(ITP) for Structural
(ITP) for Structural
FC-80300-W09-F04-EN 0
Document Title:
Company Revisions:
Rev.No Issue Date Revision Description Made by Checked by Approved By Acceptance code
Contractor Company
Contract No.:
Document title: Document no.: Rev.:
Inspection and Test Plan (ITP) for Structural FC-80300-W09-F04-EN 0
TABLE OF CONTENTS
1 Introduction 3
1.1 Scope 3
2.1 Definitions 3
3 References 4
Page 2 of 9
Document title: Document no.: Rev.:
Inspection and Test Plan (ITP) for Structural FC-80300-W09-F04-EN 0
1 Introduction
1.1 Scope
This Inspection and Test Plan (ITP) shall be used for the control of structural steel fabrication and installation at Aker
Solutions Egersund and Sandnessjøen for the project.
Monitor Point
M Activity subject to ongoing routine surveillance during the progress of the work, in accordance with
approved procedure(s). No notification required. (Spot check activity)
Review of Document.
R
A review of documentation or records. No notification required
Approval of Document
A
Approval of documents or records required. No notification.
Witness
W The verifying party shall be notified as stated in the contract or otherwise formally agreed. The
absence of a verifying party does not suspend the continuation of the execution process.
Hold
H The verifying party shall be notified as stated in the contract or otherwise formally agreed. Work
shall not proceed beyond a Hold point without authorisation from the verifying party
MC Mechanical Completion
Page 3 of 9
Document title: Document no.: Rev.:
Inspection and Test Plan (ITP) for Structural FC-80300-W09-F04-EN 0
3 References
Page 4 of 9
Document title: Document no.: Rev.:
Inspection and Test Plan (ITP) for Structural according to EN 1090-2 FC-80300-W09-F04-EN
Page 5 of 9
Document title: Document no.: Rev.:
Inspection and Test Plan (ITP) for Structural according to EN 1090-2 FC-80300-W09-F04-EN
Page 6 of 9
Document title: Document no.: Rev.:
Inspection and Test Plan (ITP) for Structural according to EN 1090-2 FC-80300-W09-F04-EN
M
Certificate
MRR
Area Manager logistic and FC-30101-W32-000-EN Controller,
2.1 Material Reception activities EN 1090-2 Material certificate Weekly reports
storage FC-70300-W01-000-NO Package Engineer,
MTO
Warehouse
Foreman
3.0 Cutting/preparations
Check that the materials are traceable
M
after cutting. The heat number shall be Area manager cutting and Drawing
3.1 FC-30101-W32-000-EN EN 1090-2 Weekly reports Production
transferred to the material returned to preparation Material certificate
Foreman
stock.
Area manager cutting and FC-00090-000-A17-NO Drawing M
3.2 Visually check of edge preparation EN 1090-2 Weekly reports
preparation FC-50100-W50-000-EN WI/WPS Weld inspector
4.0 Fit up
FC-00092-W04-000-EN Drawing M
4.1 Alignment and fit-up of welded Joints Construction manager EN 1090-2 Weekly reports
FC-50100-W15-000-EN WI/WPS Weld inspector
5.0 Before welding
FC-00092-W04-000-EN
Drawing M
5.1 Welding inspection before welding Welding coordinator FC-50100-W15-000-EN EN 1090-2 Weekly reports
WI/WPS Weld inspector
FC-50100-W50-000-EN
6.0 During welding
FC-00092-W04-000-EN
Heat input report M
6.1 Welding inspection during welding Welding coordinator FC-50100-W15-000-EN EN 1090-2 Weekly reports
WI/WPS Weld inspector
FC-50100-W50-000-EN
Page 7 of 9
Document title: Document no.: Rev.:
Inspection and Test Plan (ITP) for Structural according to EN 1090-2 FC-80300-W09-F04-EN
H
7.2 Bolt tightening – Structural Installation Manager FC-00093-W07-000-EN EN 1090-2 MCC Report
MC Inspector
WSL M
8.3 Magnetic Particle Testing NDT Manager FC-80100-W02-000-EN EN 1090-2 Weekly reports
Inspection reports NDT lvl 3 resp
WSL M
8.4 Penetrant testing NDT Manager FC-80100-W03-000-EN EN 1090-2 Weekly reports
Inspection reports NDT lvl 3 resp
WSL M
8.5 PMI Testing NDT Manager FC-80100-W10-000-EN EN 1090-2 Weekly reports
Inspection reports NDT lvl 3 resp
Ultrasonic testing of duplex and WSL M
8.6 NDT Manager FC-80100-W09-000-EN EN 1090-2 Weekly reports
austenitic stainless steel Inspection reports NDT lvl 3 resp
M
WSL Case reporting as
8.7 Radiation Protection NDT Manager FC-80100-W13-000-NO EN 1090-2 Radiation
Inspection reports required in procedure
Protection Officer
WPS
M
Visual inspection of final welding on Drawing
8.8 NDT Manager FC-80100-W01-000-EN EN 1090-2 Weekly reports Weld inspector
Structural Steel and Piping WSL
NDT resp
Visual report
M
8.9 Storage of radiographic films NDT Manager FC-80100-W14-000-EN EN 1090-2 Electronic archive
NDT lvl 3 resp
Page 8 of 9
Document title: Document no.: Rev.:
Inspection and Test Plan (ITP) for Structural according to EN 1090-2 FC-80300-W09-F04-EN
Page 9 of 9