0% found this document useful (0 votes)
136 views9 pages

Column Concrete Excel Calculator

The document provides calculations for estimating concrete quantities for round, rectangular, and square columns, detailing dimensions, proportions of materials, and required volumes. It includes specific results for the quantity of cement, sand, and gravel needed for each column type. Additionally, it offers notes on input adjustments and a resource for further civil engineering concepts.

Uploaded by

Liyakat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
136 views9 pages

Column Concrete Excel Calculator

The document provides calculations for estimating concrete quantities for round, rectangular, and square columns, detailing dimensions, proportions of materials, and required volumes. It includes specific results for the quantity of cement, sand, and gravel needed for each column type. Additionally, it offers notes on input adjustments and a resource for further civil engineering concepts.

Uploaded by

Liyakat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 9

Estimation of Concrete for columns

Round/circular concrete column


Radius of the column Height of the column
0.25 Meter 3 Meter
Proportion of Cement Sand (FA) Gravel (CA)
concrete 1 1.5 3
Number of Dry to wet volume
1 1.54
columns ratio

Weight of one Unit weight of


50 1440
cement bag (kg) cement (kg/m3)

Calculations
Wet volume of concrete 0.5899
Dry volume of concrete 0.9084
Volume of cement required 0.1652

Results
Quantity of cement required in Kg 237.8
Number of cement bags 4.8
m3 0.2477
Volume of FA (sand) required in
Cu.ft 8.75
m3 0.4955
Volume of CA (Gravel) required in
Cu.ft 17.50
Note:
1) Enter your inputs in the cell mentioned in this colour
2) The inputs in the cells are almost standard values, if you wish to change, you can change them
3) Visit the website below for more indepth concepts of civil engineering
www.civilunlimited.com
can change them
Rectangular concrete column
Length of the column 0.3 Meter
Width of the column 0.22 Meter
Height of the column 3 Meter
Proportion of Cement Sand (FA) Gravel (CA)
concrete 1 1.5 3
Number of Dry to wet volume
1 1.54
columns ratio

Weight of one Unit weight of


50 1440
cement bag (kg) cement (kg/m3)

Calculations
Wet volume of concrete 0.1980
Dry volume of concrete 0.3049
Volume of cement required 0.0554

Results
Quantity of cement required in Kg 79.8
Number of cement bags 1.6
m3 0.0832
Volume of FA (sand) required in
Cu.ft 2.94
m3 0.1663
Volume of CA (Gravel) required in
Cu.ft 5.87
Note:
1) Enter your inputs in the cell mentioned in this colour
2) The inputs in the cells are almost standard values, if you wish to change, you can change them
3) Visit the website below for more indepth concepts of civil engineering
www.civilunlimited.com
can change them
Square concrete column
Side of the column Height of the column
0.3 Meter 3 Meter
Proportion of Cement Sand (FA) Gravel (CA)
concrete 1 1.5 3
Number of Dry to wet volume
1 1.54
columns ratio

Weight of one Unit weight of


50 1440
cement bag (kg) cement (kg/m3)

Calculations
Wet volume of concrete 0.2700
Dry volume of concrete 0.4158
Volume of cement required 0.0756

Results
Quantity of cement required in Kg 108.9
Number of cement bags 2.2
m3 0.1134
Volume of FA (sand) required in
Cu.ft 4.00
m3 0.2268
Volume of CA (Gravel) required in
Cu.ft 8.01
Note:
1) Enter your inputs in the cell mentioned in this colour
2) The inputs in the cells are almost standard values, if you wish to change, you can change them
3) Visit the website below for more indepth concepts of civil engineering
www.civilunlimited.com
can change them

You might also like