Project

Chapter 22 covers the competencies required for managing civil engineering projects, including time, quality, safety, cost, labor, contracts, and materials. It outlines performance standards and learning outcomes for project management, emphasizing the importance of preparation, monitoring, evaluation, and control of project timelines and quality. The chapter also provides learning activities, definitions of key terms, and essential elements for effective project management.

Uploaded by

joycekanyiri97
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views37 pages

Project

Chapter 22 covers the competencies required for managing civil engineering projects, including time, quality, safety, cost, labor, contracts, and materials. It outlines performance standards and learning outcomes for project management, emphasizing the importance of preparation, monitoring, evaluation, and control of project timelines and quality. The chapter also provides learning activities, definitions of key terms, and essential elements for effective project management.

Uploaded by

joycekanyiri97
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 37

CHAPTER 22: CIVIL ENGINEERING PROJECT MANAGEMENT

22.1 Introduction of the Unit of Learning


This unit describes the competencies required to manage civil engineering projects. It involves
managing project time, managing construction project quality, managing project site safety, health
and security, managing construction project cost, managing project labour, managing project
contracts and managing construction materials, plant, tools and equipment.

22.2 Performance Standard


Manage project time, construction project quality, project site, safety, health and security,
construction project cost, project labour, project contracts, and construction materials, plant and
tools and equipment based on project specifications.

22.3 Learning Outcomes


22.3.1 List of Learning Outcomes
a) Manage project time
b) Manage construction project quality om
c) Manage project site, safety, health and security
t.c

d) Manage construction project cost


e

e) Manage project labour


tv
sy

f) Manage project contracts


ea

g) Manage construction materials, plant, tools and equipment

836
22.3.2 Learning No 1: Manage Project Time
22.3.2.1 Learning Activities
Learning Outcome No 1: Manage Project Time
Learning Activities Special Instructions

1.1 Prepare work schedules and time programs • Group discussions


1.2 Monitor and evaluate project timelines • Demonstration by
1.3 Control project time schedules trainer
1.4 Prepare and disseminate project timeline reports • Online videos
• Power point
presentation
• Exercises by trainee

22.3.2.2 Information Sheet No22/LO1: Manage Project Time

om
t.c

Introduction to learning outcome


e

This learning outcome deals with project time management and this can be achieved through the
tv
sy

knowledge of various aspects such as; preparation of work schedules and time programs,
ea

monitoring, evaluation and control of project timelines and schedules. All this is based on the
project specifications.

Definition of key terms


Work schedule: Ronald (2015) defines schedules in project management as a process of
identifying deliverables, milestones, and activities in chronological order with a start and end date
and time. Therefore, work schedules can be defined as an organization of activities, deliverables,
and project milestones to ensure that inputs are transformed into outputs in a project at a stipulated
time.
Project timeline: The project timeline can be defined as the process of showing the chronological
order of events in a project.

Content/Procedures/Methods/Illustrations
1.1 Prepare work schedules and time programs based on the project specifications
The process of preparing work schedules and time programs can be complex since different
projects have varied approaches and challenges. However, there are six steps simplified steps that
can be applied in all projects regardless of the project nature.

837
a. Identify and Write down the project tasks
The most crucial step in project management allows the project manager to understand the project
nature. Moreover, it determines how activities will be well-coordinated within the project
stipulated time.
b. Define the various relationships between the tasks.
Once the project tasks have been written down, it is crucial to identify the existing relationship
between the various events.
c. Develop various Milestones
Project milestones indicate the event that allows the end of a particular project activity and allows
the beginning of another activity. The steps involve allocating the relevant tasks that will facilitate
the achievement of the set milestones.
d. Allocate time for the identified milestone
After the milestone development, the next step now becomes identifying the available time and
allocating accordingly. The time allocation should be balanced and clearly stated. Moreover, it
should have an allowance to avoid inconveniences.
e. Allocate resources
After the project's milestones have been identified, it is crucial to understand the various roles and
resources allocation basis. The project success depends on this step since the progress and results
will be dependent on the product mix on this stage.

f. Review and Revise the schedule regular


The first attempt might not provide the most feasible option; therefore, it is necessary to adjust the
program. However, the revision should be aligned with the project's goals, objectives,
and allocated time and resources.

1.2 Monitor and evaluate project timelines based on the project specifications
Project monitoring and evaluation (M&E) is the process of gathering and interpreting data to
check if the project is moving towards the stipulated direction. Monitoring is carried to measure
progress and performance for decision-making purposes at the different stages of the
projects. On the contrary, evaluation is carried out for general data assessment purposes of
understanding the extent at which the specified goal is achieved. It is crucial to understand the
direction and the impact that a particular project, therefore the need to carry out
monitoring and evaluation activities. Furthermore most projects are time bound, and
evaluation and monitoring help in maintaining the specified timing.

1.3 Control project time schedules based on the project specifications


For easier control project time schedules, data collection plays a crucial role. The data collection
varies with the project nature; thus, the project managers need to identify the sustainable data
collection method. From the data collected, the resource and responsibility allocation is
identified with the time being a factor of consideration. The information helps in operational
and strategic management, and controlling the project becomes an easy and straight leader.
838
1.4 Prepare and disseminate project timeline reports based on the project specifications.
After the data is collected, the need for compiling and analysis arises. Therefore, the project
manager collabourates with the research team members and selects the various tools required to
analyse the data collected logically and acceptably. After analysis, the data organized and prepared
in an official document that will be used for reporting purposes. The data collected should be
organized in such a way that it allows objective and strategic adjustments.

Conclusion
This learning outcome covered project time management

Further Reading

Read more on project timelines and project time control

22.3.2.3 Self-Assessment
om
et.c
tv
sy

Written Assessment
ea

1. Work schedule can be defined as


a) the various expectations that show the project's success
b) process of identifying deliverables, milestones, and activities in chronological order
with a start and end date and time
c) A document that shows a chronological order of events in a project.
d) Organization of activities, deliverables, and project milestones to ensure inputs are
transformed into outputs in a project at a stipulated time.
2. Which one of the following does not explain the purpose of carrying out monitoring and
evaluation in a project?
a) Capacity building
b) Clarification
c) Accountability
d) Strategic management

839
3. Which one of the following explains the meaning of monitoring a project?
a) The document prepared during the process can be used for explanation purposes to the
project donors and stakeholders about the utilization of the various resources in the
program.
b) Information acquired at the different project levels can be used to change the project
approach due to the objective and strategies adjustment.
c) Process of measuring progress and performance for decision-making purposes at the
different stages of the projects
d) Provides information that is required for the coordination and management of the
various resources for project improvement purposes.

Short answer question


Identify the tools required to analyse and report the collected data?

Essay question
Describe the process of monitoring and evaluate project timelines based on the project
specifications
om
Case Study Assessment
et.c

The county board of directors has selected you in the short-list on their project manager in a county
tv

development project. Prepare a document that you will present on the interview day to demonstrate
sy

your ability to organize, manage, and report the project at the various project stages.
ea

Project Assessment
Write a report on the management of the post-modern library being constructed in your school

22.3.2.4 Tools, Equipment, Supplies and Materials


• Scientific Calculators
• Relevant reference materials
• Stationeries
• Design Software
• Computer lab
• Relevant practical materials
• Labouratories (chemical, biological & soils)
• Internet
• Manuals and guidelines
• Project management software
• Measuring and drawing tool
• Printer/plotting device
• Codes of practice

840
22.3.2.5 References

Eng. Ssempebwa Kibuuka Ronald. (2015). Project Schedule Management. Hawaii. Research Gate.
Hu, X., Cui, N., Demeulemeester, E., & Bie, L. (2016). Incorporation of activity sensitivity
measures into buffer management to manage project schedule risk. European Journal of
Operational Research, 249(2), 717-727.
Susser, B. S. (2012). How to Effectively Manage IT Project Risks. Journal of Management &
Business Research, 2(2).

om
et.c
tv
sy
ea

841
22.3.3 Learning No 2: Manage Construction Project Quality
22.3.3.1 Learning Activities
Learning Outcome No 2: Manage Construction Project Quality
Learning Activities Special Instructions

2.1 Develop construction project quality plans • Group discussions


2.2 Develop construction project methodology • Demonstration by
2.3 Acquire construction project resources trainer
2.4 Undertake construction project quality control • Online videos
2.5 Prepare construction project quality reports • Power point
presentation
• Exercises by trainee

22.3.3.2 Information Sheet No22/LO2: Manage Construction Project Quality

om
t.c

Introduction to learning outcome


e

This learning outcome deals with development of construction project quality plans, methodology,
tv
sy

and undertaking of project quality control together with preparation of project quality reports.
ea

Definition of key terms


Contract: This is an agreement creating and defining obligations between parties. It is an
agreement enforceable at law made between two or more persons by which rights are acquired by
one or more to act on the part of the other or others.

Contract specifications: These are the rules of the contract. They are the agreed upon set of
requirements that provide the necessary details about specific requirements.

Content/Procedures/Methods/Illustrations
2.1 Develop construction project quality plans according to the contract specifications
Construction project quality plan is a written plan detailing how one will manage quality on a
construction project. Project quality plans vary depending on the type of construction project one
undertakes; however, they are limited in scope. Quality plans are written to make the clients know
how you going to control the quality of your projects, so it is necessary that when developing a
quality plan, one should make clear how and when you would control quality in your project. A
construction quality plan should be prepared in such a way that your headings match up with your
client’s specifications.

842
Essential elements of a construction project quality plan include
i. Project personnel in charge of the project quality. Has the overall responsibility
ii. Quality communications to ensure quality work is done.
iii. Quality assurance surveillance-Monitoring overall project quality.
iv. Project quality specifications-Where one makes sure compliance with the projects contract
specifications.
v. Inspections and tests-To inspect phases of works to ensure they are up to the required
quality.
vi. Control of nonconformance-The quality control plan should outline how to handle
situations that go wrong.

2.2 Develop construction project methodology according to the contract specifications


Construction Project methodologies are processes that assist project managers with guidance and
the steps to take to bring a project to completion.
Depending on contract specifications, there are a number of methodologies that are crucial to
getting the job right. The choice of methodology will depend entirely on the project with their set
of rules, principles, processes and practices.
• Agile
om
This is one of the most recognizable methodologies where demands and solutions evolve
et.c

through the cross functional teams and their customers.


tv
sy

• Lean
ea

This type of construction methodology promotes maximizing customer value while


minimizing waste.

• Waterfall
In this methodology, processes flow downwards in one direction like a waterfall. One is able
to move onto the next phase of development once the current phase has been completed as
illustrated by Winston W George in an article written in 1970.

• PMI/PMBOK
PMI stands for project Management Institute which is a non-profit membership
association, project management certification and standard organization.
PMI produces the PMBOK which is a guide detailing the set standards that characterize
project management.

843
2.3 Acquire construction project resources according to the contract specifications
Construction resources in a construction project might include:
i. Products and material
ii. Human resources
iii. Space and facilities
iv. Finances
v. Construction plant, tools and equipment.
vi. Subcontractors.

Construction Project resources vary depending on cost, duration, quality and safety as the
construction project industries are diverse and contains subcontractors, contractors, consultants,
architects, owners and others. Acquiring resources needs an understanding of what resources are
needed, what resources are available, where the resources are located and the ability to reschedule
those resources accordingly.

2.4 Undertake construction project quality control according to the contract specifications
Construction quality control is or are measures to ensure that a project conforms to the quality as
indicated in the specifications.
om
To ensure quality, a number of steps are employed in a construction project.
et.c

i. Organizing for Quality-Have a group that will have an overall responsibility of ensuring
tv

that the project quality is adhered to.


sy

ii. Inspectors and quality assurance personnel will be involved in day to day quality check of
ea

the project.
iii. Work and material specification. -This documentation includes special provisions of the
design project facility as well as references to generally accepted specifications to be used
in construction.
iv. Quality control by statistical methods-This involves testing all the material on a particular
project. Such as non-destructive techniques or an onsite inspector can witness the
appropriateness and adequacy of construction methods.

2.5 Prepare construction project quality reports according to the contract specifications
Construction quality report is an account generated that is given to the customer of the
materials used in the project together with a description of its technical characteristics.
The reports details how the quality plans were followed to ensure quality is attained.

Conclusion
This learning outcome covered management of construction project quality

844
Further Reading

Read more on construction project methodologies on


Kolarić, S., Pavlović, D., & Vukomanović, M. (2015). Developing a methodology for preparation
and execution phase of construction project. Organization, technology & management in
construction: an international journal, 7(1), 1197-1208.

22.3.3.3 Self-Assessment

Written Assessment
1. Quality control is...
a) The graphic display of data that illustrates results of a process
b) Measures to ensure that a project conforms to the quality as indicated in the
om
specifications.
t.c

c) Processes that assist project managers with guidance and the steps to take to bring a
e

project to completion.
tv
sy

2. Which of the following is not an essential element of a construction project quality plan?
ea

a) Quality communications
b) Control of nonconform aces
c) Project submissal
3. Quality control plan must address
a) Quality control of the project
b) Quality assurance of the Project
c) All of the above
4. Which statement is true?
a) The choice of methodology will depend entirely on the project with their set of rules,
principles, processes and practices.
b) Construction Project methodologies are processes that assist project managers with
guidance and the steps to take to bring a project to completion
c) All of the above
5. Summarize the different methodologies in a construction project.
6. With reference to quality control, outline three quality standards in a construction project.
7. Summarize quality control plans.

845
Essay question
With reference to construction project plan outline and explain in details what one would consider
then planning for a construction project.

Oral Assessment
1. Outline the factors to include in a construction resource
2. Evaluate the elements of a construction project

Case study assessment


A road is to be constructed in your area and your firm has been contracted to do it. As the project
manager present your project plan for approval by the relevant authorities.

4.3.2.4 Tools, Equipment, Supplies and Materials


• Scientific Calculators
• Relevant reference materials
• Stationeries
• GPS
om
• Design Software
t.c

• Computer lab
e

• Relevant practical materials


tv
sy

• Labouratories (chemical, biological & soils)


ea

• Internet
• Manuals and guidelines
• Project management software
• Measuring and drawing tool
• Printer/plotting device
• Codes of practice

22.3.3.5 References

Flood, I., Issa, R. R., & Liu, W. (2006, June). A new modeling paradigm for computer-based
construction project planning. In Proceedings of the Joint International Conference on
Computing and Decision-Making in Civil and Building Engineering (pp. 1-11).
Haswell, C. K., & De Silva, D. S. (2013). Civil engineering contracts: practice and procedure.
Butterworth-Heinemann.
Murray, M., & Langford, D. (Eds.). (2008). Construction Reports 1944-98. John Wiley & Sons.
.

846
22.3.4 Learning No 3: Manage Project Site, Safety, Health and Security
22.3.4.1 Learning Activities
Learning Outcome No 3: Manage Project Site, Safety, Health and Security
Learning Activities Special Instructions

3.1 Develop project health, safety and security • Group discussions


guidelines • Demonstration by trainer
3.2 Conduct site health, safety and security • Online videos
inspections • Power point presentation
3.3 Coordinate and monitor project site security • Exercises by trainee

22.3.4.2 Information Sheet No22/LO3: Manage Project Site, Safety, Health and Security

Introduction to learning outcome


om
This learning outcome deals with development, coordination and monitoring of project health,
t.c

safety and security guidelines. The health and safety of people places of work deals with
e

development, coordination and monitoring of project health, safety and security guidelines. These
tv
sy

provisions are enhanced by legal regulations which introduce measures to improve the health and
ea

safety of workers through minimizing the risks they go through at their places of work.

Definition of key terms


Occupational safety and health: is an essential sector that deals and ensures the safety, health
and welfare of the workers.

Content/Procedures/Methods/Illustrations
3.1 Develop project health, safety and security guidelines in line with the OSH Act
Health and Safety Project is planned to assist in the monitoring of operations and promote a risk-
based approach to the prevention of dangerous actions that may lead to accidents or illnesses or
severe workplace incidents. The following are guidelines in line with the OSH Act (2007):
i. There should be registration of work places applied before any persons occupy or uses
any premises as a work place
ii. There should be training and supervision of inexperienced works
iii. There should be supervision, employment of persons below eighteen years, apprentices
and indentured learners
iv. Protective clothing and appliances
v. There should be cleanliness in the workplace
vi. Proper ventilation should be provided

847
vii. Proper lighting should be provided
There should be evacuation procedures

3.2 Conduct site health, safety and security inspections in line with the OSH Act
i. Initial environmental audit- OSHA identifies and understands all legal and other
requirements for workers within the site or work places according to environmental
aspects
ii. Environmental policy – whether the employees and employers are observing their
responsibilities on observing safety and health measures
iii. Planning – OSHA formulates their policies to be put in day to day practice
iv. Implementation – by allocating functions and responsibilities, motivating employees
and training them to be accountable in the delivery of their duties diligently.
v. Training – OSHA clarifies the impact, beware of the task and responsibility within
work places and consequences of the non-compliance workers
vi. Communication – OSHA do their best to communicate using various ways such as
visits, open door events, the legislation, conferences to ensure safety and security of
workers and employees
om
vii. Auditing – by assessing performance (monitoring operations and track frame) identify
problems and correct them, keeping records performances and documented files
t.c
e
tv

3.3 Coordinate and monitor project site security in line with the OSH Act
sy

There should be proper coordination and monitoring among the employer and the workers in
ea

the project site. The employer and the workers should be aware of:
i. Types of hazards that may occur from work being performed on-site by employees
hired by contractors, subcontractors or staffing agencies.
ii. Procedures or measures necessary to prevent or control exposure to such hazards.
iii. How to contact the manufacturer, subcontractor or personnel department if they
have a health issue.
iv. Past work undertaken and the types of risks that might still be present at the job
site.

Conclusion
This learning outcome has prepared the student to be able to apply the general and particular
legislation and regulations of Health and Safety at work, understand management of project site,
safety, health and security

848
Further Reading

Read further on safety, health and security as illustrated on the Occupational Safety and Health
Act, 2007.

22.3.4.3 Self-Assessment

Written Assessment
1. Which of the following is not a provision of health and safety?
a) Permit to work
b) Fire prevention
c) Project site
2. Can you interpret the following as used in OSHA? om
a) Act
t.c

b) Prevention
e

3. Summarize the application of OSHA guidelines


tv
sy

4. Are you able to interpret OSHA guidelines?


ea

5. Summarize the health and safety general provisions.


6. State health and safety general provisions
7. Summarize importance of project management

Essay question
1. Discuss the basic aspects of targeted by OSHA.

Oral Assessment
1. Evaluate the importance of OSHA in a project
2. Summarize on skills necessary for project management on site.

849
Project Assessment
An elevated road is being constructed at Maji ya Chumvi along Nairobi-Mombasa Highway to fly
over the railway line. Prepare the project report.

22.3.4.4 Tools, Equipment, Supplies and Materials


• Scientific Calculators
• Relevant reference materials
• Stationeries
• GPS
• Design Software
• Computer lab
• Relevant practical materials
• Labouratories (chemical, biological & soils)
• Internet
• Manuals and guidelines
• Project management software
• Measuring and drawing tool om
• Printer/plotting device
t.c

• Codes of practice
e
tv
sy

22.3.4.5 References
ea

Kenya government, (2007). Occupational Safety and Health Act.


Jones, A. M. (2014) Fire Protection Systems, Jones & Bartlett Learning, ISBN-10: 1284035379,
ISBN-13: 978-1284035377
www.osha.gov, (2016), Occupational Safety and Health Administration

850
22.3.5 Learning No 4: Manage Construction Project Cost
22.3.5.1 Learning Activities
Learning Outcome No 4: Manage Construction Project Cost
Learning Activities Special Instructions

4.1 Prepare project budget • Group discussions


4.2 Procure, allocate and monitor site resource utilization • Demonstration by
4.3 Control project cost variation trainer
4.4 Prepare project financial report • Online videos
• Power point
presentation
• Exercises by trainee

22.3.5.2 Information Sheet No22/LO4: Manage Construction Project Cost

om
t.c

Introduction to learning outcome


e

This learning outcome deals with project budget preparation, procurement, allocation and
tv
sy

monitoring of site resource utilization and the control of project cost variation.
ea

Definition of key terms


Project scope: Project scope is the part of project planning that deals with determining project
goals, the project methods such as labour and materials, project timeline, functions and project
fixed costs. These are parts which are needed to deliver and achieve a project to its completion.

Cost variation: Cost variation is the difference between the earned value of a project and its actual
cost (McMullen, 2010)

Content/Procedures/Methods/Illustrations
4.1Prepare project budget according to the scope of the project
The project budget is the total cost that has been projected to complete the project within a
specified period of time for instance payments, operating costs, starting capital among others.

851
Table 60: Project budget according to the scope of the project
Sample Project
Budget
Activity Direct cost Budget Overhead Total cost
Survey 1,500 500 2,000
Planning 6,000 500 6,500
Foundation 4,000 1,000 5,000
Materials 8,000 1,500 9,500
Building 10,000 2,000 12,000
Plumbing and 4,000 500 4,500
electrical
Cumulative 39,500

4.2 Procure, allocate and monitor site resource utilization according to the project scope
Procurement of construction materials and resources is vital to ensuring the success of the project.
It involves the following important steps:
i. Particularization. This is the first step as it involves the coordination of the project manager
om
and the purchasing department in order to buy the required materials and items required to
t.c

complete the project.


e

ii. Choosing. This is where the client or the purchasing firm selects the potential suppliers of
tv
sy

materials before and during the construction period.


ea

iii. Contracting. The purchasing department coordinates with the suppliers on when and how
the materials will be delivered to the site and they must lie within the budget of the project.
iv. Management control. How these materials will be utilized and controlled will determine
the successful completion of the project. This will be done by the management team of the
project.
v. Measurement. This is the last step of procurement as it represents the accountability of the
team that ensured the accomplishment of the project. There are several measurement
indicators in project management that have to be adhered to and their criteria met after the
project has been handed over to the client.

Allocation of resources involves scheduling the available resources appropriately required to


complete the project.
The following steps will ensure a good resource-allocation to ensure that the project is completed
within the estimated duration and does not exceed the budgeted cost.
i. The project is divided into different steps
ii. The available resources are assigned
iii. The different aspects of the resources are actuated.
iv. Resources are resolved and allocated as required
v. Ways of resource utilization are utilized.

852
Table 61: Procure, allocate and monitor site resource utilization according to the project scope
Month From To
June Survey Planning
July planning Foundation
August Foundation Materials & Building
Sep Building Other Finishes

4.3 Control project cost variation as per SOPs


The cost variation of the project is the numerical difference between the value of the project earned
and the actual cost of the project.
From the Sample Project budget
Value of the Project = 39,500
Actual cost of the Project = 42,000
Then, Cost variation 42,000 − 39,500 = 2,500

4.4 Prepare project financial report


The Project Financial Statements Report provides an Income Statement, Cash Flow and a Balance
om
Sheet for individual projects as they provide credibility and accountability on the expenditure
t.c

breakdown of the project’s allocated finances. This provides you with useful data for tracking
e

financial information related to individual projects according. The diagram below is an illustration
tv
sy

of project financial report


ea

853
om
et.c
tv
sy
ea

Figure 193: Project financial report


Source: www.blackbaud.com

Conclusion
This learning outcome covered management of construction project cost, project budget, project
cost variation and project financial report.

854
Further Reading

Read further on project financial report

22.3.5.3 Self-Assessment

Written Assessment
1. What is not part of the earned value calculations?
a) Unknowns that are known
b) Unknowns that are not known
c) Amount of work completed
d) Budget of the project
2. Which one of the following does not contribute to the success of a project
om
a) Procurement
t.c

b) Resource allocation
e

c) Monitoring of the project


tv
sy

d) Resource vandalism
ea

3. In project management, speed and dependability objectives are generally called?


a) Dependence
b) Vision
c) Time
d) Range
3. Summarize the various steps in ensuring a good resource allocation
4. Explain how uncertainties in project management are minimized.

Essay questions
Discuss the various ways of managing project costs

Case Study Assessment


Visit a nearby construction facility within your school and prepare a project management financial
report

Practical Assessment
From the visited construction facility within your school determine the tasks and the estimated
costs of each stage of construction

855
22.3.5.4 Tools, Equipment, Supplies and Materials
• Scientific Calculators
• Relevant reference materials
• Stationeries
• GPS
• Design Software
• Computer lab
• Relevant practical materials
• Labouratories (chemical, biological & soils)
• Internet
• Manuals and guidelines
• Project management software
• Measuring and drawing tool
• Printer/plotting device
• Codes of practice

22.3.5.5 References om
et.c
tv
sy

Mullen, A. (2010). Chron small business.


ea

Imbeah, W., & Guikema, S. (2009). Managing construction projects using the advanced
programmatic risk analysis and management model. Journal of Construction Engineering
and Management, 135(8), 772-781.
Iyer, K. C., & Jha, K. N. (2005). Factors affecting cost performance: evidence from Indian
construction projects. International journal of project management, 23(4), 283-295.
Hwang, B. G., & Ng, W. J. (2013). Project management knowledge and skills for green
construction: Overcoming challenges. International journal of project management, 31(2),
272-284.

856
22.3.6 Learning No 5: Manage Project Labour
22.3.6.1 Learning Activities
Learning Outcome No 5: Manage Project Labour
Learning Activities Special Instructions

5.1 Develop project labour guidelines • Group discussions


5.2 Establish labour levelling plan • Demonstration by trainer
5.3 Allocate staff • Online videos
5.4 Manage labour welfare • Power point presentation
5.5 Prepare project labour report • Exercises by trainee

22.3.6.2 Information Sheet No22/LO5: Manage Project Labour

Introduction to learning outcome om


This learning outcome deals with management of project labour through the development of
t.c

project labour guidelines, allocation of staff and management of labour welfare to ensure smooth
e
tv

implementation of work stages.


sy
ea

Definition of key terms


Project labour. This can be defined as the human resource that is employed in the project to
implement the idea portrayed in the designs and drawings. They include technicians, masons,
plumbers, electricians and drivers.

Content/Procedures/Methods/Illustrations
5.1 Develop project labour guidelines in line with Labour laws and FIDIC regulations
Labour guidelines are rules or guides that are developed to ensure the labourers work in harmony,
and towards one goal. Labour guidelines are crucial in a project as they affect how the employees
feel about their jobs. The labour laws and Fidic are statutory bodies that have set and defined rules
and regulations to ensure that any guidelines developed in a project protect the workers' rights.
According to the Fidic Redbook, the contractor is the one that organizes, houses, and compensates
any human resource employed in a project.
Developing labour guidelines is easy. You have to set rules that will favor the progress of the
project but, at the same time, withhold the rights of the human resource. The best way to develop
these guidelines is to involve all the workers to make sure you capture what would lead to
maximum productivity.
Remember that you should pay the right wages and observe the conditions of labour every time.
The rates of labour that are to be paid should not be lower than the industry's average rates.
857
The contractor should also comply with all the labour laws applicable to his personnel, including
those that relate to the employees' health, safety, and environment. Movement and welfare. The
employees are also required to adhere to all set laws concerning the project.
Work should only be carried out on the recognized days of work unless stated otherwise in the
agreement. The extra hours worked should be recognized and overtime and compensated.
There are many rights of employees that are to be considered by the managers when developing a
project labour guideline. Consult the Fidic Redbook for more.

5.2 Establish labour levelling plan


A labour leveling plan can be defined as a plan according to which start and finishing dates are
adjusted depending on labour limitation to create a balance between the demand of the labour and
the available supply. Creating this plan calls for a proper understanding of progress monitoring.
Since different people perform different tasks in a project, planning is key.
First, identify the number of activities that are supposed to be done in a specified time. Also, have
in mind the amount of workforce you have. Also, identify how many people and how much time
each task will need to complete. Once you have all that in mind, you can develop a histogram
based on the earliest start time of any activity to balance the labour resource. This tends to spread
om
the available workforce on the available tasks. It ends up rearranging the tasks according to the
available labour which we call levelling.
et.c

The final result of this is a plan that will show all tasks assigned with an equal balance between
tv

available labour and demand for the same, arising from the tasks.
sy
ea

5.3 Allocate staff


This is quite easy. However, there is a lot to consider. For you to do this effectively, you need to
have in mind. Have the tasks to be done, preferably have a list. Also, on the same list indicate the
skills demanded by that task and the number of staff it would require to implement. On the other
hand, have a list of the available workers and the skills possessed by each. What should follow
next is matching the tasks and the appropriate employees. In the process, you should remember to
consider the staff's availability of the interests of the task. Also, remember to observe the labour
guidelines stated by the statutory bodies fully.

5.4 Manage labour welfare


Labour welfare means the services, benefits, and facilities that the employer avails to the human
resource. They include accommodation and health services. They are provided to improve the
productivity of the labourers. Therefore, labour welfare management entails the coordination of
aspects carried out to ensure the comfort of the labour force is improved.
Managing the welfare of the employees is easy. All you need to do is have a clear understanding
of their individual needs. Ensure that they have been provided with proper housing, proper medical
services, and safety equipment at work.

858
The Fidic Redbook also dictates that the following should be done to the employees.
Supply of quality foodstuffs and clean water. Also, the management should work to ensure the
cultural and religious beliefs of all employees are upheld.
Last but not least, the employer should not employ any forced or compulsory labour.

5.5 Prepare project labour report


A labour report is a detailed report prepared to show all the labour charges attached to the project.
They include regular time, overtime, and also, the total number of work hours per employee. This
report also captured the employee number, name, and the task performed.
To prepare this report, you need all the mentioned details. You can create a simple spreadsheet
with a name column that corresponds to worked ours and total charges. Alternatively, you can use
the vision planning software. This uses data from the project to generate a detailed report.

Conclusion
This learning outcome covered project labour management. . From this outcome, the students
should be able to properly coordinate the human resource involved in a given project. Also, the
student should be able to prepare a number of reports concerning the human resource.
om
Further Reading
et.c
tv
sy
ea

Read further on labour resource management from the Fidic Redbook of 1999 and the labour laws
of Kenya document. These two resources are available online for free.

22.3.6.3 Self-Assessment

Written Assessment
1. Which one of the following is not a document that safeguards the rights of employees?
a) The Fidich Redbook
b) The labour laws of Kenya
c) Traffic regulations act
2. Which one of the following is a right of employees in accordance with the Fidic redbook.
a) Right to food and clean water
b) Right to practice religious and cultural beliefs
c) Right to drugs and alcohol

859
3. Briefly explain how a labour report is prepared
4. Explain, in details, any five clauses of the Fidic redbook, that are concerned with labour
management

Oral Assessment
Explain how inaccuracy of the labour report could affect project progress

Case Study Assessment


Visit a nearby construction site, and consult on their labour guidelines. List down the rights that
the management has considered.

Oral Assessment
From your visit to the site, how would you advice the management to improve the welfare of the
employees?

Practical Assessment
Prepare a detailed labour report for the day you visited the named site
om
22.3.6.4 Tools, Equipment, Supplies and Materials
t.c

• Scientific Calculators
e
tv

• Relevant reference materials


sy

• Stationeries
ea

• GPS
• Design Software
• Computer lab
• Relevant practical materials
• Labouratories (chemical, biological & soils)
• Internet
• Manuals and guidelines
• Project management software
• Measuring and drawing tool
• Printer/plotting device
• Codes of practice

860
22.3.6.5 References

Angell, R. L., & Kraemer, J. R. (2017). U.S. Patent No. 9,734,464. Washington, DC: U.S. Patent
and Trademark Office.
Dayarathna, Dushar. (2019). Employee Welfare Management.
Project Management for Construction: Labour, Material and Equipment Utilization. Cmu.edu.
(2020). Retrieved 25 June 2020, from
https://www.cmu.edu/cee/projects/PMbook/04_Labour,_Material,_And_Equipment_Utili
zation.html.

om
et.c
tv
sy
ea

861
22.3.7 Learning No 6: Manage Project Contracts
22.3.7.1 Learning Activities
Learning Outcome No 6: Manage Project Contracts
Learning Activities Special Instructions

6.1 Manage project documentation • Group discussions


6.2 Engage project stakeholders • Demonstration by
6.3 Inspect construction project works trainer
6.4 Manage project information • Online videos
6.5 Prepare project implementation report • Power point
presentation
• Exercises by trainee

22.3.7.2 Information Sheet No22/LO6: Manage Project Contracts

om
t.c

Introduction to learning outcome


e

This learning outcome deals with management of project contracts through various aspects such
tv
sy

as management of project documents, information, reports and inspection of project works. By


ea

completing this outcome, the students should be able to manage a civil engineering project to
completion.

Definition of key terms


Project implementation report: The project implementation report is a written document, usually
prepared by a project manager, whose purpose is to capture the progress of a given project. This
report seeks to guide the implementation of design ideas into reality.

Content/Procedures/Methods/Illustrations
6.1 Manage project documentation
Document management is very important for any project. Not just for its implementation but also
for future reference for future projects. The success of a project also depends on how well the
involved documentation is managed. Project document management is, therefore, defined as
applying practices and procedures used to produce, store, and distribute various types of project
documents. To manage project documents successfully, there are a few things that need to be done.
Number one is that project documents should be treated with the utmost care and respect. A proper
organizational structure for the document folders will be vital. Also, naming the documents using
meaningful conventions will help keep the documents in order. There should also be a clear rule
on how documents are shared. Access of documents should only be granted to necessary parties.

862
And once the time to return comes, there should be a clear protocol on how they are returned to
prevent mix-ups. Lastly, you should ensure that the specified practices are adhered to in all aspects
according to the capabilities and needs of the project.

6.2 Engage project stakeholders


Project stakeholders are the people who have a direct interest towards the ongoing project. In short,
these are the members of the project management team. They include, but not limited to, project
sponsors, users, managers, and engineers. These are mainly the people who have a direct
investment in the project, and their input can directly affect the outcome of the same project. There
is a need to come up with a stakeholder engagement plan. This is a plan that helps the manager
identify strategies and engagements required to bring active involvement of the stakeholders in the
execution of the project. To engage the stakeholders, the plan should advise you to identify them
as early as possible. It is not possible to engage stakeholders that you don't know of. Before you
even initiate the project, make sure you identify the stakeholders first.

Find a way of bringing the stakeholders together and get them talking. Invite them to important
project meetings. This will also help to solve any conflicts that may arise in the future. It would be
om
best if you always tried to understand others before being understood. This simply means that you
should always have the other people's perspective first before considering your own. For this to
et.c

work, you have to be a very great team player. To manage them, you need to be a keen listener. It
tv

would be best if you learned to listen before talking. Lastly, learn how to communicate courteously.
sy

The best way of doing this is by developing a good communication plan that involves all the
ea

stakeholders.

6.3 Inspect construction project works


Inspection of the works simply means monitoring and documenting the progress to ensure it aligns
with the plan in terms of timely and quality completion. For a successful inspection, there are a
few steps that need to be followed. Number one is to prepare fully for the inspection. Identify and
write down the topics that need to be covered during the inspection. Also, identify the premises
that you intend to inspect. It would be best if you remembered to inform the team on site of your
intention to visit for inspection. Once preparation is done, you can now visit the site. On the site,
the following should be done. One is to put on protective gear. This is to protect yourself from any
risks. Carefully inspect the progress of the work and note every step-in detail. This data will help
in report preparation. Besides monitoring the work, inspect and note down the following; the
welfare of the workers, housekeeping issues, readiness for emergency procedures, employee
relationships, wages and compensations, working hours, rest periods, and any other necessary
issue related to the project. Upon completion, close the inspection, and most importantly, prepare
a detailed progress report.

863
6.4 Manage project information
To successfully manage project information, you need to come up with a proper project
information management plan. This is a document that outlines the responsibilities and actions
involved in information management. The plan should capture the following.
• It should define which information is available to who and when
• It should define how the information on the project is collected
• It should define who has access to any information.
• Should define the responsibilities and qualifications of all the personnel involved in
collecting information.

6.5 Prepare project implementation report (Daily, Monthly, Project progress report)
You should be able to complete project implementation reports.
Daily report. This report captures daily construction progress. At the end of the closure of the day's
business, you should check on how much work was done and how much work remains. This report
aims at informing the management of the deliverables and milestones. Remember to focus on the
om
day's results other than activities. Make use of charts, graphs, tables, pictures, videos, and graphics.
t.c

Use short sentences and instead use data points.


e

Monthly report
tv
sy

This captures the monthly progress report. The procedure for preparing this report is just like that
ea

of the daily report. However, the monthly report should also capture the combined daily progress.
Project progress report
Just as it sounds, this document explains how far you have gone towards implementing the project.
Start by writing the heading of the progress report. This will capture the writer's name, the position
of the recipient, and the report subject.
Write the introductory paragraph. This is a brief composition that explains the project. It talks
about its purpose. Then proceed to the "works completed "part where a description of the works
done is captured. Any findings should be mentioned.
In the next section, you should capture any problems encountered by the Implementing team.
Prepare another section that highlights what your team intends to do moving forward. Finish with
a summary of the report.

Conclusion
This learning outcome covered project contracts management. The student is now confident on the
procedures and documents involved in monitoring progress of a civil engineering project.

864
Further Reading

Read further on project management from


http://www.uredjenazemlja.hr/UserDocsImages/dokumenti/oprojektu_dokumenti/Annual_Report
_2012_v.1.0.pdf

22.3.7.3 Self-Assessment

Written Assessment
1. Which one of the following is not done during inspection?
a) Inspect works progress
b) Take pictures
c) Write the report om
2. Which one of the following is not captured in the progress reports?
t.c

a) Structural Drawings
e

b) Images
tv
sy

c) Videos
ea

d) Tables
3. Which one of the following is not a possible stake holder in a project
a) Politicians
b) Engineers
c) Investors

Oral Assessment
Explain the reason for your choices of stakeholders.

Case Study Assessment


Visit a nearby ongoing project, with permission from the necessary authorities, do an inspection
and prepare a daily progress report.

Practical Assessment
Visit a nearby ongoing project, with permission from the necessary authorities, do an inspection
and prepare a daily progress report.

865
22.3.7.4 Tools, Equipment, Supplies and Materials
• Scientific Calculators
• Relevant reference materials
• Stationeries
• GPS
• Design Software
• Computer lab
• Relevant practical materials
• Labouratories (chemical, biological & soils)
• Internet
• Manuals and guidelines
• Project management software
• Measuring and drawing tool
• Printer/plotting device
• Codes of practice

22.3.7.5 References om
et.c
tv
sy

How to Write a Progress Report | AcademicHelp.net. AcademicHelp.net. (2020). Retrieved 25


ea

June 2020, from https://academichelp.net/business-writing-help/write-progress-


report.html.
Weil, D. (2008). A strategic approach to labour inspection. International Labour Review, 147(4),
349-375.
What is a Stakeholder in Project Management?. Wrike.com. (2020). Retrieved 25 June 2020, from
https://www.wrike.com/project-management-guide/faq/what-is-a-stakeholder-in-project-
management/.

866
22.3.8 Learning No 7: Manage Construction Materials, Plant, Tools and Equipment
22.3.8.1 Learning Activities
Learning Outcome No 7: Manage Construction Materials, Plant, Tools and Equipment
Learning Activities Special Instructions

7.1 Prepare site storage facility • Group discussions


7.2 Prepare construction materials (Roofing, Walling, Flooring, • Demonstration by
Finishing, and Reinforcing) schedule trainer
7.3 Prepare construction equipment (Excavation, Lifting, and • Online videos
Transporting) schedule • Power point
7.4 Procure construction materials and equipment presentation
7.5 Issue construction materials and equipment • Exercises by trainee

22.3.8.2 Information Sheet No22/LO7: Manage Construction Materials, Plant, Tools and
Equipment om
et.c
tv
sy

Introduction to learning outcome


ea

This learning outcome deals with management of construction materials through the preparation
of site storage facilities, preparation of material schedules, equipment schedules, and the
procurement of materials and inspection.

Definition of key terms


Construction materials: Also known as building materials, these are materials that are added to
the constructed structure. Examples include concrete, sand, cement, steel, aggregates bricks etc.

Construction equipment: These are machinery, structures, materials, tools or systems designed
for carrying out/executing construction works.

Content/Procedures/Methods/Illustrations
7.1 Prepare site storage facility
These are facilities for keeping civil construction equipment and even machines safely.
All engineering items are properly stored and managed under the stock management department.
This will for instance determine the storage volume and subsequently the amount of space
required. The store of these goods should be selected properly based on its accessibility, size and
proximity among other factors. Inspection by the store keeper must be done upon supply and
delivery of these goods.

867
They are also piled and properly managed for ease of removal whenever need arise.
Safety precautions through the use of precaution guidelines must be adhered to.
All civil engineering materials require proper handling, storage and usage for instance when
carrying them manually to work sites, stacking bricks and building stones or driving trucks loaded
with concrete. Given the number of hazards the employees face during storage such as falling
objects, improperly stack objects among others, training and education is necessary.
Factors to consider on preparation of site storage facility include:
• physical properties,
• organization
• security
• costs
• control
• Protection.

7.2 Prepare construction materials (Roofing, Walling, Flooring, Finishing, and Reinforcing)
schedule
Table 62: Construction materials om
Construction materials Uses
t.c

Roofing Timber Roofing. After the building is


e

Glass complete.
tv
sy

Iron sheets
ea

walling Concrete Construction wall building


Stone
Brick
Steel sheets
Timber
Clay blocks
Flooring Cement Floor construction:
Brick
Wood
Finishing Terrazo Construction work finishing
Tiles
Rubber
Wood
Glass and cork
stones
Reinforcing Steel bars Absorbs tensile and shear and
BRC mesh stresses

868
7.3 Prepare construction equipment (Excavation, Lifting, and Transporting) schedule
Table 63: Construction equipment
Construction Equipment uses
Excavation Earth moving equipments.
Excavators Excavating large volumes of
Graders mass.
Loaders
Backhoe
Bulldozers
Lifting Equipment Material handling-lifting
Crane
Conveyors
Hoists
Forklifts
Transporting Transporting construction
Tippers materials and equipments into
Dumpers and out of site. Also moving
Trailers
om wastes out of site.
t.c
Tankers
e
tv

7.4 Procure construction materials and equipment


sy
ea

Procurement of construction materials is normally done through a logical order. One first plans
what to contract then how to do it. You need to think of all the work that one will do so as to plan
for any purchases and acquisitions. Procurement procedures are followed.
i. Choosing of Suppliers to be invited to tender.
A client carefully chooses the list of suppliers to be invited to apply for the available tenders
for example when procuring construction materials and equipment.
ii. Request, appeal and tender submission
Tender request is delivered to potential suppliers and they carry the terms and conditions
of the tender contract. They are then required to submit back the proposals.
iii. Technical Evaluation.
Technical proposals is evaluated before the opening of the financial proposal so as to
ensure that it conforms to the conditions and requirements that was set.
iv. Process of negotiation and Awarding of contract:
Contract price is negotiated and other terms and conditions listed among tenderers.
v. Delivery, Inspection and Payment.
Equipment are delivered as agreed in the contract. Inspection is done to ensure the entire
delivered equipment meet the requirements.

869
7.5 Issue construction materials and equipment
Lee and Dobler define materials management as “a confederacy of traditional materials activities
bound by a common idea-the idea of integrated management approach to planning, acquisition,
conversion, flow and distribution of production materials.
Inspection
This can happen in two ways
• Pre-dispatch inspection
• Receipts from internal divisions.
The inspector inspects to inspect all the materials delivered to the site prior to being used in the
work.

Conclusion
This learning outcome covered management of construction materials, plant, tools and equipment.

Further Reading

om
et.c

Read further on construction equipment as illustrated in Construction Equipment Management


tv

Book by Giovanni Ciro, October 1998.


sy
ea

22.3.8.3 Self-Assessment

Written Assessment
1 Which equipment is used to remove earth?
a) Elevator
b) Crane
c) Excavator
2 The following are construction equipment, which among them is used to level the ground and
spread loose material.
a) Excavator
b) Grader
c) Tractor

870
3 Which of the following is not a flooring material?
a) Timber
b) Tiles
c) Concrete
d) Glass
4 Discuss the procedure for procuring construction materials and equipment
5 Distinguish the equipment and materials used to construct a slab.
6 Evaluate factors to consider for site storage facilities.

Essay question
Construction activities have an effect to the environment. With reference to road and building
construction, discuss. (20mks)

Oral Assessment
Why is it important to study how construction activities affect the environment?

Case Study Assessment


om
Make a visit to the nearest facility being constructed in your area and prepare a report on how they
manage their construction materials on a daily basis.
et.c
tv

Practical Assessment
sy

Make a visit to the nearest facility being constructed in your area and prepare a report on how they
ea

manage their construction materials on a daily basis indicating the financial allocation in each
stage of construction.

22.3.2.4 Tools, Equipment, Supplies and Materials


• Scientific Calculators
• Relevant reference materials
• Stationeries
• GPS
• Design Software
• Computer lab
• Relevant practical materials
• Labouratories (chemical, biological & soils)
• Internet
• Manuals and guidelines
• Project management software
• Measuring and drawing tool
• Printer/plotting device
• Codes of practice

871
22.3.8.5 References

Said, H., & El-Rayes, K. (2011). Optimizing material procurement and storage on construction
sites. Journal of Construction Engineering and Management, 137(6), 421-431.
Patel, K. V., & Vyas, C. M. (2011, May). Construction materials management on project sites.
In National Conference on Recent Trends in Engineering & Technology (pp. 1-5).
.

om
et.c
tv
sy
ea

872