s1 - Garcia Residence 250515

The document outlines general construction notes and specific requirements for concrete and reinforcement in a building project. It emphasizes the need for shop drawings approval, verification of dimensions, and adherence to the latest building codes. Additionally, it details concrete strength requirements, reinforcement specifications, and proper curing methods to ensure structural integrity.

Uploaded by

Kevin P. Gozun
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views1 page

s1 - Garcia Residence 250515

The document outlines general construction notes and specific requirements for concrete and reinforcement in a building project. It emphasizes the need for shop drawings approval, verification of dimensions, and adherence to the latest building codes. Additionally, it details concrete strength requirements, reinforcement specifications, and proper curing methods to ensure structural integrity.

Uploaded by

Kevin P. Gozun
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

A.

GENERAL

1. CONSTRUCTION NOTES & TYPICAL DETAILS APPLY TO ALL DRAWING UNLESS


OTHERWISE SHOWN OR NOTED. MODIFIED TYPICAL DETAIL AS DIRECTED TO
SPECIAL CONDITIONS.

2. SHOP DRAWINGS W/ ERECTION & PLACING DIAGRAM OF ALL STRUCTURAL STEEL,


MISCELLANEOUS IRON, PRE-CAST CONCRETE ETC, SHALL BE SUBMITTED FOR
SCHEDULE OF FOOTING
ENGINEER'S APPROVAL BEFORE FABRICATION.

3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE ALL WORK IS TO BEGIN.


CHECK MECHANICAL & ELECTRICAL CONTRACTORS FOR CONDUITS, PIPE SLEEVES,
ETC, TO BE EMBEDDED IN CONCRETE.

4. IF SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADEQUATE SHORING


& BRACING OF THE STRUCTURE FOR ALL LOADS THAT MAYBE IMPOSED DURING
FTG-1 ISOLATED FTG 300 1300 1300 8-Ø16 8-Ø16 1500
CONSTRUCTION. 1300 1100
FTB-1 C1 FTB-1 C1 FTB-1 C1 ISOLATED FTG 300 8-Ø16 7-Ø16 1500
C1
FTG-2
FTG-1 FTG-1 FTG-1 FTG-1
ISOLATED FTG 300 1700 1500 12-Ø16 10-Ø16 1500
FTG-3

FTB-1
B. CONCRETE AND REINFORCEMENT

FTB-1

FTB-1

FTB-1
1. ALL MATERIALS & WORKMANSHIP SHALL CONFORM TO THE LATEST BUILDING CODE WF - 150 SEE PLAN 400 Ø10 @ 300 O.C 3-Ø12 -
OF AMERICAN CONCRETE INSTITUTE (ACI - 318).
C1 C1 C1
2. ALL CONCRETE SHALL DEVELOP A MINIMUM COMPRESSIVE STRENGTH AT THE END
OF TWENTY EIGHT (28) DAYS WITH CORRESPONDING MAXIMUM SIZE AGGREGATE FTB-1 FTB-1 C3 FTB-1
AND SLUMPS AS FOLLOWS: WF-1 FTG-1 FTG-1 FTG-1

FTB-1

FTB-1
FTG-3

WF-1
LOCATION 28 DAYS STRENGTH MAX. SIZE AGGREGATE MAX. SLUM

CURBS & 2500 PSI(175kg/cm)² 1" (25 mm) 4" (100 mm)
SLAB ON

FTB-1
WF-1 C2 C1
GRADE
EXCEPT FTB-1
FOUND.
FTG-2 FTG-1

FTB-1

FTB-1
3
FOUND. & 3000 PSI(210kg/cm)² 4 " (19 mm) 4" (100 mm)
RETAINING
WALL, BEAM,
SLAB C2 C3 C1

3 FTB-1 FTB-1
COLUMNS 3000 PSI(210kg/cm)² " (19 mm) 4" (100 mm)

FTB-1
4
& SHEAR FTG-2 FTG-3 FTG-1
WALLS

FTB-1
WF-1

FTB-1

FTB-1
3. ALL REINFORCING BARS SHALL CONFORM TO ASTM A615 (PNS 49) GRADE 33 FOR
DIA. 12 AND SMALLER BARS AND GRADE 40 FOR DIA. 16 AND LARGER BARS COLUMN
HOOPS ARE ALL GRADE 33 BARS. C1 C1 C1

4. IN GENERAL THE LATEST EDITION OF ACI - 315, MANUAL OF STANDARD OF FTB-1 FTB-1 FTB-1

FTB-1
FTB-1

FTB-1

FTB-1
PRACTICE DETAILING REINFORCED CONCRETE STRUCTURES SHALL BE ADHERED
FTG-1 FTG-1 FTG-1
TO, UNLESS OTHERWISE SHOWN OR NOTED.
C1
5. MAINTAIN MAXIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS:
FTB-1 C1 FTB-1 C1 FTB-1 C1

WF-1
3
SUSPENDED SLAB___________________________________ 4" (19 mm) FTG-1 FTG-1 FTG-1 FTG-1
SLAB ON GRADE_____________________________________ 1 21 " (38 mm)

FTB-1
FTB-1

FTB-1
WALLS ABOVE GRADE________________________________1" (25 mm)

FTB-1

WF-1
WF-1
BEAM STIRRUPS & COLUMN TIES_______________________1 21" (38 mm)
WHERE CONC. EXPOSED TO EARTH
BUT POURED AGAINST FORMS_________________________ 2" (50 mm)
WHERE CONC. IS DEPOSITED
C1 C1 C1 C1
DIRECTLY AGAINST EARTH____________________________ 3" (75 mm)
FTB-1 FTB-1 FTB-1
6. SPLICES SHALL BE SECURELY WIRED TOGETHER & SHALL LAP OR EXTEND UNLESS
2 FOUNDATION DETAIL
FTB-1

FTB-1

FTB-1

FTB-1
FTG-1 FTG-1 FTG-1 FTG-1
OTHERWISE SHOWN ON DRAWINGS, SPLICES SHALL BE STAGGERED WHENEVER
POSSIBLE. S1 SCALE: NTS
C1 C1 C1 C1
7. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS, SHALL BE PROPERLY
POSITIONED & SECURED IN PLACE PRIOR TO PLACING OF CONCRETE. FTB-1 FTB-1 FTB-1

8. CONTRACTOR SHALL NOTE & PROVIDE ALL MISCELLANEOUS CURBS, SILLS, STOOLS, FTG-1 FTG-1 FTG-1 FTG-1
EQUIPMENTS, & MECHANICAL BASES THAT ARE REQUIRED BY THE ARCHITECTURAL,
ELECTRICAL, & MECHANICAL DRAWINGS.

9. ALL CONCRETE SHALL BE KEPT MOST FOR A MINIMUM OF SEVEN (7) CONSECUTIVE COLUMN SCHEDULE
DAYS IMMEDIATELY AFTER POURING BY THE USE OF WET BURLAP, FOG SPRAYING,
CURING COMPOUNDS OR OTHER APPROVE METHODS. C-1 DETAILS C-2 DETAILS C-3 DETAILS
10. STRIPPING OF FORMS AND SHORES: 250 200 400

FOUNDATION______________________________________ 24 HOURS
SUSPENDED SLABS EXCEPT WHEN

400

400
ADDITIONAL LOADS ARE IMPOSED___________________ 8 DAYS

600
WALLS___________________________________________ 18 HOURS
BEAMS___________________________________________ 14 DAYS

B. CONCRETE AND REINFORCEMENT

1. FOUNDATION SHALL REST ON NATURAL SOIL, UNLESS OTHERWISE NOTED


BY THE ENGINEER, NO PART OF THE FOUNDATION SHALL REST ON FILL.

2. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AFTER FOOTING


EXCAVATION HAVE BEEN COMPLETED & PRIOR TO CONCRETING TO
CONFIRM THE DESIGN SOIL BEARING CAPACITY.

3. IN CASE, ACTUAL SOIL BEARING CAPACITY IS FOUND TO BE LESS THAN THE


ASSUMED, NOTIFY STRUCTURAL ENGINEER FOR PROPER REVISION OF
FOOTING DESIGN.
1 FOUNDATION PLAN
S1 SCALE 1:100MTS

PROPOSED TWO STOREY RESIDENTIAL


KEVIN P. GOZUN, RCE, RMP, SO-III
MR EDWIN & MRS VRETCHEN MARIE GARCIA S
- 0155053 354-666-513 1
5275755 01-03-2024 CSF PAMPANGA