Method Statement Geotechnical Investigation

The document outlines the Method Statement for Geotechnical Investigation at the Batu Hijau CCPP-1 project, detailing the scope of work, which includes Cone Penetration Tests (CPT) and Standard Penetration Tests (SPT) to assess soil properties. It specifies the necessary tools, personal protective equipment, and the sequence of operations for conducting the tests. Additionally, it includes a record of revisions and comments from the owner and contractor, indicating that the document is approved for construction as of September 11, 2024.

Uploaded by

Natal Siahaan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views13 pages

Method Statement Geotechnical Investigation

The document outlines the Method Statement for Geotechnical Investigation at the Batu Hijau CCPP-1 project, detailing the scope of work, which includes Cone Penetration Tests (CPT) and Standard Penetration Tests (SPT) to assess soil properties. It specifies the necessary tools, personal protective equipment, and the sequence of operations for conducting the tests. Additionally, it includes a record of revisions and comments from the owner and contractor, indicating that the document is approved for construction as of September 11, 2024.

Uploaded by

Natal Siahaan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

COMMENT & RESPONSE SHEET

Contractor/ Equipment Supplier Transmittal TD-LT-CST-AMNT-C-01471 Submitted Date September 11th, 2024
Owner Transmittal Received Date
BATU HIJAU CCPP-1

PROJECT DOCUMENT NUMBER REV. DOCUMENT TITLE CATEGORY STATUS


C-TD-00AE-CDD110-105855 0 Method Statement Geotechnical Investigation IFC AFC
IFR A HO
IFB B VO
IFI C SS
IFC I
CRS No: TD-CRS-CST-AMNT-C-00097, Rev.: 0 As Built
Rev.
No OWNER'S COMMENT Discipline Comment By CONTRACTOR'S/EQUIPMENT SUPPLIER'S RESPONSE OWNER'S RESPONSE
No

1 A No Comments BV Mike Noted Closed

10

11

12

13

14

15

16

Remark of Status: Name by Approver


1. A = Approved
2. B = Approved with Note 5. HO = Hold
3.C = Not Approved 6. VO = Void
4. I = for Information 7. SS = Superseded Graham Hopps
CRS No: TD-CRS-CST-AMNT-C-00097, Rev.: 0

1 of 1 11/09/2024
FOR CONSTRUCTION

0 11.SEPT.24 EDWARD I.GIOVANNI I.GIOVANNI FOR CONSTRUCTION


A 17.MAR.23 EDWARD I.GIOVANNI I.GIOVANNI FOR REVIEW
REV DATE PREPARED CHECKED APPROVED STATUS

OWNER:

PT. AMMAN MINERAL NUSA TENGGARA

OWNER’S PMC:

BLACK & VEATCH

EPC CONSORTIUM:

PT SIEMENS ENERGY INDONESIA PT TWINK INDONESIA

PROJECT:

BATU HIJAU CCPP-1


TRANSMISSION AND DISTRIBUTION
DOCUMENT TITLE:

METHOD STATEMENT
GEOTECHNICAL INVESTIGATION
DOCUMENT TYPE:

□ Basic Engineering Document □ Detail Engineering Document □ Vendor Document ■ Other


PROJECT DOCUMENT NO. JOB NO: REV NO. SHT NO.
BH2309000pe For Siemens
C-TD-00AE-CDD110-105855 0 1/12
BH2309100pe For Twink
METHOD STATEMENT GEOTECHNICAL INVESTIGATION
C-TD-00AE-CLC050-105855

RECORD OF REVISION

Rev. Date Page Affected Description of Revision

A 17.MAR.2023 -- First Issue

0 11.SEPT.2024 -- For Construction

2 of 10
METHOD STATEMENT GEOTECHNICAL INVESTIGATION
C-TD-00AE-CLC050-105855

TABLE OF CONTENTS

Cover ....................................................................................................................................... 1
Record of Revisions ................................................................................................................. 2
Table of Contents .................................................................................................................... 3
Method Statement Geotechnical Investigation ..................................................................... 4

3 of 10
METHOD STATEMENT GEOTECHNICAL INVESTIGATION
C-TD-00AE-CLC050-105855

A. Scope of works:

Geo technical investigation to be carried out is to find the resistance value of the cone against the soil
that helps us to determine different mechanical properties of soil such as strength, bearing capacity, and
so on. The scope of work consists of two tests which are summarized as follows:
1. Cone Penetration Test (CPT) consisting of 46 points : 19 points for 150kV OHL and 17 points for 33kV
OHL. (See Attachment 1. CPT Location)
2. Standard Penetration Test (SPT)/boring test consisting of 10 points : 6 points for 150kV OHL and 4
points for 33kV OHL. (See Attachment 1. SPT Location)

B. Method Statement Cone Penetration Test (CPT) (regarding SNI 2827:2008)


1. Tools :
 Cone Penetrometer, a special tool that can penetrate into the ground (single cone or double
cone). For the Dutch Cone Penetrometer type Begemann is commonly used with a maximum
capacity of 250 kg/cm2.
 4 pieces of canal steel and anchors.
 2 manometers with each capacity:
 Light CPT : 0 to 50 kg/cm2 and
0 to 250 kg/cm2
 Heavy CPT: 0 to 59 kg/ cm2 and
0 to 600 kg/cm2
 2 pieces of wrench
 Inner rod
 Steel press pipe
 Crowbar / other replacement tool.
 Castor oil/SAE 10
 Roll meter and waterpass.
 Crank

2. Personal Protective Equipment :


 Safety Helmet
 Safety glasses
 Earplugs/Ear muffs
 Coveralls
 Hand gloves
 Leg Wrap Chaps
 Safety shoes
3. Sequence of operation :

3.1 Preparation:

a. Prepare a hole for inserting the cone for the first time, usually dug with a crowbar to a
depth of about 5 cm
b. Insert 4 pieces of anchor into the ground at the right position according to the location of
the loading frame;

4 of 10
METHOD STATEMENT GEOTECHNICAL INVESTIGATION
C-TD-00AE-CLC050-105855
c. Adjust the loading frame, so that the position of the frame is vertical;
d. Install manometers 0 MPa to 2 MPa and manometers 0 MPa to 5 MPa for testing soft soils,
or install manometers 0 MPa to 5 MPa and manometers 0 MPa to 25 MPa for testing hard
soils;
e. Check the hydraulic system by pressing the hydraulic piston using a piston lock, and if it is
insufficient, add oil and prevent air bubbles from forming in the system;
f. Place the load frame so that the hydraulic presses are directly above it;
g. Install the clamping beams on the anchors and tighten them by rotating the fixing bolts, so
that the load-bearing frames stand firmly and are firmly attached to the ground surface. If
it remains in motion during the test, add dead load on the clamp beams;
h. Connect the double cone with the inner rod and the head of the press pipe; in this position
the inner rod always protrudes about 8 cm above the nozzle head. If it is not long enough,
you can add a piece of steel with the same diameter as the inner rod.

3.2 Test Procedure :

3.2.1 Cone Penetration Testing


Perform a double cone penetration test using the following steps:
a. Fix the inner rod and pushpipe under hydraulic press in proper position;
b. Push/pull the adjuster to the ready-to-press position, so that the hydraulic presses
only press the pushpipe;
c. Turn the crank clockwise, so that the pressure gear and hydraulic pressure move
down and pressurize the outer pipe until it reaches a depth of 20 cm according to
the test interval;
d. At every 20 cm interval apply pressure to the inner rod by pulling the control lock,
so that the hydraulic press only presses the inner rod;
e. Rotate the crank clockwise and keep the cone penetration speed from 10 mm/s to
20 mm/s ± 5. While pressing the push rod, do not go down, because it will disrupt
the reading of the data.
3.2.2 Reading of test results
Take a reading of the results of the cone penetration test as follows:
a. Read the value of the cone resistance on the first 4 cm of inner rod pusher and
record it on the form (Table A) in column Cw ;
b. Read the sum of the value of the shear resistance and the value of the cone
resistance of the second rod presser approximately 4 cm deep and record them
on the form (Table. A) in column Tw.

5 of 10
METHOD STATEMENT GEOTECHNICAL INVESTIGATION
C-TD-00AE-CLC050-105855

Table A. Example of a cone penetration test result form


Location : PIC :
CPT No. : Date :
Elevation :
fs x
Depth Cw Tw Kw qc fs 20cm Tf Rf
kPa/100 kPa/100 kPa/100 kPa/100 kPa/100 kPa/100 kPa/100 (%)

3.2.3 Repeat the test steps


Repeat the above test steps until the cone resistance value reaches its maximum limit
(according to the capacity of the tool) or until a maximum depth of 20 m to 40 m is
reached or as needed. This applies to both light CPT and heavy CPT.
3.2.4 Test completion
a. Disconnect the press pipe, inner rod and double cone by pushing/pulling the
adjuster in the unplugged position and turning the crank counterclockwise.
b. Record any deviations during the test.

3.3 Calculation

a. Perform calculations of the cone resistance (qc), shear resistance (fs), shear ratio (Rf), and
total shear (Tf) of the soil and describe the test results
b. Description of the results of the cone penetration test.
 Draw a graph of the relationship between the variation of cone resistance (qc) and
depth (meters).
 For the sondir test with double cones, describe the relationship between the shear
resistance (fs) and depth and the total shear (Tf) and depth.
 If it is necessary to estimate the details of the soil from the data of the cone resistance
and shear resistance, draw a graph of the relationship between the shear ratio and the
depth.

6 of 10
METHOD STATEMENT GEOTECHNICAL INVESTIGATION
C-TD-00AE-CLC050-105855

CPT Workflow

START Preparation before testing Test preparation (Cone penetration) Reading of test result

Carry out the test at a depth of No


Is qc<tool capacity?
the next 20cm

Yes

Calculation and
graphing

FINISH

C. Method Statement Standard Penetration Test (SPT)


1. Tools :

 Drilling rig bore


 Drilling bore motor
 Pump
 Pump motor
 Rod AW Ø46mm 3m; 1.5m; 1m
 Casing Ø89 1,5m ; Ø114 1.5m
 Box accessoriess
 Box sparepart
 Hammer SPT
 Tripod 2” + skor tripod
 Delivery hose water swivle 9m
 Suction hose
 Pulley

2. Personal Protective Equipment :

 Safety Helmet
 Safety glasses
 Earplugs/Ear muffs
 Coveralls
 Hand gloves
 Leg Wrap Chaps
 Safety shoes

7 of 10
METHOD STATEMENT GEOTECHNICAL INVESTIGATION
C-TD-00AE-CLC050-105855
3. Sequence of operation:

3.4 Drilling Rig Positioning

 Ensure the drilling point by survey equipment.


 Placed the equipment for drilling at the appointed soil location.
 Install the tripod with below step:
 Combine the lower section and upper section each leg of tripod by using the bolt and
should be tighten.
 Jointing the upper edge of each tripod legs with bolts and lock with a torque wrench.
 Install one unit of chain block at the upper edge of tripod.
 After the upper edge of tripod connected each other, therefore erect the tripod including
attached chain block manually. Each of tripod leg shall be hold by one person crew
member. Then raise the tripod leg at the same time, by pushing the each of tripod legs
forward.
 After the tripod had stand up, install the bracing pipe support at the bottom and at the
upper level of tripod.
 Install drilling water supply (water pumps, hoses, and others) and ensure the watertank is
available.
 Set up and adjust the drilling machine by using tripod to the correct position of drilling
point
 After setting up drilling machine completed, then check the safety and equipment by Site
Civil Engineer and Drilling Coordinator, equipment position shall be firm, and steady by
using levelling tool. Ensure the base/foundation at the bottom of the rig flat and balanced
position. Provide a container vessel oil spill (spill kit and 0il absorbent). Provide APAR, First
aid kit and emergency eye wash in the work area.Check the entire machine (check the
bolts on the engine, oil in the gearbox, and spindle) and other materials that will be used
for drilling. The daily checklist shall be signed off by drilling coordinator If there are no
problems, then proceed with starting the drilling engine by startingwith the engine in a
neutral position.

3.5 Borehole Drilling Activity

 Install the pipe handlebars along with the corebarell on the drilling machine, then drill soil
to a depth of 1.5 M then lift the pipe handlebars and corebarell back to remove the soil
sample from the corebarell.
 Remove the soil sample from the corebarrel by pushing it using a water swiffel.
 Shift the soil sample that had been taken into the corebox according to its depth.
 Perform the SPT test, in the following way:
 Insert the pipe handlebars along with the SPT tube to the ground floor
 Install the 63,5 Kg hammer support by inserting it into the pipe handlebar.
 Lift the hammer above the support.
 Insert the pipe handlebar which has a length of 1.5 m into the hammer hole andattach it to
the support so that the hammer test does not miss out.
 Mark the free fall height of the hammer as high as 76 cm, also mark the handlebar pipe as
high as 45 cm and divide it into 3 parts (each section is 15 cm)

8 of 10
METHOD STATEMENT GEOTECHNICAL INVESTIGATION
C-TD-00AE-CLC050-105855
 Do the SPT test by stroking the hammer which makes the pipe handlebar inserting the soil
for 15 cm long. The first 15 cm movement of handlebar because of hammer stroke is
preliminary and not consider into the test calculation.
 The number of hammer strokes is noted as (“N”) from the implementation of the SPT
formula. The “N” value shall be counting for the next 15 cm (2nd time and 3rd time
handlebar entering the soil after preliminary of first 15 cm stroke).
 Remove the hammer and remove the pipe handlebar along with the SPT tube.
 Repeat the SPT test every 1.5 m testing interval.
 Insert the pipe handlebar along with the UDS tube to take soil samples
 Lift up the pipe handlebar along with the UDS tube
 Remove the UDS tube from the handlebar and store it in a safe place. Covering the sample
from direct sunlight and other foreign material
 Perform UDS/DS sampling every 1,5 m interval.
 Install the casing pipe in the borehole and continue to drill
 Repeat the same procedure until reached required depth.

3.6 Rig Moving

 Remove the tripod leg bracing.


 Pull 1 tripod pole and hold the remaining 2 tripod poles to lowering the tripod to the
ground,
 Remove the bolts attached to the tripod pole and move the tripod to the next drilling
point,
 Move the drilling machine and drill equipment to the next point,
 Repeat the same test sequences.

3.7 Groundwater Sampling

Groundwater samples will be taken from the borehole. Water samples were taken using a
bailer sampler as follows:

 The bailer sampler is lowered into the borehole


 Move the bailer up and down (Pulsing movement) to sample the groundwater
 Hoist the filled bailer sampler.
 Empty the sampler in the bucket to measure groundwater quality by using the PH Tester.
 Once the water quality parameters have been stabilized, the water samples will be
collected and stored using the sample bottle.

3.8 Groundwater Monitoring

Groundwater level will be measured every day before drilling work started by using a water
level meter. The following step shall be taken to perform this activity:

 The water level gauge is lowered into the borehole until the sensor hits the water and
produces a sound/signal. Record the depth as the groundwater level.
 Repeat this action every day to get accurate result.

9 of 10
METHOD STATEMENT GEOTECHNICAL INVESTIGATION
C-TD-00AE-CLC050-105855

SPT Workflow

Demobilization
Drilling & Testing (Equipment &
Preparation Mobilization (Sampling, Manpower)
(Administration (Equipment & Site
START Groundwater
& Permiting) Manpower) Preparation
monitoring)
Lab.Test

Analysis &
Reporting

FINISH

10 of 10
T-36 Exis
T-35 Exis

N : 9006969.745
E : 479063.008

Z : 124.540
GANTRY
TOWER LILO T-2

X=479114.2331
Y=9006953.64
N : 9006984.474
E : 479029.059

Z : 134.405
150/33kV
future
125MVA
WIDTH)
(2M
1 TRENCH
TR CABLE
CUM
150/33kV
125MVA ROAD
WIDE
8M
2
TR
150/33kV
125MVA
3
TR
150/33kV
125MVA
1
A NGR
2 150/33kV4
TR
SLOPE 1:8
RAMP 125MVA

3
NGR

UP
B 4
NGR
5
C 6 NGR
=E02 =E01
=E03 7
LCP =E04 =E05 ACDB
LCP =E06
BUS-VT 8

=E07
ROOM
LCP LCP =E08 BATTERY-2 SWITCHGEAR
LCP LCP =E09 BATTERY-1

CH-1
LCP 8 9 10 DCDB UP

LCP

11
LCP 12 13 CH-1

PASSAGE
ROOM
1 2 4
3 RELAY 14
5 6 7 PASSAGE
ROOM
SAS

Y=9006909.2086
X=479067.0759
A

D
B

C
T-34 (New)

T-1 O
Z : 136 057.109
N : 9007766.071
R LIL

.342
TOWE
E : 478
TOWER LI T-1
N : 9007057.109
E : 478638.272

Z : 155.342

T-33 (New)
)
ew
(N
A
33
T-

N : 9007062.711
TOWER T-32
E : 478521.404

AA
Z : 155.848

E : 478 R T-31

Z : 125 7021.061
N : 900 283.008
.007
TOWE

T-31
Z : 118 6881.646
N : 900 86.123
TOWER

.989
E : 4779

E : 4776 R T-30

Z : 128 6759.558
N : 900 25.650
.380
TOWE

T-29
Z : 148 6670.918
N : 900 364.177
TOWER

.152
E : 477
E : 4769 T-28

Z : 161 6534.089
N : 900 61.823
TOWER

.333

7
Z : 135 674.074
R T-2
N : 9006729.011
.276
TOWE
E: 476
E : 4762 T-26

Z : 78.86965.004
N : 900 48.181
TOWER

63
AA
E : 475 R T-25

Z : 97.97240.873
831.563

50
TOWE
N : 900
T-241
WER .27
TO 475655 9.124
E : 90075002
N : 210.8

T-25
Z:

Z : 100 7253.354
N : 900 771.601
R

.593
TOWE
E : 475
T-231
WER .97
TO 475403 1.654
E : 90080609
N : 312.3
Z:
T-221
WER .94
TO 475278 6.564
E : 90083306
N : 340.1
Z:
T-217
WER .36
TO 475177560.406
:
E 90 08 64
N : 284.0
Z:
T-202
WER .75
TO 475005938.164
E : 9008
61
N : 188.6
Z:
T-19
48
WER .7
TO 474858261.136
E : 9009 78
N : 139.3
Z:
AA
T-187
WER .08
TO 474751 5.486
: 54
E 9009 3
N : 76.14
Z:
T-182
WER .67
TO 474435 0.882
E : 90101981
N : 127.4
Z:
6
R T-18
TOWE353.17
E : 474 0978.134 7 AA
N : 901 .520 R T-1
Z : 310 TOWE344.901
E : 474 0439.051
N : 901 .925
Z : 185
5
R T-1
TOWE162.26294
E : 474 1597.8
N : 901 .000
Z : 160
4
R T-1
TOWE092.46005
E : 474 2064.7 5 AA 7
N : 901 385 R T-1 R T-1
Z : 89. TOWE162.262 TOWE262.598
28
3 AA E : 474 1597.8
94 E : 474 0571.5
R T-1 N : 901 .365 N : 901 .989
TOWE014.757 Z : 285 Z : 219
E : 474 2397.615
N : 901583
Z : 89.
4 AA
R T-1
T-12
AA TOWE151.111
R E : 474 1804.361
TOWE903.178 N : 901 .742
E : 473 2724.910
Z : 142
N : 901 757
Z : 77.
1
R T-1
TOWE752.992
E : 473 3273.731 3
R T-1
N : 901482 TOWE936.368
Z : 12. 32
E : 473 2586.7
N : 901 .041
Z : 108
2
R T-11
TOWE819.79
E : 473 2880.712
N : 901 452
Z : 72.
0
T-141
N+ 9015138.880
ER .9 8
W 3592 8.34
E+ 473480.474
TO : 47 1368
E : 90 000
AA N : 8.
Z
T-945
ER .0 35
3
W 3532 2.
TO : 47 1390
AA E : 90 596
T-741 4 T-793 1 T-830 0 T-9 48 N : 8.
ER .1 52 ER .0 14 AA ER .3 9
Z
W 3439 2. W 3457 5. ER .8 81 T-801 W 3432 5.32
AA W 3435 8.
TO : 47 1475 TO : 47 1455 TO : 47 1442 ER .1 69
4 TO : 47 1410
T-6 00 9 E : 90 .113 E : 90 250 E : 90 750 W 3454 8. E : 90 808
ER 8.0 3 N : 12 N : 8. N : 6. TO : 47 1426 N : 7.
T-671 W 341 50.2 Z Z Z E : 90 696 Z
ER .5 4 TO : 47 014943 N : 6.
W 3359 0.09 E : 9 .4
Z
TO : 47 1513 N : 13
E : 90 .168 Z
N : 29
Z A
T-540
ER .8 31
3
W 3141 0.
TO : 47 1519
E : 90 .607
N : 77
Z
)
ED
IS 41 49
EV 9.7 .4
(R 72725288
T-5 E : 4 901 .365
:
ER N : 51
W Z
TO
ATTACHMENT 1

)
ED
IS
EV
(R
T-4 42
ER .1 4
W 13 2.49
TO : 47241517
E : 90 .500
N : 40
Z
AA
T-321 0
ER .7 88
W 2246 1.
TO : 47 1519
E : 90 .177
N : 33
Z
AA
T-2 07
ER .8 256
) W 1937 7.
D TO : 47 1533
SE E : 90 .668
PE N : 78
RO Z
(P
T-0 73
ER .1 2
W 1812 7.28
TO : 47 1570
E : 90 .678
N : 27
Z T-316
ER .7 213
W 2052 4.
TO : 47 1517
E : 90 .023
R9000

5.650
0.000
PN+48
N : 55

PE+49
GATE
ROAD
Z

MAIN
WIDE

R9000
6m
48 ROAD
TP-11
WIDE
6m
R9000
TOILET
STORE
GUARD ROOM
51

8.600
.300
PE+414
PN+49

R6000
LOG(TYP)
52
STOP
44

47
SCREEN

8.100
3.300
60

PN+48
PE+38

t)
46
68

98
25

an
20

8.100
5.300
ROAD

PN+48
WIDE

21
PE+36
ROAD
NOTE6

r Pl
4m
24 WIDE
70
4m
22 48
90

8.000
53

.000
96

we
29

PN+48
93

PE+340
95 R9000

ROAD
92 31

53

(N .879 89
Po
55 A

WIDE
NOTE5
23
TP-23
T-2 38
91
B

try 10 3.1
6m

25
0.000

FIRE PUMP
CONTROL PANEL
ELECTRIC

101

R9000
2.900
54 ST20

ew
94
PN+49
D

an 4718 1575
16000

.400
PE+32
19
JOCKEY PUMP
PANEL
CONTROL
CONTROL
DIESEL PANEL
PUMP

.000
57

GT23
24 TP-23

PN+303
ROAD
69 C

PE+476
ER .4 1

WIDE
90 45 TP-20

0.000
99

4.700
96

= 90
6m

100
NOTE5

PN+49
59 93

PE+30
18

49
92
95
56
W 1836 1.03

=
17

ROAD
16000 31
19

TP-22
23

WIDE

N
71
ROAD
GT22

ROAD

ST10
91

6m
42

6000
WIDE
11 16

E
99
WIDE
6m
97 TP-21

15
68 94 43

100

101
STD 1
TO : 47 1541

G
NOTE5

4m
STD
S3 TD
24
56 10

100
18 98
58 14

TP-21
16000

900
PN+339.
61 8 17

PE+408.
5

19
TP-1

GT21
ROAD
9 7

ROAD
JANITOR-1
WIDE
11 20

ROAD
30
16 21
E : 90 .434
4m

WIDE
62 26 99
97

2.000

WIDE
15

0.000
STD
1 TD
S
2
3
4

MALE
100 50

4m
TOILET
22

FEMALE
10 18

NOTE5

6m
ROOM TOILET

PN+46
ROOM
LABORATORY ELECTRICAN JANITOR

PE+30
ROOM
14 38
INSTRUMENTATION
LABORATORY
ROOM LOCKER
17 29

16000
CHEMICAL
LABORATORY
ROOM
3 28

300
39

ROOM
8

PANTRY
63 TP-24
2

100
PN+299.
ROOM

5
6 19

36
MEETING

PE+403.
GT13
N : 94

9
7

AT#10
SIDE
LV

OFFICE
11

ROAD
HV SIDE
64 16 AT#12 LV SIDE R6000

ROOM
26 4 97

WIDE

TOOL
MECH.
15 99
SIDE

STD
HV

66

NOTE5
STD 2 TD

1
S
3
4

ROOM
NOTE5
TP-15B

AT#11
6m
SIDE
LV

TOOL
10

E&I
100
1
SIDE
41
NGR#22 HV
Z
18

16000
14
SIDE
UAT#22 LV
3

17
8

HV SIDE
67 2 5

NGR#21
65

LV SIDE
6 19
UAT#21
32000
9

HV SIDE
7

0.000
GT12
T)

NGR#12
WAREHOUSE

0.000
ROAD
11 ROAD

UAT#12

LV SIDE
26
16 37
TP-9

PN+43
WIDE
97 99
SIDE
4
WIDE
HV

PE+30

NGR#11
32000
1 15 68
6m STD
1 TD
S
2
4m NOTE5
STD

STD
4
3

LV SIDE
UAT#11
100
10

18
SIDE
HV
14
AN

3
17 40
2

6.500

8
16000

4.000
5

27

19
6

PN+44
BATT
9 GT11

BATT
BATT

PE+27

ROAD

ROAD
7

26
11

30
BATT
16

BATT
8.000
BATT

WIDE

WIDE
.000

99
1 97 35
PL

4
STD
3 TD
S
4 STD STD
1
2

12

4m

6m
PN+39
PE+300
R6000 100
10
34000 13
15 18
3 28

17
2

8
4.000
14
5 27

0.000

6
9

ROAD
PN+36

11
ER

16
PE+30

WIDE
97

4
26
STD
1
12

6m
STD
S3 TD
24
1

10
32000
13 15
8

72
2

3
14

GT
5

6
W

2.000

FUTURE
.000
9 7

PE+300
PN+33
26
4
PO
1
D)
32000
2 3
6
EW SE

.530
15,886

8
34000

651.10
TN+9,0
0.000/STACK
PE

E+471,
(N

.000/T
HRSG#1
PN+30
PE+300
RY .744408 RO
NT 1783 1. (P
GA : 47 1573 T-178 0
E : 90 .670 ER .8 28
N : 14 W 1794 8.
Z TO : 47 1554
E : 90 .111
N : 75
Z
AP-3
E=
N = 472012
9015 .000
Z=
6.98 902.58
3 3

AP-4
E=
4721
N= 21.1
Z = 901580 66
7.42 8.24
7 5

t) AP-2* AP-7
an E=

Pl N = 472369
Z = 901577 .752
er 5.36
5
5.80
0

Pow E=
AP-8

ew N = 472439
Z=
9015 .466
(N 6.91 716.85
2 4
try
an AP
G E = -9
AP-1* N = 472515
Z = 901565 .933
6.18 3.01
AP AP 2 9
E = -5 E = -6
N = 472211 N = 472291
Z = 901576 .131 Z = 901576 .426
7.28 9.37 7.21 0.70
9 7 9 0 AP-1
E= 0
N = 472580 AP
9015 .327 -11
Z= E=
7.85 602.21 N = 472 B
1 4 6
Z = 901 61.4
8.7 553 40
80 4.8
76

AP
E= -12
N = 472 B
Z = 901 717.5
11 5483 27
.79
3 .231

AP-1
E= 4A
N = 472800
Z = 901537 .144
24.8 6.03
70 7

AP-1
E= 5A
N = 472961
9015 .269
Z=
62.6 305.09
34 1 AP
E = -16 A
N = 473082
Z = 901527 .634 AP-1
92.0
14
2.87 E= 7A
7 N = 473214
Z = 901525 .485
66.1 1.38
06 3 AP-1
E= 8 A
N = 473322
Z = 901522 .408
68.7 0.
72 282

P-19 A / AP-20*
E = 473537.460
N = 9015156.920
Z = 15.250
AP-21*
E = 473642.063
N = 9015157.627
Z = 18.961

E+ 473480.474
N+ 9015138.880
多功能
清真寺 厅
FGL +14.00M
AP-21 A
E = 473642.063
办公楼 N = 9015008.155
Z = 11.334


餐厅 材



更衣室 AP-21 B
E = 473642.063
N = 9014868.652
Z = 9.191
停车场 化验

医务

生活污
水处理

SPACE FOR AMNT FILTRATION PLANT


FGL +11.50M

150m x 80 m
AP-21 C
E = 473642.063
N = 9014707.614
Z = 15.538
ION
SMISS
TRANTOWER


CAR CHECKING

FUTURE BELT
DUMP HOPPER
AP-21 D
E = 473642.063
N = 9014555.449
Z = 8.909

地磅
AP-21 E
E = 473642.063
N = 9014406.076
Z = 9.449

AP-22*

SEDIMENTATION POND
E = 473642.056
N = 9014256.837
Z = 26.935

AP-24*
E = 473736.455
N = 9014124.258

FGL +11.50M
Z = 13.554

水 泵

E+ 473480.474
N+ 9014219.160
消防房


维修车 AP-25*
E = 473744.327
N = 9014094.882
变配电

沉淀池
Z = 18.500

沉淀池

天然站气(甲
压 类)

AP-23*
E = 473680.398
N = 9014109.238
Z = 11.255