I. What are the various methods available for procurementof intellectual services?
Descri the sul ability of each method. (25)
(b A consultant is to be selected using QCBS method for design of Aimort
nfrastructures. qualifying marks is 75% for technical proposal. The weightage for
technical and financial proposals are 90% and 10% respectively.
Technical Scores:
Fitm B c
Firm
For the procurcmcnt of twenty storied building construction work with an estimated
cost of 80 crore taka, the project duration is four years. Il is planned to have a minimum
billing amount is 10%. Prepare the Tender Data Sheet (TDS) for this project for the
following items: (25)
(i) Tend Security (ii) Specific ExpeHences in tenns of project size and work valuc (iii)
An al Construction Turnover (iv) Liquid Asset.
What contract provision will apply, if the Contractor delays thc work without a
reasonable ground? Explain how this provision is applied? (10)
3. (a) Write the specification of brick work considering all aspects of material quality,
(b) Prepare a BOQ, in a standard format, for brick work of 250 mm thick and 50 of
81
CE 301
(17)
4. (a) Show diagrammatically the preparation for a career in Civil engineering by ASCE.
(18)
(b) Discuss briefly the five basic characteristics of a profession.
SECTION - B
There are FOUR questions in this section.
Answer either 5(a) or 5(b). Question 6, 7 and 8 are Compulsory.
8. (a) Define contracts. Briefly describe the tenns used to categorize contracts. For a
contract to bc binding what are six elements that must be present. (17)
(b) Briefly describe the various types of project delivery systems. (18)
82
L-3/T-1/CE Date: 29/09/2018
BANGLADESH INIVERSITY OF ENGINEERING AND TECHNOLOGY, DHAKA
L-3/T-l B, Sc. Engineering Examinations 2017-2018
SECTION
-A
There are FOUR questions in this section. Answer any THREE.
(a) Distinguish between Act and Regulation and in this connection explain the
2. (a) Describe the tender process using a flow-chart. Write the steps of tender evaluation. (25)
(b) List, in order of priority, the documents that form the Contract. (10)
(iv) Payment;
Contd .
83
CE 301
SECTION - B
Answer any THREE.
There are FOUR questions in this section.
(5)
5. (a) Define 'Civil Engineers' as per ASCE Body of knowledge.
(10)
(b) Briefly describe Ancient Structural System.
relationship. (10)
(c) Define Project. Briefly describe Scope-Schedule-Budget triangular
(10)
(d) Draw the flow of work in project development.
6. (a) Why 'construction document' phase has higher emphasis during design phase? (7)
proposals. (18)
84
L-3/T-1/CE
Date : 02/08/2017
BANGLADESH INVERSITY OF
n,'GINEERING AND TECHNOLOGY,
L-3fT-l B. Sc. Engineering Examinations 2016-2017
Sub : CE 301 (Professional Practice and
Communication)
Full Marks : 210
Time : 3 Hours
The figures in the margin indicate full marks.
USE SEPARATE SCRIPTS FOR
EACH SECTION
SECTION - A
There are FOUR questions in this
Section. Answer any THREE.
l. (a) In connection with the
preparation of a tender document for constructionof a twenty
storied building with an estimated cost of
Tk- fifty crore and project duration four years,
prepare the tender data sheet (TDS) for the
following items: (20)
(i) Genera Experience (ii) Specific Experience
(iii) Tender Security (iv) Turnover (v)
Liquid AsseL
0) For the work mentioned above, prepare a standard Notification
of Award OJOA) to
the v.dnningtenderer.
(15)
2. (a) Establish the relationship between GCC and FCC clauses with respect to following
items:
(25)
(i) Completion Time (ii) Liquidated Damage (iii) CompensationEvents (iv) Retention
(v) Arbitration
3.. (a) What is the purpose of having a procurement plan. In a standard format, prepare a
85
UVb
CE 301
SECTION-B
TETREE questions.
There are FOUR questions in this Section. Answer any
(17)
5. (a) Describe the steps for preparing an effective oral presentation.
(b) What are the different types of communication activities of an orgæüzatioa? Desctibe
(18)
them briefly.
86
L-YT-IICE Date 18/01/2017
BANGLADESH UNIVERSITY OF ENGINEERING AND TECHNOLOGY, DHAKA
L-311-1 B. Sc. Engineering Examinations 2015-2016
SECTION - A
There are FOUR questions in this section. Answer any THREE.
1. (a) Describe the steps that are followed in tender evaluation. (20)
(b) With the help of a flow-chart, describe the tendering process for procurement. (15)
2. (a) Describe the essential elements of a tender document vsith brief description of each
element. (20)
(b) Describe the basic conditions to be fulfilled for accepting a JV contractor. (5)
(c) Describe the GCC and PCC clauses pertaining to timely completion of contract. (10)
-B
SECTION
There are FOUR questions in this section. Answer any TIIREE.
Contd
87
CE 301
7. (a) Define project. Briefly describe three measures of project activity. Draw the flow of
work in project development. (18)
(b) What are the Think twice' contract clauses? Mention names of the professional/
people!organization of four different groups of project d'helopment? (17)
8. (a) Name diffcrent types of project deli'.cry system, procurement method and contract
format. What ere the specific concerns of professional liability insurance? (18)
88
DHAKA
2014-2015
Ct)lMN1iiication)
Suh : CE 301 (i'wfœ$ional ['raci:cc and
l'inu : 3 Flours
SF.CNON - A
J With referencc to PPA-2006 clauses 31 and 32, state Il',etendering methods that can
V2 19/ State the methods that can be uscd for procurenu•ntof intellectual scraccs. Wilh
appropriate example explain suitability applying Illese methods. (25)
ufUndcr QCBS, the tcchnical scorcs obtaincd hy threc participants A, B and C are 75,
85 and 90 respectlvcly. lina1W1alproposal by of 111cpa:licipants arc
ranktng of 111capplicants. The qualifying matk t'ùr technie.tlscoveis 75% and wcightage
and prepare the corresponding GCC and PCC clausc.s ror any live ofthe following issucs: (25)
(I) Definition (i) 'Etnployer' (ii) 'Contraetor' and (iii) The Engincer'.
(Il) Advance Paytnent
(III) Perronnance Security
91
ace R questions in Illis section. Answer any THREE.
(iii) Denotations
(iv) Connotations
("Define project. Briefly describe the Scope- Schedule- Dudgcl triangular rclationship.
0. 7 Define Liability Insurance, Liability Insurancc und Bond. Who arc thc
principal players in the professional liability insurance industry and what arc thcir roles?
O. Briefly answer and explain the following questions bascd on the code of cthics for
cngincers.
(j) According to scction 2, what issues should the Engineer have proper regard to and
conflict of interest?
'(v) According to section 12, what should an Engincer NOT ilttetnpt to do rcgarding
92
LVb
: 04/08/2015
OF ENGi.SÆERj.NGAND T ECHNOLOGY,DHAKA
L-i B. Sc. EngineefingExaminations
CE (Professicnal Practice and C.om.nunication)
Marks .10 Time : 3 Hours
The figures in the margin indicate full mtrks.
VSE SEPARATE SCRIPTS FOR EACH SECTION
-
SECTION
There are FOUR questions in this section. Answer any TIIREE.
2. 11)order of priority, list the doculnents that fonn pact of th2 contract. (5)
3. (a) For the purposeof constructionof a highway bridge ove: a river, tenderdocumentis
to be prepared. The overall length of the bridge is 1500 m and the estimated cost is
1000 crore taka. Prepare the tcnder data sheet for the following items: (20)
6 Tender's experience (general and specific work)
K) Tender security
Jif) Required constructionturnover
v) Liquid asset or working capital required
(v) Pre-Tendcr meeting
Note that the project duration is 3 years.
Contd . P/2
93
SECTION-B
There FOUR quayiens in this section. Answer any TIIREE.
Who are the three key players in project development and delivcry process? Who are
the founh gr6up that co-exist with the three key players. (7)
6. What procedures;steps should be followed while dealing with contract lisk. (10)
Write down the names of specific concerns for professional liability insurance. (5)
Define Civil Engineers. Describe five basic attributes ofCivil Engineering profession. (10)
(d) Blietly describe Scope-Schedule-Budget triangular relationship with respect to project. (10)
a) Describe the planning steps before a meeting and proceduresduring the meeting and
94
bVb
: 24/051201/
• DHAKA
• CE 2nd Conanunicztion)
301 (Professional ?ractice.•
Ti;nz 3 Hours
SECTION-A
TILREE.
There are FOUR questions in this section. Answer any
international competitive
(a) Discuss the diflérent types of tender under national and
(25)
bidding. Describe {heapplicability of each or these methods.
(10)
bidding.
(b) Descnhe special provisions to be made for international competitive
estimated cost of
(a) Roads and Highways Dep:mment is to build a blidge with an
of 60 m each.
Tk. 200 crore. The bridge has a total length of 240 m with four equal span
least five
For tendering of the work, prepare Tender Data Sheet (TDS) items. Include at
(25)
TDS items.
(b) List the tender accompanyments that a tenderer has to submit along the tender
3. (a) Describe at least five provisions of General Conditions of Contracl (GCC) with
relevant provisions of Particular Conditions of Contract (PCC) for any assumed project. (25)
(b) Prepare a sample BOQ fir a major Civil Work item of construction with detail
description. (10)
(ii) Conciseness
(iii) Ccinsideration
SECTION-B
They: FOUR questions in this section. Answer any
THREE.
Contd
35
Contd O. Sn. S
(5x4=20)
(c) Wfitc r,otes on:
(ii) Deductible
(b) What is Pre.Design? What data should be includcd dilling Ptc-Dcsign phasc? W'hat
(d) l)esctibe Ihe role or Acluaries and UllderwrilelSin prú•ssional liabilil)' insuranee
V%'hat
is band? l)eline Bid Bond and Id. IO)
(b) Cive conll)lcle chronological description the vari01tssteps ll)llowcd during the
entire prc,cess lilajor solicited proposal. (15)
8. (a) Deline Civil Engineers. Describe five basic attfibutes01'Civil engincering profcssion. (2+8= IO)
(b) Write down (he orco:lllnon projcct dclivery system and contracl ferina:. (5+5=10)
(i) Abstracting
(ii) Infcrring
36