s1 - Garcia Residence 250515
s1 - Garcia Residence 250515
GENERAL
FTB-1
B. CONCRETE AND REINFORCEMENT
FTB-1
FTB-1
FTB-1
1. ALL MATERIALS & WORKMANSHIP SHALL CONFORM TO THE LATEST BUILDING CODE WF - 150 SEE PLAN 400 Ø10 @ 300 O.C 3-Ø12 -
OF AMERICAN CONCRETE INSTITUTE (ACI - 318).
C1 C1 C1
2. ALL CONCRETE SHALL DEVELOP A MINIMUM COMPRESSIVE STRENGTH AT THE END
OF TWENTY EIGHT (28) DAYS WITH CORRESPONDING MAXIMUM SIZE AGGREGATE FTB-1 FTB-1 C3 FTB-1
AND SLUMPS AS FOLLOWS: WF-1 FTG-1 FTG-1 FTG-1
FTB-1
FTB-1
FTG-3
WF-1
LOCATION 28 DAYS STRENGTH MAX. SIZE AGGREGATE MAX. SLUM
CURBS & 2500 PSI(175kg/cm)² 1" (25 mm) 4" (100 mm)
SLAB ON
FTB-1
WF-1 C2 C1
GRADE
EXCEPT FTB-1
FOUND.
FTG-2 FTG-1
FTB-1
FTB-1
3
FOUND. & 3000 PSI(210kg/cm)² 4 " (19 mm) 4" (100 mm)
RETAINING
WALL, BEAM,
SLAB C2 C3 C1
3 FTB-1 FTB-1
COLUMNS 3000 PSI(210kg/cm)² " (19 mm) 4" (100 mm)
FTB-1
4
& SHEAR FTG-2 FTG-3 FTG-1
WALLS
FTB-1
WF-1
FTB-1
FTB-1
3. ALL REINFORCING BARS SHALL CONFORM TO ASTM A615 (PNS 49) GRADE 33 FOR
DIA. 12 AND SMALLER BARS AND GRADE 40 FOR DIA. 16 AND LARGER BARS COLUMN
HOOPS ARE ALL GRADE 33 BARS. C1 C1 C1
4. IN GENERAL THE LATEST EDITION OF ACI - 315, MANUAL OF STANDARD OF FTB-1 FTB-1 FTB-1
FTB-1
FTB-1
FTB-1
FTB-1
PRACTICE DETAILING REINFORCED CONCRETE STRUCTURES SHALL BE ADHERED
FTG-1 FTG-1 FTG-1
TO, UNLESS OTHERWISE SHOWN OR NOTED.
C1
5. MAINTAIN MAXIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS:
FTB-1 C1 FTB-1 C1 FTB-1 C1
WF-1
3
SUSPENDED SLAB___________________________________ 4" (19 mm) FTG-1 FTG-1 FTG-1 FTG-1
SLAB ON GRADE_____________________________________ 1 21 " (38 mm)
FTB-1
FTB-1
FTB-1
WALLS ABOVE GRADE________________________________1" (25 mm)
FTB-1
WF-1
WF-1
BEAM STIRRUPS & COLUMN TIES_______________________1 21" (38 mm)
WHERE CONC. EXPOSED TO EARTH
BUT POURED AGAINST FORMS_________________________ 2" (50 mm)
WHERE CONC. IS DEPOSITED
C1 C1 C1 C1
DIRECTLY AGAINST EARTH____________________________ 3" (75 mm)
FTB-1 FTB-1 FTB-1
6. SPLICES SHALL BE SECURELY WIRED TOGETHER & SHALL LAP OR EXTEND UNLESS
2 FOUNDATION DETAIL
FTB-1
FTB-1
FTB-1
FTB-1
FTG-1 FTG-1 FTG-1 FTG-1
OTHERWISE SHOWN ON DRAWINGS, SPLICES SHALL BE STAGGERED WHENEVER
POSSIBLE. S1 SCALE: NTS
C1 C1 C1 C1
7. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS, SHALL BE PROPERLY
POSITIONED & SECURED IN PLACE PRIOR TO PLACING OF CONCRETE. FTB-1 FTB-1 FTB-1
8. CONTRACTOR SHALL NOTE & PROVIDE ALL MISCELLANEOUS CURBS, SILLS, STOOLS, FTG-1 FTG-1 FTG-1 FTG-1
EQUIPMENTS, & MECHANICAL BASES THAT ARE REQUIRED BY THE ARCHITECTURAL,
ELECTRICAL, & MECHANICAL DRAWINGS.
9. ALL CONCRETE SHALL BE KEPT MOST FOR A MINIMUM OF SEVEN (7) CONSECUTIVE COLUMN SCHEDULE
DAYS IMMEDIATELY AFTER POURING BY THE USE OF WET BURLAP, FOG SPRAYING,
CURING COMPOUNDS OR OTHER APPROVE METHODS. C-1 DETAILS C-2 DETAILS C-3 DETAILS
10. STRIPPING OF FORMS AND SHORES: 250 200 400
FOUNDATION______________________________________ 24 HOURS
SUSPENDED SLABS EXCEPT WHEN
400
400
ADDITIONAL LOADS ARE IMPOSED___________________ 8 DAYS
600
WALLS___________________________________________ 18 HOURS
BEAMS___________________________________________ 14 DAYS