11KV
200A GOS 11 KV LA
HG FUSE E
E E
2R X 3C X 95 Sqmm HT
XLPE UG CABLE
1R X 3.5C X 95 Sqmm 1R X 3.5C X 95 Sqmm 1R X 3.5C X 95 Sqmm 1R X 3.5C X 95 Sqmm 1R X 3.5C X 95 Sqmm
LT Al. Ar. UG CABLE LT Al. Ar. UG CABLE LT Al. Ar. UG CABLE LT Al. Ar. UG CABLE LT Al. Ar. UG CABLE
FEEDER 100 A FEEDER 100 A FEEDER 100 A FEEDER 100 A CI COVER HINGED
6.30 mm Ø
FILLER - 1 4P MCCB FILLER - 2 4P MCCB FILLER - 3 4P MCCB FILLER - 4 4P MCCB MS ROD TO CAST IRON FRAME
GL 30 CM GL
32 A 32 A 32 A 32 A
fuse fuse fuse fuse
LOOP CABLE
25 cm
cut out cut out cut out cut out 1200mm 12.5 CM
30 CM
FUNNEL
60 cm
GI CHECK NUTS
125 CM (Min)
15 cm
1R X 4C X 10 Sq mm LT UG CABLE TO EACH SITE 1R X 4C X 10 Sq mm LT UG CABLE TO EACH SITE 1R X 4C X 10 Sq mm LT UG CABLE TO EACH SITE 1R X 4C X 10 Sq mm LT UG CABLE TO EACH SITE GI NUTS
STREET
GI WASHER
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
LIGHT
20 CM
EARTHING
CONDUCTOR 50 mm Ø GI PIPE
1R X 3.5C X 95 Sqmm
LT Al. Ar. UG CABLE
1R X 3.5C X 95 Sqmm
LT Al. Ar. UG CABLE
1R X 3.5C X 95 Sqmm
LT Al. Ar. UG CABLE
1R X 3.5C X 95 Sqmm
LT Al. Ar. UG CABLE
1R X 3.5C X 95 Sqmm
LT Al. Ar. UG CABLE
N
FEEDER 100 A FEEDER 100 A FEEDER 100 A FEEDER 100 A
FILLER - 5 4P MCCB FILLER - 6 4P MCCB FILLER - 7 4P MCCB FILLER - 8 4P MCCB CHARCOAL LAYER
W E
15 cm
32 A 32 A 32 A 32 A SALT LAYER
6000mm
fuse fuse fuse fuse
6000mm
cut out cut out cut out cut out
38 mm Ø GI PIPE
S
7.5 cm
2.5 m (MIN)
1R X 4C X 10 Sq mm LT UG CABLE TO EACH SITE 1R X 4C X 10 Sq mm LT UG CABLE TO EACH SITE 1R X 4C X 10 Sq mm LT UG CABLE TO EACH SITE 1R X 4C X 10 Sq mm LT UG CABLE TO EACH SITE
ALTERNATE LAYER OF
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
TO SITE
CHARCOAL, COKE &
SALT
GL GL GL GL 15 CM 15 CM
BACK FILLED
BACK FILLED
1250
1250
SOIL
SOIL
FRONT & SIDE ELEVATION OF
1000
1000
380
750 750 GL GL GL GL
HT CABLE LT CABLE
PLAN SHOWING THE FEEDER APPROVING AUTHORITY :
12 WAY PHILLER BOX DETAILS
KEY PLAN
1520
760 760
11 KV LINE
1520 1520
1000
1000
1000
1000
9 KV 10 KA 9 KV 10 KA
11 KV LINE 200 A, GOS - 1 11 KV LINE LIGHTNING ARRESTOR LIGHTNING ARRESTOR
1000
1000
9 KV 10 KA
1000
TITTLE :
9 KV 10 KA
LIGHTNING ARRESTOR
1000
1000
1000
1000
1000
1000
1000
1000
1000
11 KV PIN INSULATOR
1000
1000
1000
1000
MI 11 KV HG FUSE
11 KV HG FUSE 11 KV HG FUSE 11 KV HG FUSE
1000
1000
TRANSFORMER
CLIENT :
11000
TRANSFORMER
GI PIPE PROTECTION FOR
11000
11000
1R X 3C X 95 X SQmm
4500
4500
4500
OUTGOING CABLE TO
4500
4500
SPUN POLE
3500
3500
3500
1250
1250
1250
1250
1250
GL GL GL GL
GL GL GL GL GL GL
GL GL
2500
2500
2500
2500
2500
2500
FRONT ELEVATION OF SIDE ELEVATION OF SIDE ELEVATION OF SIDE ELEVATION OF FRONT ELEVATION OF SPUN POLE FRONT ELEVATION OF
SPUN POLE STRUCTURE SPUN POLE STRUCTURE SPUN POLE MOUNTED 100 KVA TC (3 GOS) SPUN POLE MOUNTED 100 KVA TC MOUNTED 100 KVA TC (3 GOS) SPUN POLE MOUNTED 100 KVA TC (3 GOS)