JOB SAFETY ANALYSIS
Name of Work: Fabrication, Erection, Testing and Commissioning of Mild Steel Vertical Storage Tanks (IFRVT &
CRVT) and Horizontal Underground Tanks, Including Tank Foundation and Allied Works for the Upcoming
Petroleum Storage Terminal at Hinauti, Mirzapur, Uttar Pradesh,
Work Order No.- 29494330 date 20.12.2023.
Project :IOCL TOP Project, Hinauti, Mirzapur, Uttar Pradesh
PART-A: JSA No: Date: Work Permit No: Date:
IOCL/MZP/2023-2024/09
Unit: CIVIL/ Area: Blasting Shed & All Tanks Location: Blasting Shed & All Work Permit Type: HOT Work
MECHANICAL Tanks
Job Title: Blasting & Painting JSA Done By: Sign with Date
1
Job to be Executed by:
Department Contractor
CIVIL / MECHANICAL Adarsh Noble Corp Ltd
JSA Reviewed by (Name, Designation, Sign with Date)
1. Mr. Amabika Pr. Maharana (TCE,HSE) / Mr. Roshan Sarve (TCE, HSE) / Mr. Arvind Triparthi (TCE,RCM)
1. Mr. Surendra Kumar (IOCL,Sr.Mgr) / Mr. Arun Kr. Bharti (IOCL,Mgr) / Mr. Rahul Kumar (IOCL, Asst.Mgr)
JSA Approved by (Name, Designation, Sign with Date)
Mr. Uma Shankar Kumar (IOCL, Sr.Mgr)
Page 1 of 5
JOB SAFETY ANALYSIS
Name of Work: Fabrication, Erection, Testing and Commissioning of Mild Steel Vertical Storage Tanks (IFRVT &
CRVT) and Horizontal Underground Tanks, Including Tank Foundation and Allied Works for the Upcoming
Petroleum Storage Terminal at Hinauti, Mirzapur, Uttar Pradesh,
Work Order No.- 29494330 date 20.12.2023.
Project :IOCL TOP Project, Hinauti, Mirzapur, Uttar Pradesh
Sr. No. Sequence of Steps Potential Hazards Control Measures Person responsible
1 Training / Awareness to Accident hazard due to unqualified / 1. Check qualification / experience. Permit
Supervisor / Operator and inexperienced operator and precautions 2. Job responsibility to be clearly defined for each Receiver/Contractor
Job all Location to be taken not known to workers. individual.
3. Area should be cordoned off and only trained and
Injury/fatality due to confusion and at
authorized person to be allowed at site.
work site 4. Conduct tool box talk.
Job performed by untrained and
unauthorized person
2 Issuance of valid Work Injury/fatality when start work without 1. Ensure HOT work permit before commencement of Permit
permit permit. work. Receiver/Contractor
3 Use of PPEs Non-use of PPEs may cause injury to 1. Ensure that all the relevant PPEs are used before Permit
workers commencement of work Receiver/Contractor
4 Unloading / movements Fall of Loaded material due to improper 1. Proper supervision should be done. Permit
of Plates from trucks/ loading. 2. Housekeeping and area barricading should be done. Receiver/Contractor
trailers Improper slinging 3. Tool box talk to be carried out.
4. Proper coordination between operator and signal men
should be maintained.
5. TPI of lifting, tools and tackles & Vehicle should be
ensured.
Page 2 of 5
JOB SAFETY ANALYSIS
Name of Work: Fabrication, Erection, Testing and Commissioning of Mild Steel Vertical Storage Tanks (IFRVT &
CRVT) and Horizontal Underground Tanks, Including Tank Foundation and Allied Works for the Upcoming
Petroleum Storage Terminal at Hinauti, Mirzapur, Uttar Pradesh,
Work Order No.- 29494330 date 20.12.2023.
Project :IOCL TOP Project, Hinauti, Mirzapur, Uttar Pradesh
5 Defective equipment Human Injury 1. Follow lifting procedure. Permit
Defective tools and Material damage 2. Use correct equipment’s & lifting tackles. Receiver/Contractor
tackles 3. Use certified lifting tools only.
4. Do not over tight.
5. Deploy competent operator
6. Avoid workers working near the unloading area
7. Ensure no worker should be under the suspended load
8. Provide barricading around Swing area
9. Inspection should be carried out by a competent
personal of all equipment/Crane and Documents to be
submitted before taking to use.
10. TPI certificates to be submitted.
11. All the lifting tools and tackles should certify.
12. Induction training to be provided to the workers before
entering to site.
6 Blasting Injury 1. Follow blasting procedure. Permit
Hearing loss 2. Use correct equipment. Receiver/Contractor
Eye Protection 3. Use certified hose and hopper only.
4. Ensure proper hose connecters.
5. Deploy competent operator.
6. Avoid workers working near the blasting area.
7. Ensure proper exhaust of the produced dust.
8. Provide barricading around the blasting area.
9. Inspection should be carried out the compressor and
hopper regularly.
10. TPI certificates to be submitted.
11. Ensure all the PPEs for the blaster.
12. Ensure all the pressure gages are working properly.
7 Painting work Fire hazards 1. Proper chamber should be covered for painting. Permit
2. All electrical Connection should be operated by Receiver/Contractor
authorized and licensed electrician.
Page 3 of 5
JOB SAFETY ANALYSIS
Name of Work: Fabrication, Erection, Testing and Commissioning of Mild Steel Vertical Storage Tanks (IFRVT &
CRVT) and Horizontal Underground Tanks, Including Tank Foundation and Allied Works for the Upcoming
Petroleum Storage Terminal at Hinauti, Mirzapur, Uttar Pradesh,
Work Order No.- 29494330 date 20.12.2023.
Project :IOCL TOP Project, Hinauti, Mirzapur, Uttar Pradesh
3. All electrical machines should be double earthed
inside the heater chamber and properly connected
with ELCB/RCCB.
4. Power cables free from defects and with proper
insulation.
5. Industrial plug and socket shall be provided for power
distribution boards.
6. Painting at shell properly trained person because
trained person knows how to use painting
equipment’s.
8 Painting operation Health hazard (Metal fume fever, 1. Only trained and qualified painter should be Permit
irritation to eyes and throat) permitted for painting operation Receiver/Contractor
Fire and Explosion 2. Proper Ventilation must be required during painting
operation.
Heat stress or burns
3. Work permit should be arranged before starting the
painting operation
4. Maintain Housekeeping
5. Flammable material should not be stored near
operation area
13. Ensure sufficient fire-fighting facility near painting
operation area
6. Keep visual display or cordoned off the hot job.
7. Maintain safe distance from heating area.
8. Provide barricading for hot job and ensure that no
body work their hot work
9. Ensure all the PPEs for the Painter.
9 Clear site Accident due to unsafe condition 1. Remove the Painting and other Blasting materials Permit
accessories from site. Receiver/Contractor
2. Clear and remove debris etc. to a safe area.
Page 4 of 5
JOB SAFETY ANALYSIS
Name of Work: Fabrication, Erection, Testing and Commissioning of Mild Steel Vertical Storage Tanks (IFRVT &
CRVT) and Horizontal Underground Tanks, Including Tank Foundation and Allied Works for the Upcoming
Petroleum Storage Terminal at Hinauti, Mirzapur, Uttar Pradesh,
Work Order No.- 29494330 date 20.12.2023.
Project :IOCL TOP Project, Hinauti, Mirzapur, Uttar Pradesh
10 Housekeeping Accident due to Non-use of PPE’s 1. Ensure work site clean after work completion. Permit
Accident due to waste materials at 2. Use Proper PPE’s for housekeeping. Receiver/Contractor
work place 3. Ensure every use and waste materials segregate
properly.
Part–B:Compliance audit by the Location In-charge / DSO while the job is being executed
Sl. Recommended Observation Compliance Status Checked by Officer with sign, Remarks
No. Action /Procedures & date, and time
Control measure
Page 5 of 5