
ST10
91
6m
42
6000
WIDE
11 16
E
99
WIDE
6m
97 TP-21
15
68 94 43
100
101
STD 1
TO : 47 1541
G
NOTE5
4m
STD
S3 TD
24
56 10
100
18 98
58 14
TP-21
16000
900
PN+339.
61 8 17
PE+408.
5
19
TP-1
GT21
ROAD
9 7
ROAD
JANITOR-1
WIDE
11 20
ROAD
30
16 21
E : 90 .434
4m
WIDE
62 26 99
97
2.000
WIDE
15
0.000
STD
1 TD
S
2
3
4
MALE
100 50
4m
TOILET
22
FEMALE
10 18
NOTE5
6m
ROOM TOILET
PN+46
ROOM
LABORATORY ELECTRICAN JANITOR
PE+30
ROOM
14 38
INSTRUMENTATION
LABORATORY
ROOM LOCKER
17 29
16000
CHEMICAL
LABORATORY
ROOM
3 28
300
39
ROOM
8
PANTRY
63 TP-24
2
100
PN+299.
ROOM
5
6 19
36
MEETING
PE+403.
GT13
N : 94
9
7
AT#10
SIDE
LV
OFFICE
11
ROAD
HV SIDE
64 16 AT#12 LV SIDE R6000
ROOM
26 4 97
WIDE
TOOL
MECH.
15 99
SIDE
STD
HV
66
NOTE5
STD 2 TD
1
S
3
4
ROOM
NOTE5
TP-15B
AT#11
6m
SIDE
LV
TOOL
10
E&I
100
1
SIDE
41
NGR#22 HV
Z
18
16000
14
SIDE
UAT#22 LV
3
17
8
HV SIDE
67 2 5
NGR#21
65
LV SIDE
6 19
UAT#21
32000
9
HV SIDE
7
0.000
GT12
T)
NGR#12
WAREHOUSE
0.000
ROAD
11 ROAD
UAT#12
LV SIDE
26
16 37
TP-9
PN+43
WIDE
97 99
SIDE
4
WIDE
HV
PE+30
NGR#11
32000
1 15 68
6m STD
1 TD
S
2
4m NOTE5
STD
STD
4
3
LV SIDE
UAT#11
100
10
18
SIDE
HV
14
AN
3
17 40
2
6.500
8
16000
4.000
5
27
19
6
PN+44
BATT
9 GT11
BATT
BATT
PE+27
ROAD
ROAD
7
26
11
30
BATT
16
BATT
8.000
BATT
WIDE
WIDE
.000
99
1 97 35
PL
4
STD
3 TD
S
4 STD STD
1
2
12
4m
6m
PN+39
PE+300
R6000 100
10
34000 13
15 18
3 28
17
2
8
4.000
14
5 27
0.000
6
9
ROAD
PN+36
11
ER
16
PE+30
WIDE
97
4
26
STD
1
12
6m
STD
S3 TD
24
1
10
32000
13 15
8
72
2
3
14
GT
5
6
W
2.000
FUTURE
.000
9 7
PE+300
PN+33
26
4
PO
1
D)
32000
2 3
6
EW SE
.530
15,886
8
34000
651.10
TN+9,0
0.000/STACK
PE
E+471,
(N
.000/T
HRSG#1
PN+30
PE+300
RY .744408 RO
NT 1783 1. (P
GA : 47 1573 T-178 0
E : 90 .670 ER .8 28
N : 14 W 1794 8.
Z TO : 47 1554
E : 90 .111
N : 75
Z
AP-3
E=
N = 472012
9015 .000
Z=
6.98 902.58
3 3
AP-4
E=
4721
N= 21.1
Z = 901580 66
7.42 8.24
7 5
t) AP-2* AP-7
an E=
Pl N = 472369
Z = 901577 .752
er 5.36
5
5.80
0
Pow E=
AP-8
ew N = 472439
Z=
9015 .466
(N 6.91 716.85
2 4
try
an AP
G E = -9
AP-1* N = 472515
Z = 901565 .933
6.18 3.01
AP AP 2 9
E = -5 E = -6
N = 472211 N = 472291
Z = 901576 .131 Z = 901576 .426
7.28 9.37 7.21 0.70
9 7 9 0 AP-1
E= 0
N = 472580 AP
9015 .327 -11
Z= E=
7.85 602.21 N = 472 B
1 4 6
Z = 901 61.4
8.7 553 40
80 4.8
76
AP
E= -12
N = 472 B
Z = 901 717.5
11 5483 27
.79
3 .231
AP-1
E= 4A
N = 472800
Z = 901537 .144
24.8 6.03
70 7
AP-1
E= 5A
N = 472961
9015 .269
Z=
62.6 305.09
34 1 AP
E = -16 A
N = 473082
Z = 901527 .634 AP-1
92.0
14
2.87 E= 7A
7 N = 473214
Z = 901525 .485
66.1 1.38
06 3 AP-1
E= 8 A
N = 473322
Z = 901522 .408
68.7 0.
72 282
P-19 A / AP-20*
E = 473537.460
N = 9015156.920
Z = 15.250
AP-21*
E = 473642.063
N = 9015157.627
Z = 18.961
E+ 473480.474
N+ 9015138.880
多功能
清真寺 厅
FGL +14.00M
AP-21 A
E = 473642.063
办公楼 N = 9015008.155
Z = 11.334
原
餐厅 材
料
实
验
室
更衣室 AP-21 B
E = 473642.063
N = 9014868.652
Z = 9.191
停车场 化验
医务
室
生活污
水处理
150m x 80 m
AP-21 C
E = 473642.063
N = 9014707.614
Z = 15.538
ION
SMISS
TRANTOWER
门
房
CAR CHECKING
FUTURE BELT
DUMP HOPPER
AP-21 D
E = 473642.063
N = 9014555.449
Z = 8.909
地磅
AP-21 E
E = 473642.063
N = 9014406.076
Z = 9.449
AP-22*
SEDIMENTATION POND
E = 473642.056
N = 9014256.837
Z = 26.935
AP-24*
E = 473736.455
N = 9014124.258
FGL +11.50M
Z = 13.554
水 泵
E+ 473480.474
N+ 9014219.160
消防房
间
维修车 AP-25*
E = 473744.327
N = 9014094.882
变配电
沉淀池
Z = 18.500
室
沉淀池
调
天然站气(甲
压 类)
AP-23*
E = 473680.398
N = 9014109.238
Z = 11.255