4.POTABLE WATER - PROGRESS UP TO 16.05.25-Done

The document outlines the progress and layout of the potable water project in the C-422 area, detailing various phases and limits of work. It includes specific references to different sections of the project, such as excavation, pipe laying, and chamber installations. Additionally, it indicates the completion status of various tasks and the overall project timeline.

Uploaded by

prabas.unique
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views1 page

4.POTABLE WATER - PROGRESS UP TO 16.05.25-Done

The document outlines the progress and layout of the potable water project in the C-422 area, detailing various phases and limits of work. It includes specific references to different sections of the project, such as excavation, pipe laying, and chamber installations. Additionally, it indicates the completion status of various tasks and the overall project timeline.

Uploaded by

prabas.unique
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

MC29

LIMIT OF WORK
0+473

FH-001
0+100

FH VC-01

PACKAGE PHASE-1A1
POTABLE WATER PROGRESS LAYOUT AT C-422 AREA

LIMIT OF WORK PHASE


LIMIT OF WORK
FH VC-12 FH-012
0+400

1A1
ROAD MM03
FH-002
FH VC-02

LIMIT OF WORK

LIMIT OF
0+200

WORK PHASE
ARV-003

(AS OF 16-05-2025)
IV-001

1A2
0+529

FH VC-13 FH-013
ARV-002

0+535

FH-003
0+300
IV-009
FH VC-03

FH VC-15

SM
FH VC-16
FH VC-18
FH VC-17

P-
F

WO-002

01
IV-0

HV
C-0
02
ROAD MC31

4
0+300
MC31

ROAD MC29
FH-015
FH-016

FH-017

MC30
FH-004
MC31 0+000
0+630

0+000

0+399
0+300
FH VC-14 FH-014

0+200
0+100
FH-005
0+200

FH VC-05

ROAD MM03
FH -018
0+400

FH-019
ROAD MC30
0+100 FH VC-19

MM03
FH-006
FH VC-06

KHIB10-267
0+100 IV-010

FH-025
IV-004 EXISTING
IV-003 PIPE 600mADDC MAIN POT

WO-003
mØ D.I ABLE WAT
WO-001 ER

ARV-004
MC29

ARV-001
0+500

7
-0

FH VC-25
VC
FH

FH VC-09

FH
0+200
VC

IV-005

0+100
- 08

0+200
ROAD MC05

FH-023
FH-024

-0+000
0+300

LIMIT OF WORK
60
FH-011
FH-007
0+000

0+400

-0+000

MM01
MC0 0

MC30
FH

MC29
0+230 MC0 5

0+500

0+100
-0
08

59
FH-022
ROAD MC00
0+000

FH-009
MC00

MC02

FH VC-23
FH VC-24
FH VC-11
-1

-1

2
IV-006
ROAD MC00

-2
VC
0+600

FH
KH
IB1
0-P
FH VC-10

KS
S1
FH-010
IV-011

9
IV-007 IV-008
0+100

F1 AREA BOUNDARY FH VC-26 FH-026 IV-030


STOP
BUS FH VC-098 FH-098
‫تامفاح‬
‫فقوم‬

0+700
Legend:- WO-012

FH VC-27 FH-027
PROPOSED POTABLE WATER

P4
0+200

ROAD MM01
IV NETWORK FH VC-099
FH-099

0+800
PROPOSED POTABLE WATER
FH VC-28 FH-028
FHVC NETWORK FH VC-100 0+300
FH-100

MM03
EXCAVATION IN PROGRESS
0+900

ROAD MM03
FH VC-29 FH-029 EXCAVATION COMPLETED FH VC-101 FH-101

0+400

PIPE LAYING
FH VC-30
1+000

FH-030
PIPE SURROUND
FH VC-102 FH-102

TESTING 0+500

BACKFILLING IN PROGRESS
FH VC-31 1+100
FH-031 FH-103
FH VC-103

BACKFILLING COMPLETED
A1
0+600

CHAMBER EXCAVATION

A2
FH VC-32 FH-032 FH-104
1+200 FH VC-104

CHAMBER BLINDING
0+700

CHAMBER INSTALLATION LIMIT OF WORK PACKAGE


PHASE-1A1

MM03
FH VC-33 FH-033 FH-105

1+300 CHAMBER BACKFILLING FH VC-105

IN PROGRESS 0+800

FH VC-34 FH-034 CHAMBER BACKFILLING FH VC-106


FH-106

1+400 COMPLETED
WO-004 CHAMBER COVER IV-029
0+900

FH VC-35 FH-035 SLAB INSTALLATION FH VC-107 FH-107

A6
1+500

IV-012 FIRE HYDRANT INSTALLATION


1+000

FH VC-36 FH-036 FH VC-108 FH-108

ROAD MM01
D.I FITTING INSTALLATION

FH
VC

-1
1+600

-3
7
FH-037 STOP
BUS

LIMIT OF WORK
INTERNAL FINISHING
1+100

0+000
‫تامفاح‬

MC0 0 MC06
‫فقوم‬

FH VC-109 FH-109

3+600

3+607

LIMIT OF WORK
MM03
1+700
ARV-005
FH VC-38 FH-038
EXTERNAL FINISHING FH VC-110 FH-110
1+200
‫فقوم‬
‫تامفاح‬

BUS
STOP

ROAD MM03
STOP
BUS

‫تامفاح‬
‫فقوم‬

FH VC-58 FH-058
1+800

IV-013
FH VC-111 FH-111

1+300

0
0+60

FH-057 FH VC-57
RO

WO-005
AD

FH

F-3
MJ

VC 1+900
52m 25
05

-5 FH VC-112 FH-112
6 LIMIT OFWORKS
LIMIT OF PHASE1A
WORK

F-2
59
FH VC-52

PACKAGE-1A1
FH VC-51
FH VC-50

C- FH VC-60
FH VC-53

MM04
FH VC-62

FH VC-63

FH VC-64
FH VC-61

ARV-007
0
FH VC-49

FH VC-65
50
V

FH VC-66
0+ 1+700 1+400
FH VC-48

63m
IV-017

63
FH-056
FH
IV-016

ROAD MM02

FH VC-68
FH VC-47

IV
IV-015

FH VC-69
WO-008
IV-021 0+310
FH VC-46

FH VC-70
IV ROAD MM02

-0
LIMIT OF WORK

MM04
ARV-006

LIMIT OF WORK
FH VC-45
WO-0

FH-080

IV-019
-0 FH VC-080

FH VC-072
18

FH VC-71
LIMIT OF WORK
FH VC-44

14
0+300

ARV

FH
FH VC-43

FH VC-073
FH V

FH VC-41

ROAD MM02 -008 WO-009

FH VC-074
FH VC-40

FH VC-42

VC
07

FH VC-075
FH
2+000
FH-113
MC15

FH VC-113
0

J0

-0

ROAD MM01
40

5
C-3

FH
0+

VC
FH-062
FH-060

79
STOP

FH-064
BUS
‫تامفاح‬
‫فقوم‬

RO
FH-051

-0

-6
A
MM02
62
9

FH-066
MM02
FH-049

RD 5

7
FH
OA
M 3

FH-068
MC16
DM

FH VC-082
JJ005 0+000
FH-047

MM02
3+600

3+700
3+400

VC

3+800
3+300

FH VC-083
3+500

STOP

‫تامفاح‬

MM02
BUS

‫فقوم‬

3+900
1+800 1+500
3+200

0+000
5

IV-022
4+000
3+100

FH-070
FH-045

-0
0+30

4+100
3+000

FH VC-084
54

FH-059

FH-061
FH-052

4+200
FH-063
81
0

FH-065
FH-050

FH

4+300
-0

FH-072
2+800

IV
FH-043

2+900

FH VC-085
FH-067
MM02

4+400
FH
2+700

-0
0+200

FH-048

-0
FH-0

MC66

4+500
MM02

MC17
FH-041

79
2+600

0+400

FH-074
FH-069

20
FH-046

FH VC-086
4+600
MJ0 5

‫تامفاح‬
‫فقوم‬

FH-075
2+500

STOP
BUS
FH-071

4+700

ARV-009

FH VC-087
39

2+400

FH VC-114 FH-114
FH-044

ROAD MM02

4+800
2+100
ROAD MM02
2+300

FH-073
MC51
LIMIT

FH
4+900
ROAD MM02

63
FH-042

06
OF WORK

2+200

‫فقوم‬
‫تامفاح‬

FH VC-089
MM02
LIMIT OF WORK

5+000

IV

VC
0

FH-082
MM03

BUS

IV 088
STOP

FH VC-090
FH-076
O-

-0
4

-02
5+100
-5

-
25

FH VC-091
W

ROAD MM02

WO-010
1+900 1+600
VC
FH-040

STOP
BUS

3
‫تامفاح‬

5+200
‫فقوم‬
FH-081

FH-084

FH VC-092
ARV-010
FH

FH VC-093
5+300

MC17
FH-055 ARV-012
FH VC-55 76

FH-086
ROAD MM

FH-083

5+400

FH VC-094
MM02

02 -0 FH-077 ROAD MM
02 FH VC-115 FH-115

FH VC-095
VC

5+500
-1

FH-088
FH-085

FH VC-096
FH
2+200

FH VC-097
OF WORK 0+000

5+600
LIMITLIMIT OF WORK 0+377

77

5+700
A4

FH VC-121
-0

FH-090
FH-087
FH

WO-011
5+800
VC
MM02

PHASE-1A1
STOP
BUS

0+200
C-1
IV-0 16

5+900
FH
2+000
‫تامفاح‬
‫فقوم‬ 1+700

FH-092
ROAD MM02

IV-026
FH-089
MM04
A5

28

6+000
FH VC-078

MM04
FH-078

6+100

FH-094
FH-091
ROAD MM FH-116

6+200
02 MM02

F2 AREA

FH-096
6+300
FH-093

6+400
BOUNDARY LIMIT OF

‫تامفاح‬
‫فقوم‬
FH-121

STOP
BUS
FH-095

6+500
PACKAG WORK
LIMIT OF WORK

22
MM02 MM02

-1
E PHASE-

6+600

VC
1A1

6+700
FH-097
1+800

6+800

6+900

7+000
FH-122

FH

FH-123
23
-1
VC
KHIB10-412

(A=45,936 SQ.M.)
FH
ROAD M
M02
KHIB10-41
FH VC-124
FH-124
2
(A=45,936 SQ.M.)

IV-025 1+900

FH VC-125 FH-125

ROAD MM01
STOP

2+000
BUS

‫تامفاح‬
‫فقوم‬

FH VC-126 FH-126

2+100

FH VC-127 FH-127

2+200

FH VC-128 FH-128

FH VC-129
2+300
FH-129
DO NOT SCALE FROM THIS DRAWING

FH VC-130 FH-130
2+400

MCA2 MCA2
MCA2

0+000

0+055
ARV-011

FH VC-131 FH-131
F2 AREA

MCA1
BOUNDARY

FH-132

MM01
FH VC-132

2+600

MCA1
FH VC-133 FH-133

‫فقوم‬
‫تامفاح‬

FH
BUS
STOP

2+700

KH

VC O-
IB
10
-P
SMP-10

WIV-027
SS

-1 01
5

34 3
MCA3
FH-134

MCA3

MCA3

0+000

0+152
0+100
2+800

7
-13
FH-138
38

FH
-1
VC
FH IV-027A

FH VC-135 FH-135
2+900

FH VC-139 FH-139

0+000

MM01
MCA4

ROAD MM01
3+000

MCA4
0+100

FH VC-140 FH-140

0+159
MCA4

FH VC-141 FH-141
3+100
LIMIT OF WORK PACKAGE PHASE-1A1

LIMIT OF WORK
PACKAGE PHASE-1A1

May 19, 2025 - 11:00am Ansar.Aliyar File Location: D:\KIZAD-C 422\SHOP DRAWING\POTABLE WATER\MARK UP\MARKUP LATERAL LINE 29-03-2025 to 26-04-2025 & WEEKILY PROGRESS.dwg

You might also like