Format for Major Project
Format for Major Project
B.Tech
in
CIVIL ENGINEERING
(Times New Roman 18 bold)
by
Author (Roll No.)
(Times new Roman 16 bold)
2019
(Times New Roman 16 bold)
© Lok Nayak Jai Prakash Institute of Technology (LNJPIT) 2019 (Times New Roman 10)
Department of Civil Engineering
Lok Nayak Jai Prakash Institute of Technology,Chapra
Declaration
I, , hereby declare that this minor project report titled “
” is carried outby me inthe Department of Civil
Engineering ofLok Nayak Jai Prakash Institute of Technology, Chapra. The work is original and
has not been submitted earlier whole or in part for the award of any degree/diploma at this or any
other Institution / University.
Certificate
This to certify that the minor project report titled “ “is
submitted by Name of the student in partial fulfillment of the requirements for the award of the
degree of Bachelor of Technology in Civil Engineering, LNJPIT, Chapra. The work is
comprehensive, complete and fit for final evaluation.
Name of theSupervisor
Assistant Professor
Department of Civil Engineering
LNJPIT, Chapra
Head of Department,
Departmentof Civil Engineering,
LNJPIT, Chapra
Date:
Instructions for Minor Project Report
Sequence of papers–
Part A
1 Coverpage Without copyright
4 Acknowledgement(Optional)
Note - Cover page & Inner page will be same except inner page will have copyright instruction.
Part B
5 Abstract (one page only)- - - - Roman page nos.(start)
6 List of Figures
7 List of Tables
8 Nomenclature
Part C
9 Index
11 Annexure
12 References
(Reference sequence number should be the order in which they appear in the report; to be
cited in square parenthesis)
Paper sizeA4, Margins: Top 1, Bottom 1.25, Left 1.5, Right 0.8(inches)
Page Nos .Bottom centre, Text Spacing1.5